1 Briefing for Blue Plains Regional Committee on Potomac Interceptor Capacity Analyses June 28, 2007 District of Columbia Water and Sewer Authority.

Slides:



Advertisements
Similar presentations
The CSO Abatement Project Presented by: Paul Nordstrom Director of Operations and Engineering.
Advertisements

Modeling of Flood Inundation in Urban Areas Including Underground Space Kun-Yeun Han, Gwangseob Kim, Chang-Hee Lee, Wan-Hee Cho Kyungpook.
Bergen County Utilities Authority Bergen County Utilities Authority Little Ferry, New Jersey Rain Derived Infiltration/Inflow Reduction and Sanitary Sewer.
Strategic Process Engineering Liquid Treatment Processes at the Blue Plains Advanced Wastewater Treatment Plant Tier 1 Workshop Blue Plains Users October.
1 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager July 17, 2012 DC WATER Hosted by: DBIA-MAR Monthly Luncheon Water Wastewater.
Fay, Spofford & Thorndike TOWN OF BELMONT WINN’S BROOK SEWER OVERFLOW MITIGATON Presentation to the BOARD OF SELECTMAN December 7, 2009.
The Metropolitan District Clean Water Project Update Connecticut Watershed Network Conference May 11, 2012.
ADRICOSM-EXT PROJECT (ADRIatic sea integrated COastal areaS and river basin Management system pilot project - EXTension) WP2 – INTEGRATED CATCHMENT SIMULATOR.
Spokane River Forum 26 May 2013 Spokane’s CSO Reduction Status.
City of Fargo Meadow Creek Area Flood Risk Management – Project 5944 Public Information Meeting June 21, 2010.
Introduction to Surface Water Hydrology and Watersheds Lecture 1 Philip B. Bedient Rice University November, 2000.
Overview of Urban Drainage Flood Prediction Methods and Approaches J.Y. Chen1 and B.J. Adams2 1. Water Survey Division, Environment Canada 2. Department.
1 Supplying Water in an Uncertain Future: Including Issues of Water Resources, Wastewater Treatment, and Stormwater Management Roland Steiner Washington.
1 Anglian Water - Sewernet David Singerton, Innovation Projects Manager Evolving an Extreme Rainfall Management system Sewernet proposals 20 th November.
Analyses of Rainfall Hydrology and Water Resources RG744
1 Piney Branch Drainage Area Piney Branch Tunnel Rock Creek 049 Piney Branch Stream Rock Creek Current Plan Proposed Plan 049 CSO Outfall 16 th St Irving.
Do You Know Where Your Peak Flow Is?. - OR – Why Everyone Needs to Know About Blending Presented at BACWA Wet Weather Management Workshop May 28, 2008.
- SEWER REHABILITATION - A TEN-STEP STRATEGIC PLAN GEORGE KURZ, P.E., DEE * A significant portion of this work was conducted.
Wastewater Collection System Optimization An Innovative Approach to Capital Improvement Planning COPYRIGHT – OPTIMATICS PTY LTD
The Application of a Real-Time Operational Water Resources Decision Support System (DSS) for the Orange-Fish-Sundays Water Transfer Scheme 18 th October.
Multi-Jurisdictional Use Facilities O&M Flow Share Review February 28, 2013 Update with 4 Alternative Approaches.
Regional Wastewater Flow Forecast Model (RWFFM) WRTC Presentation (04/28/2015) WRTC Meeting 04/28/20151.
Rush River Assessment Project Hydrologic Flow Study Sibley County SWCD Presentation to the Minnesota River Research Forum March 10, 2005.
Effect of Climate Change on Sewer Overflows in Milwaukee WEFTEC 2012 October 2012 Bridging the gap between climate change research and the risk of overflows.
1 Underground Asset Management Jonathan Mongie. 2 Asset Management ► Improved Asset Condition l Increased System Efficiency ► Prolonged Asset Life l Reduced.
DC Position on IMA Negotiations Presented to the Blue Plains Regional Committee September 29, 2008 Government of the District of Columbia Adrian M. Fenty,
1 Briefing for BPRC on Potomac Interceptor Capacity Analysis December 20, 2007 District of Columbia Water and Sewer Authority.
1 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager August 29, 2012 Revised August 30, 2012 Operating Agency Workgroup.
