Production I.Yield. II.Acceptance criteria. III.Test. PS & SPD LHCb Calo PRR – March 2004 – CERN.

Slides:



Advertisements
Similar presentations
Lecture 3 Mixed Signal Testing
Advertisements

Muon Tracking FEE R.E. Mischke Los Alamos 10 September, 1999 presentation to the PHENIX Muon Arm Technical Advisory Committee.
Mixed Signal Chip Design Lab Analog-to-Digital Converters Jaehyun Lim, Kyusun Choi Department of Computer Science and Engineering The Pennsylvania State.
18/05/2015 Calice meeting Prague Status Report on ADC LPC ILC Group.
Universitat de Barcelona Università di Roma 'La Sapienza' Front End Electronics for the SPD of LHCb Electronics in Experimental High Energy.
Werner Riegler CERN, November 2003 CARIOCA Werner Riegler, CERN November 24 th, 2003, LHCb week Discussion of the final Prototype results Plans for CARIOCA.
MDT-ASD PRR C. Posch30-Aug-02 1 Specifications, Design and Performance   Specifications Functional Analog   Architecture Analog channel Programmable.
ARA Testbed Efficiency (Rough Cut) November 29 th Ben Rotter.
End Cap Board Testing Status at Penn July 14, 2004 Anton & Campion Mitch.
ATLAS TRT R. Van Berg, Sept. 2, ASDBLR & DTMROC Testing Production Run Completion Rick Van Berg for Gabe Hare, Mike Reilly.
NA62 front end Layout in DM option Jan Kaplon/Pierre Jarron.
NA62 front end architecture and performance Jan Kaplon/Pierre Jarron.
A.Kashchuk Muon meeting, CERN Presented by A.Kashchuk.
1 SciFi electronics meeting – CERN– June 20 th 2011 Some ideas about a FE for a SciFi tracker based on SiPM A. Comerma, D. Gascón Universitat de Barcelona.
Short study of a very simple LVDS shift The Barcelone VFE chip output is CMOS, -1.65/+1.65 volt. This output is then convert into serial LVDS format. Without.
MDT-ASD PRR 28 Aug ’02 J.Oliver Quality Assurance, Production Testing, Database Chip certification, required tests Expected yield QA – Test plan  Production.
Understanding ADC Specifications September Definition of Terms 000 Analogue Input Voltage Digital Output Code FS1/2.
26/06/2003Nigel Smale University of Oxford Introduction The BeetleMA0 back-up solution. A readout chip that complies to the LHCb read out specifications.
Readout ASIC for SiPM detector of the CTA new generation camera (ALPS) N.Fouque, R. Hermel, F. Mehrez, Sylvie Rosier-Lees LAPP (Laboratoire d’Annecy le.
CARIOCA (Cern and RIO Current Amplifier). The CARIOCA chip has 8 binary output, therefore DIALOG has 16 PCH as input channels and has up to 8 LCH as output.
Instrumentation (AMME2700) 1 Instrumentation Dr. Xiaofeng Wu.
Preliminary measurements for the 8 channel prototype of SPD discriminator ASIC I.The 8 channel prototype. II.Status of the test. III.Noise. IV.Gain. V.Test.
Charge measurement with TDC per pixel architecture G. Dellacasa, S. Garbolino, F. Marchetto, G. Mazza, A. Rivetti I.N.F.N. Sezione di Torino, Via Pietro.
SCT Week -CERN- September 23, Defective ASIC’s A. Ciocio - LBNL.
First results from PADI-2 Mircea Ciobanu CBM Collaboration Meeting March 10 –13, 2009 GSI-Darmstadt FEE1.
Fundamentals of Electric Circuits Chapter 5 Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
Analog Building Blocks for P326 Gigatracker Front-End Electronics
Hold signal Variable Gain Preamp. Variable Slow Shaper S&H Bipolar Fast Shaper 64Trigger outputs Gain correction (6 bits/channel) discriminator threshold.
The DRS2 Chip: A 4.5 GHz Waveform Digitizing Chip for the MEG Experiment Stefan Ritt Paul Scherrer Institute, Switzerland.
1 G.Pessina, RICH Elec Upg, 11 April 2010 Analog Channels per chip4 to 8 Digital channel per chip4 to 8 Wire-bond pitch (input channels) Input capacitance.
28 June 2010 LHCb week St Petersburg M.N Minard 1 Calorimeter status Hardware status Controls & monitoring Timing alignment Calorimeters calibration Pending.
SPD Very Front End Electronics Sonia Luengo Enginyeria i Arquitectura La Salle (EALS) Barcelona (SPAIN)
LHCb Calorimeter Upgrade Meeting – 10th September 2012 – CERN LHCb Calorimeter Upgrade Electronics: ASIC solution status E. Picatoste, D. Gascon Universitat.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
LC Power Distribution & Pulsing Workshop, May 2011 Super-ALTRO Demonstrator Test Results LC Power Distribution & Pulsing Workshop, May nd November.
Slide 1Turisini M. Frontend Electronics M.Turisini, E. Cisbani, P. Musico CLAS12 RICH Technical Review, 2013 June Requirements 2.Description of.
COMMUNICATION SYSTEM EEEB453 Chapter 5 (Part III) DIGITAL TRANSMISSION Intan Shafinaz Mustafa Dept of Electrical Engineering Universiti Tenaga Nasional.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
S. Bota – Calorimeter Electronics overview - July 2002 Status of SPD electronics Very Front End Review of ASIC runs What’s new: RUN 4 and 5 Next Actions.
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
Calorimeter upgrade meeting – LAL /Orsay – December 17 th 2009 Low noise preamplifier Upgrade of the front end electronics of the LHCb calorimeter.
S.MonteilPS COMMISSIONING1 MaPMT-VFE-FE ELECTRONICS COMMISSIONING AND MONITORING. OUTLINE 1)Ma-PMT TEST BENCHES MEASUREMENTS 2)VFE AND FE ELECTRONICS FEATURES.
CERN PH MIC group P. Jarron 07 November 06 GIGATRACKER Meeting Gigatracker Front end based on ultra fast NINO circuit P. Jarron, G. Anelli, F. Anghinolfi,
CSNSM SPACIROC S. Ahmad, P. Barrillon, S. Blin, S. Dagoret, F. Dulucq, C. de La Taille IN2P3-OMEGA LAL Orsay, France Y. Kawasaki - RIKEN,Japan I. Hirokazu.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
C.Beigbeder, D.Breton, M.El Berni, J.Maalmi, V.Tocut – LAL/In2p3/CNRS L.Leterrier, S. Drouet - LPC/In2p3/CNRS P. Vallerand - GANIL/CNRS/CEA SuperB -Collaboration.
Networked Embedded Systems Sachin Katti & Pengyu Zhang EE107 Spring 2016 Lecture 13 Interfacing with the Analog World.
1 Status Report on ADC LPC Clermont-Ferrand Laurent ROYER, Samuel MANEN Calice/Eudet electronic meeting London 2008.
Ultra-Fast Silicon Detector 1 This report is a summary of what was shown at IEEE. Nicolo Cartiglia, INFN, Torino - UFSD - RD50 CERN 2014 Nicolo Cartiglia.
DAQ ACQUISITION FOR THE dE/dX DETECTOR
PreShower Characterisations
Ivan Perić University of Heidelberg Germany
Quiz: Determining a SAR ADC’s Linear Range when using Operational Amplifiers TIPL 4101 TI Precision Labs – ADCs Created by Art Kay.
A 12-bit low-power ADC for SKIROC
A General Purpose Charge Readout Chip for TPC Applications
Fundamentals of Electric Circuits Chapter 5
CTA-LST meeting February 2015
Analog FE circuitry simulation
Functional diagram of the ASD
Basics of Converter Technology
Calorimeter Upgrade Meeting
EUDET – LPC- Clermont VFE Electronics
Converter common specs
Optical links in the 25ns test beam
Functional diagram of the ASD
Converter common specs
Fundamentals of Electric Circuits Chapter 5
Front-end Electronics for the LHCb Preshower Rémi CORNAT, Gérard BOHNER, Olivier DESCHAMPS, Jacques LECOQ, Pascal PERRET LPC Clermont-Ferrand.
Chapter 5 Operational Amplifiers
Verify chip performance
Presentation transcript:

Production I.Yield. II.Acceptance criteria. III.Test. PS & SPD LHCb Calo PRR – March 2004 – CERN

I. Yield. According to these results yield is about 85 %. No defect48 (40 in EDQUAD TQFP and 8 in JLCC) Supply short2 (EDQUAD TQFP) Digital interface error4 (2 EDQUAD TQFP and 2 JLCC) 1 subchannel is dead2 (EDQUAD TQFP)

II. Acceptance criteria (I). Possible scenario (using PMT load resistors of 470  ): –Signal 0 – 25 ns about 76 % and tail 25 – 50 ns about 22 % –MIP signal 0 – 25 ns between 83 and 21 mV for PMT uniformity factor of 4 (gain is 1.1 mV/fC). –Noise 2 mV r.m.s. –SNR for MIP signal is between 40 and 10. –Resolution is given by the LSB of the internal DAC, LSB=3.2 mV seems to be enough to cover the offsets of about the 95% of the chips. –Resolution between 4 % and 16 %. SNR can be increased if needed with larger PMT load resistors. It is possible to compensate the PMT gain non-uniformities and the ASIC offsets tuning the input resistors. DAC: Offset = 0 LSB = 4 Offset: µ = -70  = 55 µ-2.5  = LSB= -200 µ+2.5  = LSB= MIP 83 max. 143 Units are in mV

II. Acceptance criteria (II). Defects are found in about 15% of the chips. No special rejection criteria on offset is needed. No rejection criteria on linearity or pile-up correction seems to be needed since all the chips that have been tested are within requirements. A yield >80% is assumed To equip 100 boards, 800 chips are needed. To keep 20% of spare chips, a production of 1250 units is required

III. Test. The following points should be included in the test of the complete production: –Offset –Gain –Pile-up correction –Digital interface A new VHDL code is under development to accelerate the test (it will include threshold scan algotiyhms).