Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.

Slides:



Advertisements
Similar presentations
PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation.
Advertisements

11-13/10/2007 ILC BDS Kick-Off Meeting, SLAC, US 1 BDS Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
David H. Dowell Injector RF Design November 3, LCLS Injector RF Gun: Design, Fabrication & Tuning Plans D. H. Dowell,
Low Energy RHIC e - Cooling LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity 704 MHz SRF gun converted to booster cavity 5-cell 704 MHz.
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
David H. Dowell Injector April 29-30, 2004 LCLS Injector Overview D. H. Dowell, SLAC FAC Review April 29-30, 2004 Injector.
Minutes from Sector 1 Relocation Meeting, May 22 nd 9:15 LCR D. Gassner K Mernick suggest moving the BBQ kicker and triple purpose pick-up assemblies to.
Scientific Goals: V. Litvinenko’s RHIC retreat talk Commissioning Goals: I. Pinayev presentation last week Run 14 Goals: Complete assembly of 112 MHz SCRF.
Low Energy RHIC e - Cooling Meeting Notes 1 –LF Solenoids & HF (Matching) Solenoids: Out for bid??? –20 o Dipole  Magnet gap is 4 inches/transport lines.
1 BROOKHAVEN SCIENCE ASSOCIATES Vacuum Systems H.C. Hseuh, Vacuum Group Leader 8 th ASAC Meeting for NSLS-II Project May 10-11, 2011.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
Discussion on the magnetic shielding: The magnetic shielding will not be installed until the 2016 shutdown. The magnetic shielding test fixture will be.
Sector 1 Instrument Relocation for LEReC Systems in the LEReC Region (39m - 64m) to be Relocated 7 separate assembliesNew LocationChampionsApproved ARTUS.
SR Vacuum Systems and Front Ends
1 Low-energy RHIC electron Cooler (LEReC) cost estimate December 2, 2014.
1 LEReC Funded! From: Fedotov, Alexei Sent: Thursday, May 14, :04 PM Subject: LEReC project approved Dear All, FYI. The LEReC project is now formally.
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
Low Energy RHIC e - Cooling Meeting Minutes – 1/14/15 1 –Magnet Design  During DOE Review there was concern for magnet field quality of LF Solenoids.
Low Energy RHIC e - Cooling LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity 704 MHz SRF gun converted to booster cavity 5-cell 704 MHz.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Al Pendzick LEReC Civil Construction.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
1 Booster Corrector BPM Status AD/ Instrumentation Jim Fitzgerald.
F Booster Long Straight Corrector Upgrade Technical Status and Schedule for Installation Craig Drennan DOE Tevatron Operations Review March 27, 2007.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Sergey Belomestnykh SRF and RF systems.
ILC Beam Delivery System / MDI Issues for LCC-phase (~
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Beam Line Layout – Cooling Section There seems to be two options for energy measurement: at the 180 dipole and/or in a diagnostic branch at the end of.
1 Tim Michalski October 6, 2015 Engineering Issues in MEIC.
Low Energy RHIC e - Cooling Meeting Minutes – 11/19/14 1. Cooling Section Magnets and Power Supplies –Most of power supplies will be from ERL (R. Lambiase).
1. Beam Line Layout – Cooling Section (CS) Mu Metal shield design – G. Mahler is assembling a mock-up of beam line for field measurements to evaluate.