Briefing on IMA Negotiation Issues Presented to: Blue Plains IMA Negotiating Team Operating Agency Work Group March 11, 2010 District of Columbia Water.
1 Briefing Materials Flow and Nitrogen Issues By: D.C. Water and Sewer Authority February 28, 2008 Blue Plains Regional Committee Presented to: District.
1/38 Urban Flood & Climate Change ----information from APWMF and SIWW Jinping LIU Hydrologist Typhoon Committee Secretariat.
Charlotte-Mecklenburg Il Problem CE 572 Spring 2006.
1 Discussion Points for IMA Participants – Flow Studies December 19, 2006 District of Columbia Water and Sewer Authority.
COG’s Water Resources Program and Regional Water Fund: A Brief History Presentation to: Blue Plains Regional Committee March 22, 2007.
Construction Technology: Substructure DW57 34 Outcome 2 Methods of groundwater control.
1 Briefing for IMA Participants on Results of Flow Studies October 31, 2006 District of Columbia Water and Sewer Authority.
Multi-Jurisdictional-Use Facilities Capital Cost Allocation Study Update Presented to Blue Plains Regional Committee December 20, 2010 District of Columbia.
Delon Hampton and Associates, Chartered EPMC 3B Joint-Use Facilities Capital Cost Allocation Study Presented to Environmental Quality & Operations Committee.
US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Manual Update Joan Stemler St. Louis District Water Control.
COG staff - Presentation to WRTC September 6, 2013 COG’s Round 8.2 Cooperative Forecast & Regional Wastewater Flow Projections.
Update to the 1992 Dry Creek Watershed Flood Control Plan CESI/RBF RR/KM FEMA CTP HYDROLOGY.
City of Alexandria, Virginia Sanitary Sewer Master Plan February 23, 2013 City Council Public Hearing.
Strategic Process Engineering Liquid Treatment Processes at the Blue Plains Advanced Wastewater Treatment Plant Introductory Workshop for Blue Plains Users.
Metropolitan Council Environmental Services A Clean Water Agency Proposed Combined Sewer Overflow Changes Environment Committee March 11, 2008 Keith Buttleman.
Approaches to CSO Control Adrienne Nemura, P.E. Limno-Tech, Inc.
District of Columbia Water and Sewer Authority George S. Hawkins, General Manager July 14, 2015 Commission for Environmental Cooperation of North America.
Frederick A. Laskey Welcome to the EBC Breakfast Meeting The CSO Program Update Frederick A. Laskey Executive Director Massachusetts Water Resources Authority.
Public Information Meeting Wastewater Treatment January 26, 2016.
Multi-Jurisdictional-Use Facilities Flow Analysis Study Update Presented to Blue Plains Regional Committee March 24, 2011 District of Columbia Water and.
Water Management Options Analysis Sonoma Valley Model Results Sonoma Valley Technical Work Group October 8, /08/2007.
Blue Plains IMA Suburban Position February 22, 2007.
1 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager June 28, 2012 Blue Plains Regional Committee Briefing for: Cost Allocation.
Kevin Colvett, P.E. Nashville Corrective Action Plan and Engineering Report, Phase III for Metro Water Services and the City of Brentwood, TN Presentation.
24 – Wastewater Conveyance Demand Analysis April, 18, 2013 Professor Doran CEE 410.
Sanitary Sewer Overflow (SSO) Consent Decree Update Commissioner Meeting May 18,
Analyses of Rainfall Hydrology and Water Resources RG744 Institute of Space Technology October 09, 2015.
Update on PI Modeling and Nitrogen Removal at Blue Plains
Sewer System Presentation
THE PLAN The Goal Focus on: Entire system Level of service (LOS)
SPU Modeling & Monitoring
Manchester’s CSO Program: A Look Behind and a Look Ahead
LTCP and TN Cost Allocation
Update to the 1992 Dry Creek Watershed Flood Control Plan
Hazards Planning and Risk Management Flood Frequency Analysis
Flood Frequency Analysis
Hydrology CIVL341.
Love Field Modernization Program
Hydrology CIVL341 Introduction
Hidden Capacity How Proper Maintenance and Cleaning of Sewer Systems Can Have Huge Benefits! Presentation by the Jersey Water Works CSO Committee For the.
Commission Agenda Item # 17
Presentation transcript:

