An Inductive Pick-Up (IPU) for Beam Position and Current Measurement

Slides:



Advertisements
Similar presentations
How they work How they are made
Advertisements

M.Gasior, CERN-AB-BIBase-Band Tune (BBQ) Measurement System 1 Base-Band Tune (BBQ) Measurement System Marek Gasior Beam Instrumentation Group, CERN.
CHAPTER 3 MICROWAVE ‘O’ TYPE TUBES
CHAPTER 3 Measurement Systems with Electrical Signals
Measurements on phase stability at CTF3 Giulio Morpurgo / CERN IWLC 2010.
BPS Location in CTF3/CLEX Area Mechanics with PCB Electronics Test Results BPS Linearity Error A linear fit of the wire test measures was done (left) for.
Ref:080114HKNOperational Amplifier1 Lecture 1 Op-Amp Introduction of Operation Amplifier (Op- Amp) Analysis of ideal Op-Amp applications Comparison of.
UPC participation in the development of BPMs for the TBL of the CTF3 Yuri Kubyshin WORKSHOP ON THE FUTURE LINEAR COLLIDER Gandía, December 3, 2005.
Beam Loss Analysis Tool for the CTF3 PETS Tank M. Velasco, T. Lefevre, R. Scheidegger, M. Wood, J. Hebden, G. Simpson Northwestern University, Evanston,
Problem Solving Part 2 Resonance.
Potential improvements of the PS 10 MHz cavities driving amplifier G. Favia Acknowledgments: V. Desquiens, F. Di Lorenzo S. Energico, M. Morvillo, C.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
Experimental Study of the Inductance of a Toroidal Ferrite Core at High frequencies Michelle Walker North Carolina A&T State University Supervisor: Dave.
Analogue Electronics II EMT 212/4
Front-end amplifiers for the beam phase loops in the CERN PS Alessandro Meoli (CERN BE/RF/FB) Supervised by Heiko Damerau 21 April CERN.
Microwave Amplifier Design Blog by Ben (Uram) Han and Nemuel Magno Group 14 ENEL 434 – Electronics 2 Assignment
CLIC DR EXTRACTION KICKER DESIGN, MANUFACTURING AND EXPERIMENTAL PROGRAM C. Belver-Aguilar (IFIC) On behalf of: A. Faus-Golfe (IFIC), F. Toral (CIEMAT),
Microwave Amplifier Design Blog by Ben (Uram) Han and Nemuel Magno Group 14 ENEL 434 – Electronics 2 Assignment
BEPCII Transverse Feedback System Yue Junhui IHEP , Beijing Sep 17 th, 08IMAC.
Impedance and Collective Effects in BAPS Na Wang Institute of High Energy Physics USR workshop, Huairou, China, Oct. 30, 2012.
Lecture 1 Op-Amp Introduction of Operation Amplifier (Op- Amp) Analysis of ideal Op-Amp applications Comparison of ideal and non-ideal Op-Amp Non-ideal.
Biomedical Instrumentation I
CTF3 BPMs October 18-22/2010 IWLC2010 CTF3 BPMs Lars Soby 1.
1 C. Simon CLIC Instrumentation workshop BPM C. Simon on behalf of the Saclay’s group CLIC Instrumentation workshop 2 nd - 3 rd June.
Travelling Wave Tube For Broadband amplifier helix TWTs (proposed by Pierce and others in 1946 ) are widely used For High average power purposes the.
The beam-based alignment and feedback systems, essential operations of the future colliders, use high resolution Beam Position Monitors (BPM). In the framework.
CLIC meeting 09/ Lars Søby, CERN AB/BDI1 PBPM: Precision Beam Position Monitor. WBCM: Wide Band Current Monitor. EUROTeV Diagnostics WP5
Renovation of the 200 MHz RF system LLRF issues. Cavities redistribution 26 October th LIU-SPS Coordination Meeting 2  2011 : 4 cavities 2 x 4.
CLIC09 Workshop October 2009Drive beam BPM’sLars Søby 1 Drive Beam BPM’s CLIC 09 work shop, CERN, of October 2009, Lars Søby.
BEPCII Transverse Feedback System Yue Junhui Beam Instrumentation Group IHEP , Beijing.
