EU-MRG Stakeholder Day Experience in Monitoring & Reporting in the EU-ETS: Stakeholder Consultation May 12, 2005 Sina Wartmann, Ecofys

Slides:



Advertisements
Similar presentations
European Commission: DG Environment Monitoring, Reporting and Verification in the EU ETS: Status and Implementation Stakeholder Day on the EU MRG Cologne.
Advertisements

December 2005 EuP Directive : A Framework for setting eco-design requirements for energy-using products European Commission.
European Commission: DG Environment Closing Remarks: Key issues for follow-up from Stakeholder Day Stakeholder Day on the EU MRG Cologne 12 May 2005 Marco.
Session 5 :E-PRTR (EU-ETS) QUALITY CONTROL/QUALITY ASSESSMENT Iksan van der Putte.
CEN WS/BII2 1 Spreading interoperability in eProcurement processes across Europe Open Seminar Brussels December 6, 2012.
The Industrial Emissions Directive (IED) 2010/75/EU
September 21 COSA: Health Accounts in Belgium 1 State of play at the international level and ambitions of EUROSTAT C. van Mosseveld, PhD EUROSTAT Unit.
Stakeholder day on the EU-Monitoring and Reporting Guidelines – Experiences of the Pulp and Paper Esa Hyvärinen Confederation of European Paper Industries.
UNFCCC Secretariat SDM programme Wrap-up Session: Key Issues Identified and Proposals discussed Practitioners’ workshop on Standardized baselines Bonn,
1 PROPOSAL FOR PROCEDURES AND SCOPE OF SHA DATA COLLECTION UNDER THE CO-OPERATION BETWEEN OECD, EUROSTAT AND WHO 7 th Meeting of Health Accounts Experts.
EU MONITORING AND REPORTING GUIDELINES STAKEHOLDER DAY Cologne, 12th May 2005 UK APPROACH: PAST PRESENT AND FUTURE Dr Rob Gemmill Technical Adviser Monitoring.
Revision of ISSAI 30 INTOSAI Code of Ethics
The Sevilla process for supporting the implementation of the IPPC Directive Michael Parth Tallinn – Estonia 27 – 28 March 2008.
Records Managers’ Forum 28 February Draft standard on the appraisal and disposal of State records Catherine Robinson Senior Project Officer, Government.
IPPC Directive state of play and future developements
Enhancement of participation of local stakeholders, key to success of CDM projects: Current rules and procedures under the CDM Fatima-Zahra Taibi, UNFCCC.
Report on UNSD activities since the last meeting of the Expert Group on International Economic and Social Classifications Meeting of the Expert Group on.
The implementation status of specific mechanisms under Kyoto Protocol EU-ETS 13 May 2013 Geta Diaconu.
Date (Arial 16pt) Title of the event – (Arial 28pt bold) Subtitle for event – (Arial 28pt) Implementation and policy overview Directors of General Insurance,
EU-MRG Stakeholder Day Technical Session VIII: Cross-Cutting Issues Prof. Dr. Günter Schock, TÜV Rheinland Group Cologne, May 12 th 2005.
Second expert group meeting on Draft fiche on delegated act on the European code of conduct on partnership (ECCP) Cohesion Policy
1 EU Emissions Trading Scheme – New System to allocate free Allowances from 2013 onwards IFIEC Energy Forum Brussels, 9 June 2011 Hans Bergman DG Climate.
EU-MRG Stakeholder Day Technical Session III: Cement and Lime May Jochen Harnisch, Ecofys
Emissions Trading Dr. Ken Macken. Emissions Trading Directive The Directive was approved by the European Parliament on 2 July 2003, and by the Council.
Expert group meeting on draft delegated act on the European code of conduct on partnership (ECCP) under cohesion policy
1 DG Enterprise & Industry European Commission Conference on Better Regulation: Practical Steps Forward Reykjavík 6 June 2006 OVERVIEW OF THE BETTER REGULATION.
European Social Dialogue in the Electricity Sector: State of Play Charlotte RENAUD Policy Officer - EURELECTRIC « Electricity Network in Europe » - 1st.
European Commission, DG Education and Culture,
Kai-Uwe B. Schmidt Maria Netto Cooperative Mechanisms UNFCCC secretariat Clean Development Mechanism (CDM) under the Kyoto Protocol.
EU-MRG Stakeholder Day Technical Session VII: Glass Prof. Dr. Günter Schock, TÜV Rheinland Group Cologne, May 12 th 2005.
DG ENV Environmental assessment procedures for energy infrastructure projects of common interest (PCIs)
SEVESO II transposition and implementation: Possible approaches and lessons learned from member states and new member states SEVESO II transposition and.
EU ETS Phase III – Monitoring, Reporting & Verification Andy Taylor Global Product Manager EU ETS.
1 Review of the IPPC Directive and related legislation Second Meeting Of Working Group E On Priority Substances 17 October 2007 Filip FRANCOIS – DG ENV.
Creating the environment for business Assessment of the Implementation by the Member States of the IPPC Directive Advisory Group Meeting Friday 13 th January.
Contract: EIE/07/069/SI Duration: October 2007 – March 2010Version: July 7, 2009 Calculation of the integrated energy performance of buildings.
Czech National Information Centre (Help-Desk) REACH Jan Kolář April 2009.
BAT - BREF Their scope Rob Kramers Senior advisor InfoMil.
EU’s CO2 Emissions Trading Scheme – Benchmarks for Free Allocation from 2013 Onwards 9 September 2010 Hans Bergman DG Climate Action European Commission.
Revision of the Basic Regulation
DG Environment, Unit D.2 Marine Environment and Water Industry
2005 MRG stakeholder day Concerns and proposals of the downstream oil industry J-F. Larivé, CONCAWE.
Technical Session VIII: Cross-Cutting Issues
EU-MRG Stakeholder Day
European Commission DG Environment
EU-MRG Stakeholder Day
Marine Strategy Framework Directive (MSFD)
Daughter Groundwater Directive
Агенција за трговину емисионим јединицама СР Немачке
INSPIRE fitness for purpose – Analysis
Technical review of Commission Decision 2010/477/EU concerning MSFD criteria for assessing GES Work flow and progress 20/21 October th WG GES.
The Commission Communication on implementation (COM (2012) 95) in relation to Water Industry Directives (Urban Waste Water Treatment, Drinking Water,
D 4 Food webs Process: two open workshops WGGES consultation
Jozsef Szlezak & Pawel Kazmierczyk (EEA)
Marine Strategy Framework Directive (MSFD)
E-PRTR Refit evaluation and Article 17 official data review
IMPROVING PUBLIC INFORMATION
European Commission, DG Environment Air & Industrial Emissions Unit
Setting the scene: GHG inventories
Revision of Decision 2010/477/EU Overview of main changes
DG Environment, Unit D.2 Marine Environment and Water Industry
András Zsigmond (DG GROWTH, Unit E5)
Finalisation of study report
Scene setter European Commission DG Environment
Conclusions from the Review of REACH
Revision of Decision 2010/477/EU
DG Environment, Unit D.2 Marine Environment and Water Industry
Review of Annexes I and II of the Groundwater Directive 2006/118/EC
EU Water Framework Directive
Finalisation of study report
Presentation transcript:

EU-MRG Stakeholder Day Experience in Monitoring & Reporting in the EU-ETS: Stakeholder Consultation May 12, 2005 Sina Wartmann, Ecofys s.

EU-MRG Stakeholder Day Overview Background Concept of stakeholder consultation The questionnaire Stakeholder groups addressed Results Outlook

EU-MRG Stakeholder Day Background Review clause in the EU-MRG: „The Commission will review this Annex and Annexes II—XI by 31 December 2006, taking into account experience with the application“ (Annex I, 1) Potential changes anticipated to be in place well ahead 1 January 2008

EU-MRG Stakeholder Day Stakeholder Consultation I Goal: Collect experience gained in the application of the MRG from operators and authorities Specific Objectives: Collect structured and comparable feedback for key issues Provide space for technical comments on all annexes Provide space to express positions and comments

EU-MRG Stakeholder Day Stakeholder Consultation II Consultation includes:  Questionnaire with ratings + possibility for additional written comments  Invitation to submit position papers  „Stakeholder Day“ with presentations by stakeholder groups and sectoral sessions  Publication of results

EU-MRG Stakeholder Day The Questionnaire I Evaluate the guidelines as a whole according to the following aspects: Accuracy Flexibility Cost-effectiveness User-friendlyness Providing a level playing field

EU-MRG Stakeholder Day The Questionnaire II Evaluate the following aspects for each of the specific technical annexes: Clarity Applicability Tier thresholds Installation coverage

EU-MRG Stakeholder Day The Questionnaire III Further aspects to be judged and rated: Consistency with other reporting systems or standards Definitions Usefulness of monitoring and reporting principles Guidance on the application of tier system Guidance on uncertainty assessment Reporting templates....

EU-MRG Stakeholder Day Target Group Operators participating in the EU-ETS addressed through their EU industry associations National Ministries of the Environment Regional competent authorities Non-governmental organisations: e.g. CEN & IETA Non-governmental organisations: e.g. CAN Europe & WWF

EU-MRG Stakeholder Day Consultation Process Questionnaires and invitation to submit further comments and position papers sent out in early March Distributed via to a standard list of EU- stakeholders and Member State focal points Posted on DG ENV emission trading website Deadline for submission of questionnaires and position papers: April 15th

EU-MRG Stakeholder Day Results Feedback received from: Industry associations at EU and national level Operators Ministries and other competent authorities Other non-governmental organisations in the form of questionnaires as well as position papers and other written comments.

EU-MRG Stakeholder Day Questionnaires Received SectorsNo. of questionnaires Combustion25 Iron & Steel7 Refineries11 Cement & Lime31 Ceramics9 Pulp & Paper4 Glass10 General (EPAs, Consultants...)12 Total109

EU-MRG Stakeholder Day Position Papers & Other Comments SectorsNo. of position papers/other written comments Combustion6 Iron & Steel1 Refineries1 Cement & Lime3 Ceramics2 Pulp & Paper0 Glass0 General (EPAs, Consultants...)9 Total22

EU-MRG Stakeholder Day Results I Accuracy: Good-very good, but leading to excessive costs Flexibility: Satisfactory – poor, more flexiblity needed regarding tier thresholds and calculation methods Cost-effectiveness: poor – very poor, good as a principle but not well implemented in the MRG

EU-MRG Stakeholder Day Results II User-friendlieness: poor –Many sections need clarification –Many references from one section into another –Shift information from Annex I into sectoral annexes Providing a level playing field: no opinion –Depends on interpretation by member states –At present differing interpretations in many fields! –Harmonization needed

EU-MRG Stakeholder Day Results III Hot-Spots: Principles: Cost-efficiency, flexibility Cross-cutting issues: harmonisation, EN ISO 17025, emission factors, uncertainty assessment At sectoral level: tier thresholds, calculation methods for process emissions General message: Simplify and make less prescriptive in order to balance accuracy against cost- effectiveness

EU-MRG Stakeholder Day Next Steps Stakeholder Day on 12 May 2005 Publication of presentations and meeting minutes on DG ENV web-site Follow-up discussions between stakeholders and Commission/consortium, where appropriate (summer 2005) Participation of stakeholders in review process of revised MRG (during 2006)