1 Briefing for Blue Plains Regional Committee on Potomac Interceptor Capacity Analyses June 28, 2007 District of Columbia Water and Sewer Authority

2 Agenda  Purpose  Model Integration  PI Design Basis  M&E 2003 Model Results  Review of Fairfax Request

3 Purpose  Add Potomac Interceptor model to model of WASA system  PI Model  2003 by M&E/COG  SWMM Model from Potomac P.S. to PI  WASA Model  Danish Hydraulic Institute Mike Urban Model  Includes combined sewers & major separate sewers to D.C. line  Evaluate Fairfax request to add flow to PI – two scenarios  Add 6.5 mgd (avg)  Add 9.5 mgd (avg)

4 Model Integration - Completed  Obtained model data & calibration from M&E  Completed integration  Converted to Mike Urban  Confirmed calibration Potomac Interceptor DC Sewer System

5 PI Design Basis PI Flow At DC Line, MH-2 (mgd) Year Annual Rainfall (National)Annual Avg.Peak Hour Peak Hour/ Avg Flow Ratio Burns & MacDonald 1961 PI Design BasisN/A Actual Data

6 M&E 2003 Findings  Dry weather flows RWWFM forecast  Wet Weather Flows – per metering, regression analysis  Offloads/System Configuration  Loudoun & Fairfax offloaded to Broad Run at MH-56  WSSC Cabin John Flows >16 mgd diverted to PI  Section of UPI out of service in DC is repaired so UPI flows no longer routed to PI  Results of 5 & 10 yr storm runs  5-yr storm: PI surcharged, but no overflow  10-yr storm: PI not adequate  PI surcharged capacity about 144 mgd at DC line (vs original design basis)

M&E Results: Flooding During 10 Year Storm 7 D.C.

Flooding locations during 10 yr storm M&E Results: Flooding During 10 Year Storm 8

M&E Flows in Model Ann. Avg. Flow (mgd) Peak Flow (mgd)IMA / LCSA Flow (mgd) Jursdiction Meter Name5-yr, 24-hr Storm10-yr, 24-hr StormAnn. AvgPeak WSSC CJ Dulles (to PI) Muddy Branch Watts Branch Rock Run Unmetered WSSC Total LCSA Broad Run Offload LCSA Total Fairfax Sully Road # Sully Road # Rock Hill Road Sugarland Run Great Falls Scotts Run Pimmit AT&T B Fairfax Subtotal (Fairfax Offload)(4.89)(14.22) Fairfax Total Other Dulles Airport DC Line

10 Comments on Prior Work  Several jurisdictions predicted to have peak flows >> IMA peak allowance  Not all flow was getting to PI because total peak flow >> PI capacity  water levels exceeding ground level at inflow nodes for peak flow  this excess volume is NOT entering the modeled PI system and is lost.  These occurrences just show that problems could be expected in the according subsheds

11 Evaluations Requested by Fairfax IMA Allocation (mgd)Average Flow (mgd) Connection Point Meter NameAvg.Peak Scenario 1 – No Diversion to Noman Cole Scenario 2 –3 mgd Diversion from Difficult Run to Noman Cole Horsepen A1Sully Road # Horsepen A2Sully Road # Horsepen A3Rock Hill Road Sugerland Run Difficult RunGreat Falls Scotts Run Pimmit Total31N/A Amount above IMA Allocation Amount above IMA Allocation after 1mgd flow swap with LCSA under negotiation8.55.5

12 Summary of Model Runs Dry Weather FlowsWet Weather Peaks PI Capacity Assessment RunFairfaxAll OthersFairfaxAll Others System Changes5-yr10-yr15-yr 1COG 6.3 Up to IMA limit NoneOK 2COG 6.3 Per regression NoneOKNo mgdCOG 6.3Per regression NoneNo mgdCOG 6.3Per regression NoneOKNo mgdCOG 6.3Ann. Avg x 2.3Up to IMA limitNoneOK No mgdCOG 6.3Ann. Avg x 2.3Up to IMA limitNoneOK No mgdCOG 6.3Per regression Relieve PIOK Impact of peaks > IMA Add Fairfax flow but limit peaks to IMA Addit. CSO impacts Add Fairfax flow Note: No Fairfax offload to Broad Run – all flow in PI

13 Findings  Agree with prior work (M&E/COG)  PI capacity (2025):  No Fairfax changes:  Peaks not limited = 5 yr storm  Peaks limited to IMA values = 15 yr storm +  Fairfax adds flow  Peaks not limited = 5 yr +6.5 mgd, <5 yr +9.5 mgd  Peaks limited to IMA values = 10 yr storm

14 Options  Additional metering – improve predictions  Develop PI peak flow management strategy  Add capacity  Relief sewer or relining  Probably increase impact on D.C. CSO