1 EuroTeV High Bandwidth Wall Current Monitor Alessandro D’Elia CERN- Geneve.
Electrical Principles 1 1 G5 - ELECTRICAL PRINCIPLES [3 exam questions - 3 groups] G5A - Reactance; inductance; capacitance; impedance; impedance matching.
Andreas Jansson, "Quadrupole Pick-ups", LHC BI-Review, November 19-20, Quadrupole Pick-ups  What is a quadrupole pick-up?  PS pick-ups and experimental.
1 EuroTeV High Bandwidth Wall Current Monitor Alessandro D’Elia AB-BI-PI.
CLIC workshop 2015 EXTRACTION KICKER STRIPLINE MEASUREMENTS C. Belver-Aguilar (IFIC) On behalf of: A. Faus-Golfe (IFIC), F. Toral (CIEMAT), M.J. Barnes.
DaMon: a resonator to observe bunch charge/length and dark current. > Principle of detecting weakly charged bunches > Setup of resonator and electronics.
FBCT experience at Desy Presenter: Matthias Werner, DESY At CERN Workshop: „Improving the accuracy of the BCT measurements in the LHC“ January 2011.
A. Faus-Golfe, J.V. Civera, C. Blanch and J.J. García-Garrigós whit the help of the CTF3 Collaboration 1 CTF3 meeting Jan-09.
- CTF3 Collaboration Technical Meeting, January TBL BPM Electronics: Amplifier Status and Future Work Gabriel Montoro (1), Antoni Gelonch,
F f Quadrupole Pick-Ups at CERN & Fermilab A.Jansson FNAL.
LER workshop 2014 Update on the Extraction Kicker for CLIC DRs: Calibration Tests C. Belver-Aguilar (IFIC) On behalf of: A. Faus-Golfe (IFIC), F. Toral.
EKT 441 MICROWAVE COMMUNICATIONS
M. Gasior, CERN-AB-BIFP 420 BPM Workshop1 Signal Processing for BPMs Marek GASIOR CERN-AB-BI.
Signal Conditioning Elements (SCE). 6/13/2016Measurement & Transducers2 1. Voltage dividers Example :Potentiometer circuit.
Midterm Review 28-29/05/2015 Progress on wire-based accelerating structure alignment Natalia Galindo Munoz RF-structure development meeting 13/04/2016.
CLIC Beam instrumentation work shop, CERN, 2 nd & 3 rd of June 2009, Lars Søby BPM overview CLIC instrumentation work shop 2-3 June BPM overview.
1CEA/ Saclay/ SACM CARE/SRF/WP11 Development of a new Beam Position Monitor for FLASH, XFEL and ILC Cryomodules Claire Simon, Michel Luong, Stéphane Chel,
CLIC Workshop 18 th -22 nd January 2016, CERN 1 Alfonso Benot Morell Manfred Wendt.
전자파 연구실 1. Fundamentals. 전자파 연구실 1.1 Frequency and time Passive circuit elements is emphasized in high speed digital design : Wires, PCB, IC- package.
Preamplifier R&D at University of Montreal for the drift chamber J.P. Martin, Paul Taras.
Bunch Shape Monitor for HINS Wai-Ming Tam Project X Collaboration Meeting September 11, 2009.
Operational Amplifier
BPM design Introduction BPM types Bench measurements
BIOELECTRONICS 1 Lec 9: Op Amp Applications By
EUROTeV Diagnostics WP5
Re-entrant BPM R&D for ILC Main Linac
CAVITY BPM FOR CALIFES Claire Simon, Michel Luong, D. Bogard, P
Analogue Electronics Circuit II EKT 214/4
Analogue Electronic 2 EMT 212
Medical electronics II
Status of the CERN chopper.
Wideband, solid-state driven RF systems for PSB and PS longitudinal damper.
10 MHz amplifier status G. Favia
F.Marcellini, D.Alesini, A.Ghigo
STUDIES OF THE STRIPLINE KICKER FOR BEAM EXTRACTION FROM THE CLIC DRs
    BEAM POSITION MONITORS USING A RE-ENTRANT CAVITY C. Simon1, S. Chel1, M. Luong1, P. Contrepois1, P. Girardot1, N. Baboi2 and N. Rouvière3.
CLIC DR EXTRACTION KICKER DESIGN, MANUFACTURE AND EXPERIMENTAL PROGRAM
Lecture 14. Diagnostic equipment of the accelerators
Medical electronics II
Impedance of the 2x50 to 100 ohm transformers.
Presentation transcript:

An Inductive Pick-Up (IPU) for Beam Position and Current Measurement Marek GASIOR, CERN, AB/BDI email: marek.gasior@cern.ch 6th European Workshop on Beam Diagnostics and Instrumentation for Particle Accelerators 5 – 7 May 2003, Mainz, Germany Contributed Talk #01

An Inductive Pick-Up (IPU) for Beam Position and Current Measurement Marek GASIOR, CERN, AB/BDI email: marek.gasior@cern.ch Third CLIC Test Facility Evolution from a WCM to an IPU IPU Design and Model Active Hybrid Circuit Results An Inductive Pick-up for Beam Position and Current Measurement

Third CLIC Test Facility (CTF3) Delay Loop, f’ = f  2, I’B = IB  2 1.5 s bunch train  5 pieces of 140 ns Drive Beam Linac (f =1.5 GHz, IB = 3.5 A) A 1.5 s bunch train, some 2300 pulses Drive Beam Decelerator Main Beam Accelerator Combiner Ring, f” = f’  5, I”B = I’B  5 5 pieces of 140 ns  1 train of 140 ns Requirements for a DBL Beam Position Monitor: Low cut-off frequency at least 10 kHz to limit a droop of the 1.5 s pulse to about 10 % High cut-off frequency at least 100 MHz to observe fast beam movements (rise time some 3 ns) The bandwidth 10 kHz – 100 MHz means 4 decades The pick-up structure must be as transparent as possible for the beam and corresponding longitudinal coupling impedance should be low in the GHz range An Inductive Pick-up for Beam Position and Current Measurement

Wall Current Monitor (WCM) principle The BEAM current is accompanied by its IMAGE A voltage proportional to the beam current develops on the RESISTORS in the beam pipe gap The gap must be closed by a box to avoid floating sections of the beam pipe The box is filled with the FERRITE to force the image current to go over the resistors The ferrite works up to a given frequency and lower frequency components flow over the box wall An Inductive Pick-up for Beam Position and Current Measurement

WCM as a Beam Position Monitor For a centered BEAM the IMAGE current is evenly distributed on the circumference The image current distribution on the circumference changes with the beam position Intensity signal () = resistor voltages summed Position dependent signal () = voltages from opposite resistors subtracted The  signal is also proportional to the intensity, so the position is calculated according to / Low cut-offs depend on the gap resistance and box wall (for ) and the pipe wall (for ) inductances An Inductive Pick-up for Beam Position and Current Measurement

A Beam Position Sensitive WCM A position sensitive WCM is still used in the CERN PS It contains 96 resistors of 10  in 32 groups of 3 in series), V/IB  1  Position measurement bandwidth is 9 MHz – 1.5 GHz (2.2 decade) Current measurement bandwidth is 3 MHz – 1.5 GHz (2.7 decade) G.C. Schneider, A 1.5 GHz Wide-Band Beam Position and Intensity Monitor for the Electron-Positron Accumulator (EPA), CERN/PS 87-9 (BT), 1987 An Inductive Pick-up for Beam Position and Current Measurement

A new design: Inductive Pick-Up (IPU) MORE INDUCTANCE LESS RESISTANCE An eight electrode “tight” design to avoid resonances in the GHz range The electrodes cover 75 % of the circumference The electrode internal diameter is only 9 mm larger then the vacuum chamber of 40 mm and it is occupied by the ceramic insertion (alumina) The transformers are as small as possible to gain high frequency cut-off with many turns The transformers are mounted on a PCB The connection between the electrodes and the cover is made by screws Electrode diameter step is occupied by the ceramic tube The tube is titanium coated on the inside An Inductive Pick-up for Beam Position and Current Measurement

