Status Report for E391a (Continuation of the previous PAC on April) G.Y.Lim IPNS, KEK Group Meeting at the JINR 26 th – 29 th July 2003 Dzhelepov Laboratory.

Slides:



Advertisements
Similar presentations
Liverpool LHCb Planning. April (2001) –Clean room (production facility) handover and qualification (April 19) (delayed to May 10) –Thermal model Results.
Advertisements

Xenon Detector Status Liquid Xenon Group. 1 Outline Cryostat construction –Honeycomb panel test at Pisa –Assembly –Cryogenic test at SIMIC –Leak test.
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Detector Systems Update MICO March 17, MICE Detector Systems  CKOV u Mississippi RAL  TOF0/1 u Hamamatsu PMT assemblies show an increasing.
RF Measurement Plan Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory January 20, 2011 MICE Video Conference Meeting.
HOW TO MAKE A CLIMATE GRAPH CLIMATE GRAPHING ASSIGNMENT PT.2.
MICE: The International Muon Ionization Cooling Experiment Diagnostic Systems Tracker Cherenkov Detector Time of Flight Counters Calorimeter Terry Hart.
SHMS Detector Commissioning and Installation Howard Fenker Hall-C Users Meeting Jan-2015.
COBRA Magnet Test Milestone AssemblyDesignManufactoring DesignAss.TestWinding & Cryo. Deliv. PSI Test Platform Calibration Mapping device.
Status of Atlas Tile Calorimeter and Study of Muon Interactions L. Price for TileCal community Short Overview of the TileCal Project mechanics instrumentation.
1. Status of RHICf proposal and plans 2. T dependence correction (by Matsubayashi) Takashi SAKO STEL/KMI, Nagoya University 1LHCf A2 meeting in Catania20-Dec-2013.
Challenges and Overview From Technical Coordination 27/08/2013 -FH1.
Jiawen Zhang, IHEP, 2008, April 10, frascati Status of BEPCII/BESIII and Physics preparation Jiawen Zhang 2008/4/7—10 , PHIPSI08, Frascati.
Status of cavity fabrication facility at KEK H. Hayano, KEK Cavity Industrialization Study at KEK Superconducting RF Cavity Technology and Industrialization.
Status of E391a Search for K L    decay G.Y.Lim IPNS, 32nd ICHEP 19 th August 2004 Beijing.
11 Status of Neutrino Beamline Construction T.Kobayashi IPNS, KEK Jan.8, 2008 J-PARC PAC.
DVCS-2 Assembly & Installation Charles Hyde DVCS Collaboration Meeting 18 December 2009 Clermont-Ferrand.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
HCAL status and plans Yu. Guz.  Finally, no dead cells in the run However: There are unstable PMTs (mainly rate effect) Dark current.
This is an example text TIMELINE PROJECT PLANNING DecOctSepAugJulyJuneAprilMarchFebJanMayNov 12 Months Example text Go ahead and replace it with your own.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
1 Status of Neutrino Beamline Construction K. Nishikawa IPNS, KEK 2006 . 12 . 4.
Technical Support Activities in PH-ADO-PO
RP detectors CTS Sensors now in production, full delivery between February and June 07 Production GUI and DB being finalised Test Procedure being defined.
1234 Dec Jan Feb 2007 Delivery of 500 MPPCs MPPC numbering Mass check MPPC soldering WLSF megastrip source scan ACFA Shipping Feb-14.
Status of E391a G.Y.Lim IPNS, KEK. K L    decay Experimental difficulties  Tiny branching fraction Great number of K L decays  Weak Kinematical constaints.
Status Report for KEK-PS E391a KEK IPNS G.Y.Lim 14 April 2003.
IoP HEPP Lancaster 31/03 – 02/04/08 Gavin Davies Dr. Athanasios Hatzikoutelis Dr. Laura Kormos Lancaster University T2K UK Collaboration  DS-Ecal Design.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
LHCf: installation & commissioning Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
Measurement of K L    decay G.Y.Lim IPNS,KEK. Why K L →    ? Flavor Changing Neutral Current Br(K L   o  ) = 6  1 ・ Im(V td V ts ) 2 X 2 (x.
KPS Chonbuk University 2005/10/22 HYUNSU LEE Status of the KIMS dark matter search experiment with CsI(Tl) crystals Hyun Su Lee Seoul National.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
Taikan SUEHARA, IN2P3-KEK collaboration meeting on ATF2, Annecy, 2007/10/15 Shintake Monitor: Installation and Commissioning Schedule Taikan SUEHARA, The.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
This is an example text TIMELINE PROJECT PLANNING DecOctSepAugJulyJuneAprilMarchFebJanMayNov 12 Months Example text Go ahead and replace it with your own.
Dec
Status of E14 G.Y.Lim IPNS, KEK. E14 Experiment Step-by-step approach to precise measurement of Br( K L    ) KEK-PS E391a J-PARC E14 (Step-1) J-PARC.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Status Report toward the Beam Test Quick report on the MPPC mass check Other beam test related issues –Schedule –Participants –Jobs –etc … Satoru Uozumi.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
Current Status of E14 Experiment at J-PARC 정명신, 김용주 1, 우종관 1, 고재우 1, 임계엽 2, 김은주 3, 안정근 4, 이효상 5 한양대학교, 1 제주대학교, 2 KEK, 3 전북대학교, 4 부산대학교, 5 서울대학교.
Status of the Spanish contribution to CTF3 L. García-Tabarés, F. ToralCERN, 17/9/2006.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
1 Kazuhiro Yamamoto Institute for Cosmic Ray Research The university of Tokyo LCGT internal review (Cryogenic payload) 30 January 2012.
Status of the NOνA Experiment Satish Desai - University of Minnesota For the NOνA Collaboration APS Meeting - April 2013 Denver, Colorado.
1 DarkSide Collaboration APC Paris, France Augustana College, USA Black Hills State University, USA Fermilab, USA IHEP, China INFN Laboratori Nazionali.
Mitglied der Helmholtz-Gemeinschaft Status of day-one experiment commissioning at COSY Huagen Xu Goa, Mar
WP2 (Detector development) Summary Gabriella Pugliese INFN – Politecnico of Bari.
News From KEK S.Tanaka. FY2010 prelim. run schedule 2 Long-term Scheduling Committee (Uno) Max. : 12-May ~ 30-June actual run time is not decided yet.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
The PSD at Pb-Pb run PSD drawbacks at Ar beam
Introduction to the E391a.
J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting
Complementary ISTC Projects #3888, 3889p
The Beam Test at Fermilab:
The SABRE Crystals Frank Calaprice.
10/month is the present production rate 2 FTE + sporadic contributions
Status Report on E-166 Undulator-Based Production of Polarized Positrons K.T. McDonald Princeton University EPAC Meeting SLAC, November 15, 2003.
Advanced Research Electron Accelerator Laboratory
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Text for section 1 1 Text for section 2 2 Text for section 3 3
Births as per Civil Registration System,
Month Rainfall (mm) Temp Jan Feb March 34 April 38 May June July
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
Objective - To make a line graph.
Teleconference ACS – FREIA 19th June 2017
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Presentation transcript:

Status Report for E391a (Continuation of the previous PAC on April) G.Y.Lim IPNS, KEK Group Meeting at the JINR 26 th – 29 th July 2003 Dzhelepov Laboratory of Nuclear Problems

After the previous PAC Start assembling the front barrel Continuous fabrication of the central barrel Evacuation test of the downstream section

E391a Detector Upstream section Downstream section Middle Section

Upstream Section Module fabrication was done – Dec Instrument for assembling was fabricated – Collaboration work with KEK machine shop Start assembling - August 2003 – Will take one month Evacuation/cosmic test will be done Sep. 2003

Slide show for FB assembling 5 th August 2003

Continuously 22 nd August (Expected)

CC02 Shashlik type of beam counter Arrived at KEK on 4 th July from U. of Chicago Beam test at pi2 July 2 nd ~8 th, % 1GeV, 10 p.e./MeV deposit (Very preliminary !!!)

After CC02 installation ・・・ Aiming to finish by the end of August

Middle section Module fabrication – Final stage

50 plates/week Finish at the middle of Sep.

Stacking on every Wed. Working more than 8 person End of September

Middle section Module fabrication – Final stage Vacuum vessel is being constructed – Competition bid – Hitachi Zosen Ltd. – Will arrive at KEK at the end of Oct Assembling scenario was fixed – Collaboration work with Entek Assembling will be done by the middle of Dec. 2003

Downstream section Assembling was finished – Sep Beam test (Engineering run) – Oct. – Dec Evacuation test – June 2003 – First time of operation for calorimeter in vacuum – Test for the water cooling mechanism

Cooling System Control PMT temperature within 1 0 C with circulating water

Installation of the cooling system

Temperature Measurement Divider CsI

We got clear Cosmic response 5 0 C Cooling water10 0 C Cooling water 15 0 C Cooling water20 0 C Cooling water p Q/cm

Temp. dependency Cosmic Peak position Cosmic Peak width(sigma) Normalized by the engineering data CsI temp. ( 0 C) MeV/pC Light Yield : -1.3% / 0 C

Schedule Aug. Sep. Oct. Nov. Dec. Jan. Feb. FB assembling CB fabrication CB assembling Cosmic test/counter tuning Start data taking Evacuate system Unite three sectionsCheck Membrane Moving downstream Cosmic and evacuate test for the upstream A/D Card upgrade ADC Replacement BA and CC05 installation CV PMT install CC04/CC05 Fabrication CC04 Installation Cooling system for Barrel Additional Cabling Downstream vacuum test Middle section fabricationMembrane BCV Beam

Summary E391a is aiming at measuring the BR( K L    ) – Realizing Step-by-step Preparation of E391a – Three parts are being prepared in parallel – Manage to catch up the schedule Prompt start – Well tuned electronics and DAQ at the engineering run – Cosmic test for each detector components – Minimum beam time for tuning