RunControl status update Nicolas Lurkin School of Physics and Astronomy, University of Birmingham NA62 TDAQ Meeting – CERN, 14/10/2015.

Slides:



Advertisements
Similar presentations
CWG10 Control, Configuration and Monitoring Status and plans for Control, Configuration and Monitoring 16 December 2014 ALICE O 2 Asian Workshop
Advertisements

Test Case Management and Results Tracking System October 2008 D E L I V E R I N G Q U A L I T Y (Short Version)
CCNA2 MODULE 5.
Replication Monitoring University of Maryland Institute for Advanced Computer Studies.
Chapter 11: Maintaining and Optimizing Windows Vista
Hands-On Microsoft Windows Server 2003 Administration Chapter 6 Managing Printers, Publishing, Auditing, and Desk Resources.
Cambodia-India Entrepreneurship Development Centre - : :.... :-:-
Maintaining and Updating Windows Server 2008
70-291: MCSE Guide to Managing a Microsoft Windows Server 2003 Network Chapter 14: Troubleshooting Windows Server 2003 Networks.
Backup and Recovery Part 1.
Check Disk. Disk Defragmenter Using Disk Defragmenter Effectively Run Disk Defragmenter when the computer will receive the least usage. Educate users.
Academic Year 2014 Spring. MODULE CC3005NI: Advanced Database Systems “DATABASE RECOVERY” (PART – 1) Academic Year 2014 Spring.
1 © 2006 Cisco Systems, Inc. All rights reserved. Session Number Presentation_ID Using the Cisco Technical Support & Documentation Website for Security.
Introduction and simple using of Oracle Logistics Information System Yaxian Yao
70-291: MCSE Guide to Managing a Microsoft Windows Server 2003 Network Chapter 7: Domain Name System.
Chapter 8 Implementing Disaster Recovery and High Availability Hands-On Virtual Computing.
+ discussion in Software WG: Monte Carlo production on the Grid + discussion in TDAQ WG: Dedicated server for online services + experts meeting (Thusday.
Clara Gaspar, October 2011 The LHCb Experiment Control System: On the path to full automation.
1 Alice DAQ Configuration DB
Windows Vista Inside Out Chapter 22 - Monitoring System Activities with Event Viewer Last modified am.
SPSC Questions to the 2014 NA62 Status Report 1 Beam: which is the beam structure expected in October? Which is the intensity you can reasonably expect?
Local Trigger Unit (LTU) status T. Blažek, V. Černý, M. Kovaľ, R. Lietava Comenius University, Bratislava M. Krivda University of Birmingham 30/08/2012.
Offline shifter training tutorial L. Betev February 19, 2009.
Replay Compilation: Improving Debuggability of a Just-in Time Complier Presenter: Jun Tao.
Recent Software Issues L3 Review of SM Software, 28 Oct Recent Software Issues Occasional runs had large numbers of single-event files. INIT message.
1 Control Software (CAT) Introduction USB Interface implementation Calorimeter Electronics Upgrade Meeting Frédéric Machefert Wednesday 5 th May, 2010.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
Alarm Help. Points to discuss (from Clara) Display Only one line per DPE (fatal, error, warning) Background colour should fill whole row Simple version.
Overview, remarks, lamentations, hope and despair M. Sozzi TDAQ WG meeting CERN - 4 June 2013 Introduction, news and appetizer.
Part I – Shifter Duties Part II – ACR environment Part III – Run Control & DAQ Part IV – Beam Part V – DCS Part VI – Data Quality Monitoring Part VII.
Optimizing Windows Vista Performance Lesson 10. Skills Matrix Technology SkillObjective DomainObjective # Introducing ReadyBoostTroubleshoot performance.
Michele de Gruttola 2008 Report: Online to Offline tool for non event data data transferring using database.