Inductive Pick-Up – A Low Frequency Model Electrodes are combined in pairs so that each transformer sees half of the load Frequency low cut-offs are limited by connection parasitic resistances Each transformer has one calibration turn (not shown) n = 30, RS  7  giving RT  0.1  and RP  4 m fL  150 Hz (RP with L  5 H) fL  10 kHz (RP with L  70 nH) The electrode signal high cut-off frequency is beyond 300 MHz An Inductive Pick-up for Beam Position and Current Measurement

Inductive Pick-Up New Design The ceramic tube is coated with low resistance titanium layer, resistance: end-to-end 10 , i.e.  15 / Primary circuit has to have small parasitic resistances (Cu pieces, CuBe screws, gold plating) Tight design, potential cavities damped with the ferrite The transformers are mounted on a PCB and connected by pieces of microstrip lines (minimizing series inductances) An Inductive Pick-up for Beam Position and Current Measurement

Active Hybrid Circuit (AHC) More than four decades of bandwidth required High Common Mode Rejection Ratio needed, at least -40 dB at 100 MHz Active circuit with a differential amplifier AD8129 – “active feedback” architecture, i.e. one feedback network needed Datasheet CMRR is -42 dB at 100 MHz Bandwidth 200 MHz with a gain of 10 An Inductive Pick-up for Beam Position and Current Measurement

Active Hybrid Circuit – Performance The CMRR at 100 MHz is as high as 55 dB (datasheet 42 dB) The CMRR for frequencies below 10 MHz is limited by the measurement setup  signal high cut-off frequency about 200 MHz An Inductive Pick-up for Beam Position and Current Measurement

IPU and AHC – Frequency Characteristics A wire method with a 50  coaxial setup which the IPU is a part  signal – flat to 0.5 dB within 5 decades, almost 6 decades of 3 dB bandwidth (no compensation)  signal – 5 decades (four decades + one with an extra gain for low frequencies) BW: 300 Hz – 250 MHz ( 6 decades) BW: 1 kHz – 150 MHz (> 5 decades) An Inductive Pick-up for Beam Position and Current Measurement

IPU and AHC – Displacement Characteristics A thin wire forming a coaxial line was displaced diagonally across the pick-up aperture. The measurement was done with a network analyzer: signal was applied to the wire and hybrid signals were observed. An Inductive Pick-up for Beam Position and Current Measurement

IPU – Longitudinal Coupling Impedance reference The pick-up was inserted into a 50  coaxial line (again the wire method) The signal drop along the pick-up was evaluated by measuring the S21 scattering transmission coefficient As a reference was measured the same setup with the pick-up replaced by an equivalent length of a tube (to be independent of the setup) An Inductive Pick-up for Beam Position and Current Measurement

IPU – Time Domain Reflectometry Measurements The wire method with the 50  coaxial setup A fast step was applied to the coaxial line and the reflection was observed The electrode diameter step is visible only for components of lower frequency. Higher frequency components do not see the step since they flow over the titanium low resistance coating An Inductive Pick-up for Beam Position and Current Measurement

IPU and AHC – Beam tests in the CTF2  - CH2 H - CH3 V - CH4 Electron beam of one 1 nC , 5 psRMS bunch The signals have the rise time of about 2 ns (one division) An Inductive Pick-up for Beam Position and Current Measurement

An Inductive Pick-up for Beam Position and Current Measurement Conclusions An inductive pick-up and a dedicated active hybrid circuit were designed for the drive beam linac of the CTF3 They allow to measure beam position with a bandwidth of 5 decades and absolute beam current over 6 decades The chain IPU-AHC can be tested and calibrated in place with precise current pulses, applied to calibration turns of the IPU transformers Neither the pick-up nor the AHC contain adjustable elements The pick-up longitudinal coupling impedance is limited to about 10  in the GHz range Very many thanks to J. Belleman, J. Durand, J.L. Gonzalez, L. Søby, J.P. Potier, Y. Cuvet and J.L. Chouvet http://www.cern.ch/gasior/pap/dipac2003.ppt An Inductive Pick-up for Beam Position and Current Measurement

Thank you for your attention http://www.cern.ch/gasior/pap/dipac2003.ppt An Inductive Pick-up for Beam Position and Current Measurement

Emergency slide – the parameter table An Inductive Pick-up for Beam Position and Current Measurement