Abstract Storage Ring Vacuum and Interface to Magnets Hsiao-chaun Hseuh, NSLS-II Project This presentation provided a quick overview of the storage ring.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
2.1 GHz Warm RF Cavity for LEReC Binping Xiao Collider-Accelerator Department, BNL June 15, 2015 LEReC Warm Cavity Review Meeting  June 15, 2015.
Status of RF stations for NICA project MAC meeting october 2015.
Low Energy RHIC e - Cooling Meeting Minutes – 11/5/14 1.J. Tuozzolo will schedule a visit to NSLS next week to evaluate available magnets, power supplies,
ECOOL Meeting 03/26/10 1 Low-E cooler baseline decisions: 1.FNAL’s cooling section “as is” – with weak solenoids, correctors, etc. (to prevent over focusing.
Experience Fabricating the Storage Ring Vacuum Chambers for NSLSII
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
Low Energy RHIC e - Cooling Meeting Minutes – 11/5/14 1.Funding is available to purchase magnets. 2.Comment during presentation of attached slides: 180.
Low Energy RHIC e - Cooling LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity 704 MHz SRF gun converted to booster cavity 5-cell 704 MHz.
Beam Test status and Plans of the ILC Main LINAC BPM
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
SBS Magnet and Support Status Robin Wines June 2013.
Low Energy RHIC e - Cooling LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity 704 MHz SRF gun converted to booster cavity 5-cell 704 MHz.
A Fedotov, K Hamdi, D Kayran, L Snydstrup, K Smith, J Tuozzolo, A Zaltsman Transport Beam Line Design development of beam line will be from the Booster.
Low Energy RHIC e - Cooling Meeting Minutes – 12/23/ Cooling Section: –LF Solenoids:  At PPM, G. Woods has assigned buyer, SOW will be revised,
July LEReC Review July 2014 Low Energy RHIC electron Cooling Jorg Kewisch, Dmitri Kayran Electron Beam Transport and System specifications.
LEReC. COOLING in Blue RHIC ring COOLING in Yellow RHIC ring 63.9 m to IP2 Beam Dump 20° Bending Magnets DC e - Gun 704 SRF Booster Cavity 2.1 GHz Cu.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
Vacuum, H-C. Hseuh January 4, 2007 RHIC II Project Internal Cost Review H.-C. Hseuh Vacuum Systems January 4, 2007 Project Overview.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity Booster Cavity and Gun move (next slide)
Beam Line Layout – Cooling Section (to be installed by 1 Dec ember 2015) J. Kewisch wants to move the 20 dipole, yellow (to the right) toward the triplet.
LEReC. COOLING in Blue RHIC ring COOLING in Yellow RHIC ring 63.9 m to IP2 Beam Dump 20° Bending Magnets DC e - Gun 704 SRF Booster Cavity 2.1 GHz Cu.
LEReC Electron beam requirement for cooling Kinetic energy, MeV 1.6
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
Low Energy RHIC e - Cooling Meeting Minutes – 12/17/ For the matching energy of electron and ion beams methods for electron energy measurement were.
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
Minutes meeting Mapes, Miller, Kayran, Fedotov, Gassner, Hamdi, Bruno, Mahler, Weiss, Hammons, Arno, Nayak, Fite, Bellavia The layout shown in.
LEReC System 1. LEReC Injection section 2016 CeC Beam Dump 45°dipole (CeC) Profile Monitor (ERL HE) No SRF Cavity DC e - Gun ERL Solenoid ERL Halo Monitors.
Large Booster and Collider Ring
Challenges for FCC-ee MDI mechanical design
Electron Source Configuration
Advanced Research Electron Accelerator Laboratory
MEIC Shifting Magnet Tim Michalski August 6, 2015.
IR Beam Transport Status
Presentation transcript:

Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity

Low Energy RHIC e - Cooling 20 & 180 deg Dipole  20 dipole design is ready for procurement – steel and field accuracy discussion  180 dipole will not be used as a Spectrometer Magnet for energy spread measurement: –180 and 20 Dipole multipoles must be =/<10e-3 –Anamesh Jain will evaluate the field quality at low field on one of the CEC 45 dipoles. –Review of sliding design of 180 in process: K. Hamdi produced magnet design where chamber and dipole steel move together +/- 10 cm Z together. Meeting Minutes – 3/12/15 2 Reminder: Al Pendzick needs new penetration required at 2:00. This will include type (RF, instrumentation, power), location (from/to), and area of cable space. The request for this contract must be by March-April in order to have penetrations installed during this shutdown (takes 6 mo. to get jobs done - October).

Low Energy RHIC e - Cooling 3 Meeting Minutes – 3/11/15 LF Solenoids In Contract HF Solenoids In Contract Instrumentation MPF for BPM status. Beam Line Vacuum The standard bellows design for cooling section has some problems bolting up to BPM – bolt can go in only one way. He prefers to not use studs.

Low Energy RHIC e - Cooling 5 cell cavity location 4 Location of egun and 5-cell, the beam line length and distance from IR center and tolerance, is being updated by R. Meier. 5 cell there or there. Need to change return line

Low Energy RHIC e - Cooling Compensating and Matching Solenoids Contract Awarded 9/15/2015 delivery for both Next Steps: Design support stand assembly Magnetic shielding analysis, design prototype mu metal shields and supports. Magnet measurement fixture plan for prototype and design test fixtures. 5

Low Energy RHIC e - Cooling 20 o Dipole Magnet 6 Drawings checked – preparing requisition (3/31/2015). End field clamps: stray magnetic field? sextupole Distance Between Pole Faces = 10.4 cm (4.1 in.) Magnet Vertical Gap = 10 cm Vacuum Chamber V Aperture = 9.5 cm (3.74 in.)

Low Energy RHIC e - Cooling 180 o Dipole Magnet Magnetic field quality and repeatability for energy spread measurement. Test using CeC dipole (A. Jain) Range of motion for magnet core +/- 10cm. Magnet Vertical Gap = 10.0 cm (3.94 in.) Vacuum Chamber Aperture = 9.5 cm (3.75 in.) 7

Low Energy RHIC e - Cooling 8 Crossing tube aperture (3.94 in. vertical) Circular tube?? Vacuum Chamber ID = 9.5 cm (3.75 in.) Large open 180 o vacuum chamber and 20 o chamber - beam impedance concerns shield the electron beam path. Binping Xiao is checking 180 o vacuum chamber resonance.

Low Energy RHIC e - Cooling Vacuum Hardware Large open 180 o vacuum chamber and 20 o chamber - beam impedance concerns shield the electron beam path. Binping Xiao is checking 180 o vacuum chamber resonance. Chris Montag is checking aperture – can smaller circular chambers be used for RHIC beam? 9

Low Energy RHIC e - Cooling Design Room o dipole magnet and vacuum chamber integration + large sliding bellows – beam line tuning magnet and vacuum chamber translation (KH) Design 180o dipole chamber present for impedance review (KH) Beam Instrumentation Profile Monitor Vacuum Chambers & ferrite insert (GW) Beam Line 5” bellows with shields (GW) Phase 2 5 cell cavity positioning (RM) Phase 1 and 2 cryogenic system layout (RM) 20 o dipole fabrication drawings, vacuum chamber (KH) 20 o and180 o stand drawings (KH) Beam line solenoid stand (GW) LF Solenoid, BPM, and long pipe are to be independently positioned and surveyed on common stand. Beam line Beam Position Monitor drawings? (GW or VdM) Magnetic Shielding drawing and solenoid magnetic measurement test station (GW) Cable tray and penetration drawings

Low Energy RHIC e - Cooling NSLS I Equipment Compensating dipole for 20 o e beam injection/extraction 375 Gcm/A In hand!! 11

Low Energy RHIC e - Cooling BPMs in Cooling Section(14 Locations) 12 -Large Dia. BPM Housings -28mm buttons -N-Type feedthrough -MPF Q BPM board being ordered for CeC 2 boards for testing in LEReC cooling section

Low Energy RHIC e - Cooling Profile Monitors – New designs for Cooling Section 13 We will need to install a ferrite ring inside the vacuum chamber in the LEReC profile monitors, as shown below in pink. CMD5005 material. The cylinder Peter modeled is 1.65” OD, 1.45” ID and 1” high. This is a sticking point for procurement as it affects the aperture through which the vendor has to insert the YAG holder.

Low Energy RHIC e - Cooling Profile Monitors – New designs for Cooling Section 14 We will need to install a ferrite ring inside the vacuum chamber in the LEReC profile monitors, as shown below in pink. CMD5005 material. The cylinder Peter modeled is 1.65” OD, 1.45” ID and 1” high. This is a sticking point for procurement as it affects the aperture through which the vendor has to insert the YAG holder.