1 User guide for Muon shifter part 2 : control of LV, HV, TELL1 Preliminary version 9-July-08 (to be checked by Michela) I have simply put together the.
Status & development of the software for CALICE-DAQ Tao Wu On behalf of UK Collaboration.
TDAQ Experience in the BNL Liquid Argon Calorimeter Test Facility Denis Oliveira Damazio (BNL), George Redlinger (BNL).
TELL1 command line tools Guido Haefeli EPFL, Lausanne Tutorial for TELL1 users : 25.February
The ATLAS DAQ System Online Configurations Database Service Challenge J. Almeida, M. Dobson, A. Kazarov, G. Lehmann-Miotto, J.E. Sloper, I. Soloviev and.
TEL62 AND TDCB UPDATE JACOPO PINZINO ROBERTO PIANDANI CERN ON BEHALF OF PISA GROUP 14/10/2015.
November 1, 2004 ElizabethGallas -- D0 Luminosity Db 1 D0 Luminosity Database: Checklist for Production Elizabeth Gallas Fermilab Computing Division /
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
Software - Utilities Objectives Understand what is meant by utility software and application software Look at common utilities – Security – Disk organisation.
Sequential Processing to Update a File Please use speaker notes for additional information!
TEAM FOUNDATION VERSION CONTROL AN OVERVIEW AND WALKTHROUGH By: Michael Mallar.
Straw VME Data Monitoring M. Koval Straw WG meeting
IBM Express Runtime Quick Start Workshop © 2007 IBM Corporation Deploying a Solution.
1 G4UIRoot Isidro González ALICE ROOT /10/2002.
Event Management. EMU Graham Heyes April Overview Background Requirements Solution Status.
Markus Frank (CERN) & Albert Puig (UB).  An opportunity (Motivation)  Adopted approach  Implementation specifics  Status  Conclusions 2.
TELL1 readout in RICH test: status report Gianluca Lamanna on behalf of TDAQ Pisa Group (B.Angelucci, C.Avanzini, G.Collazuol, S.Galeotti, G.L., G.Magazzu’,
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
The NA62RunControl: Status update Nicolas Lurkin School of Physics and Astronomy, University of Birmingham NA62 TDAQ Meeting – CERN, 10/06/2015.
Status of LAV electronics commissioning Mauro Raggi, Francesco Gonnella Laboratori Nazionali di Frascati 1 Mauro Raggi - Laboratori Nazionali di Frascati4.
The ALICE data quality monitoring Barthélémy von Haller CERN PH/AID For the ALICE Collaboration.
R. Fantechi 2/09/2014. Milestone table (7/2014) Week 23/6: L0TP/Torino test at least 2 primitive sources, writing to LTU, choke/error test Week.
Software and TDAQ Peter Lichard, Vito Palladino NA62 Collaboration Meeting, Sept Ferrara.
LAV electronics status report Mauro Raggi and Francesco Gonnella TDAQ meeting NA62 Collboration Meeting 1-5 September 2014 Ferrara.
Maintaining and Updating Windows Server 2008 Lesson 8.
Exploration 3 Chapter 4. What is VTP? VTP allows a network manager to configure a switch so that it will propagate VLAN configurations to other switches.
Problem Solving With C++ SVN ( Version Control ) April 2016.
“Technical run experience” Gianluca Lamanna (CERN) TDAQ meeting
THIS MORNING (Start an) informal discussion to -Clearly identify all open issues, categorize them and build an action plan -Possibly identify (new) contributing.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
Windows Vista Configuration MCTS : Maintenance and Optimization.
Michal Koval (CERN) Straw WG Meeting
Enrico Gamberini for the GTK WG TDAQ WG Meeting June 01, 2016
CMS Operational Experience
CONFIGURING HARDWARE DEVICE & START UP PROCESS
Modern PC operating systems
Presentation transcript:

RunControl status update Nicolas Lurkin School of Physics and Astronomy, University of Birmingham NA62 TDAQ Meeting – CERN, 14/10/2015

TEL62 PCFarm Monitoring/Alert Other Big Screen Configuration Files Outline Nicolas Lurkin – TDAQ Meeting2

Configuration report is now provided at start of run.  Quick feedback in case of misconfiguration TEL62 Nicolas Lurkin – TDAQ Meeting3

Implemented BoardReload command directly from FSM.  Easier to use, sometimes abused of by shifters as general solution to everything Implemented BoardStatus command. Can be requested regularly to the board to understand if running correctly. -FSM is updated with WARNING state. If BoardStatus gives error, go in warning and propagate to detector level. TEL62 Nicolas Lurkin – TDAQ Meeting4 -Problem: Tested requesting every 3 burst (during inter-burst) but instability seen on tdspy  Crash, board get stuck, error flag is set after first request

Implemented L1 trigger configuration PCFarm is going to provide a list of received sources ID from which missing ones can be inferred.  Understand more easily which board is faulty (Use together with TEL62 BoardStatus) PCFarm Nicolas Lurkin – TDAQ Meeting5

Timing information provided by the farm (L0/L1 building time, L1/L2 processing time). Plots are generated with ROOT and displayed on RunControl. PCFarm Nicolas Lurkin – TDAQ Meeting6

Automatic restart has been improved: more tuneable, log available, done out of burst. Merger disk space monitoring: automatically exclude merger when more than 98% full Detection of hardware issue (memory full, system crash, …).  Automatically tries to power cycle node up to 3 times. PCFarm Nicolas Lurkin – TDAQ Meeting7

In case of failure of a beam line magnet, the electronics can be damaged.  K12 Magnets currents are read by the RunControl and integrated in the alert system. In case of problem the shifter is requested to close the TAX Monitoring/Alert Nicolas Lurkin – TDAQ Meeting8

Monitoring/Alert 9

Finalised integration of STRAW SRBs (commands, XML) Finalised integration of GTK readout (commands, XML) New L0TP parameters added (offset_det, reference detector, slowest detector, …) Global configuration of MEPFactor and Jumbo frames.  Modified in the PCFarm options and automatically applied to all readout configuration. No need for specific recipes anymore. Raspberry pi:  Stability improved (also on the pi side thanks to Matt)  Default threshold values are applied at start of run Information gathered from DIP (Experimental scalers, target intensity) are forwarded on DIM to the PCFarm and integrated in the data stream. Modifying configuration of a device is only allowed in a state before the configuration takes effect (e.g. Start run configuration can be modified until INITIALIZED state) Other Nicolas Lurkin – TDAQ Meeting10

Big Screen Nicolas Lurkin – TDAQ Meeting11 L0TP numbers (Received primitives, trigger masks, downscaling) Experimental scalers Target intensity

We had many problems with XML files: Wrong file loaded Use of outdated XML as basis when modifying XML Most of these problems arises from not enough organisation from people modifying XMLs: All XMLs at the same place, no naming convention (_old, _old_new, …), no history of modifications Configuration files Nicolas Lurkin – TDAQ Meeting12

Several attempts to find workaround: 1.Create single directory TDAQ_CONFIGURATION_OFFICIAL where files should be put before loading in DB. Revisioned directory  At some point, only DB was used. Became out of sync. 2.Create directory DBSync where files are copied every time they are loaded in DB.  Wrong file stored somewhere else used instead. 3.Prevent any long-term storage by cleaning shared directory regularly. When base file is needed, request RunControl to provide it (available for limited time to prevent outdating).  Where we stand so far Please try to be more organised when handling XML files. That might save a lot of troubles and data taking time. Configuration files Nicolas Lurkin – TDAQ Meeting13

Latest detectors included (Straw, GTK). LKr/L0 is the only one missing now. Improvement on TEL62 diagnostic PCFarm L1 configurable Monitoring of critical values and notifications to shifters. General operation by shifter is getting smoother and easier. Some known operations are automatised. XML configuration modification for TEL62 is now the main source of troubles (especially for CHOD) Conclusion Nicolas Lurkin – TDAQ Meeting14