OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/2014 2 MICE Finances - Forward Look.

Slides:



Advertisements
Similar presentations
Report from MICE project teams Proposed MICE organogram: revised Revised request for resources for financial year 2003/04 Review of iMICE schedules – status.
Advertisements

1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
1 MICE CM31 Key schedule drivers for Step IV Schedule table Milestone summary Comment on Step V Step VI Andy Nichols, STFC, 3/11/11.
Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
Global Magnet Systems including Field Mapping MICE Project Board 28 th June 2011 M Courthold – RAL R Preece - RAL.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
Electrical Installation CM39 Andy Gallagher & Ian Mullacrane.
Electrical & Control CM40 Daresbury Laboratory. CM40 Electrical Infrastructure Update RRM2 Latest Latest on Installation Progress Rack Allocations Racks.
Project Managers Report Video Conference 172 Roy Preece 11 th December 2014.
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
MICE - UK Project Progress Roy Preece 30 th April 2013.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Phase Two planning sequence Worries Don’t have time.
1 MICE CM32 Summary Scheduling and planning; aims for this year Schedule update Main schedule drivers Keeping us on schedule Comment on Steps V & VI Detail.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
1 MICE PM Report Completion of Infrastructure Target, solenoids Phase Two planning & schedule Non-MICE costs Staffing & visitors Don’t have time for a.
U.S. MICE Schedule, Cost, & Risks Peter H. Garbincius Mark Palmer, Alan Bross, Rich Krull Fermilab Presented at RAL – November 13, 2013.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
Magnetic Shielding Issues Roy Preece STFC - RAL. Overview Issues Items in harms way – Step IV Step IV mitigation plan –Racks –Compressors Current / Future.
RSLR mtg 28/3/2014 RLSR mtg Alan Grant. 2 RLSR mtg 28/3/ MICE Finances - Forward Look.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
Electrical & Control Power Supplies Trevor Hartnett.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
Hydrogen Delivery System Schedule MICE Schedule Review 23 rd -25 th May 2011 M Hills STFC.
RLSR 16/4/2015 UK Financial Plan & Risks. Content Finances – Cost to Completion Risks – Top level to completion – R9 working space – Summary 2 RLSR 24/11/2014.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
MPB 31 October 2012 and FAC 15 November monitor how well we are doing in assembling step IV ! -- should deliver a ‘realsitic schedule scenario’
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
Status of the MICE Construction Project Resource Loaded Schedule Review 29 th April 2014 Roy Preece.
1 Project Infrastructure for steps I-III Tim Hayler, STFC – RAL MICE Collaboration Meeting, RAL, nd October 2008.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
Finance Roy Preece STFC RAL Oversight Committee Meeting 27 th November 2015.
MICE – UK Plan Roy Preece STFC RAL DOE Review of MAP Brookhaven National Laboratory 13 th August 2014.
1 UK Project Roy Preece – STFC Alan Grant, STFC. Finance Staffing Update on stepIV position Milestones Critical Path – stepIV Magnetic field mitigation.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
MICE Construction Project Update: SSs, PRY, Cavities, Tracker… 1MAP Friday Meeting – January 30, 2015 Alan Bross.
MICE RF – Installation at RAL Tim Stanley RAL 7 November 2013.
RLSR 16/4/2015 UK Financial Plan & Risks. Content Finances – FY 2014/15 – Cost to Completion Risks – Top level to completion – R9 working space – Summary.
PSAG mtg 3/2/2014 PSAG mtg Alan Grant. 2 PSAG mtg 3/2/ MICE Finances FY 2013/14.
US Project Plan for MICE Peter H. Garbincius, Mark Palmer, Alan Bross, Rich Krull Fermilab April 5, 2016.
UK Project Plan (Finance & Risk) Alan Grant STFC DL RLSR 5 th April 2016.
The MAP 3-Year Plan Mark Palmer Fermilab September 26, 2014.
Schedule to completion, Risk and Critical Interfaces Roy Preece STFC RAL RLSR 16 th April 2015.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
1 UK Project Finance & Schedule. Overview Finance  Budget Setting 2013/14  June Finance  Forward look to complete stepVI Schedule  Overview 2.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Ionisation Cooling Test.
Schedule and Milestones Colin Whyte STFC RAL Resource Loaded Schedule Review 5 th April 2016.
UK Project Plan Roy Preece STFC RAL RLSR 26 th October 2015.
S A Griffiths CM42 June 2015 Electrical & Control.
Project Managers Report CM38 – Napa Roy Preece 24th February 2014.
Reported by Ron Prwivo for Ian Robson. Overview Response to Recommendations from the RLSR of November 2014 – very good, RF staffing remains an issue Very.
Muon Ionisation Cooling Experiment Overview
Resource Loaded Schedule and Budget Profile
Status of the MICE Construction Project
UK Financial Plan & Risks
MICE CM31 Schedule summary
MICE Project in the US: Completion of Efforts
MICE PM Report Progress with the Infrastructure A few problems
Presentation transcript:

OsC mtg 24/4/2014 OsC mtg Alan Grant

2 OsC mtg 24/4/ MICE Finances - Forward Look

3 OsC mtg 24/4/ Budget Estimate FY2014/15 – Resource Loaded Staff cost are STFC only  Includes 2.2FTE’s of PPD staff - (Govans 100%, Hayes 70%, Tucker 50%) PPD staff not included are:-  2.5FTE’s - Preece 100%, Loader 50%, Ricciardi 50%, Tucker 50% Figures include risk mitigation costs of 205k Ops & Analysis staff costs assume 2 FTE of effort from ISIS - this helps to mitigate risk Figures do not include any external income - Common Fund or EuCard 122k

4 OsC mtg 24/4/ Budget Estimate vs Current Allocation FY2014/15 Projected shortfall in allocation £387k Figures do include risk mitigation costs of 205k Figures do not include any external income - Common Fund or EuCard ~ 122k Ongoing - operational maintenance cost requirements, cranes, AC, chillers compressors need to be clearly understood However!!

5 OsC mtg 24/4/ Resource Loaded Forward Look Spend to Step VI Staff & Non Staff Mitigation/Contingency costs included in FY totals Assumes resource requirements positions are filled to deliver and operate MICE Essential resources:-  Operations Manager – Position Filled (S Byod)  Integration Scientist – Position Filled (P Hanlet)  Hall Manager – Position Filled (J Govans)  Cryo expert – Position filled at 50% level (M Tucker)  RF expert – Position Filled (T Stanley)  Agreement with ISIS for 2 technical staff this FY - increasing to 3 next FY for operations support

6 OsC mtg 24/4/ STFC Staff & Non Staff Costs to Step VI  Figures include 2.5FTE from PPD  Figures include 2FTE from ISIS FY14/15 – 3 FTE’s there after

7 OsC mtg 24/4/ Resource Loaded Forward Look Spend to Step VI Flat cash allocation assumed - £3,050M excludes RG’s STFC staff costs include overheads on resource project codes  Wp 1 – PM & PO  Wp 10- Operations and Analysis Risk mitigation costs included in Grand Totals Figures include 2 FTE of ISIS staff in operations & analysis wp FY14/15 – mitigates a lot of risks to the project. Rising to 3 FTE’s from FY15/16 onwards. Figures include 4.7 FTE’s of PPD staff each FY Income lines – Common Fund & Eu Card not included Proposed delivery of RFCC#2 in Sept 2019 means an allocation will be needed in 2019/20 FC#3 large capital expenditure 2017/18/19

8 OsC mtg 24/4/ Step IV Schedule

9 OsC mtg 24/4/2014 Schedule Overview  Schedule includes PRY for step IV following recommendations of the Magnetic Field Mitigation review panel.  All compressors will be installed on the West Wall. Compressors will not be installed until August  Magnet power supply and control racks will be installed in new rack room with full agreement of ISIS.  Schedule identifies tasks with risk element & associated risk delay. Continually ongoing  SS’s & Tracker’s assembled in R9 then moved to MICE Hall.  Magnet training only begins after cooling channel and PRY is installed (this includes EMR, KL & TOF).  10 weeks for all magnet training after cooling channel is installed.

10 OsC mtg 24/4/ Step IV Schedule - Shipping RF system - TIARA  RF distribution equipment delivered TH116 installed, 4616 pre amplifier installed, water services panel installed. Racks and control system now returned to Daresbury for commissioning second amplifier system. Upstream Spectrometer Solenoid - Delivered Downstream Spectrometer Solenoid - Expected May 2014 AFC #2 – Expected May 2014 EMR – Delivered and testing complete Diffuser – Available at Oxford PRY – South Yoke delivery delayed frame now expected mid August, plates to follow late October. North Yoke frame & plates now expected mid December (Risk)-(R2) 40day delay (Risk)-(R3) 20day delay (Risk)-(R4) 10day delay (Risk)-(R1) 80day delay

11 OsC mtg 24/4/ Step IV Schedule - Pre Installation R9 (Risk)-(R2) 40day delay (Risk)-(R3) 20day delay (Risk)-(R4) 10day delay (Risk)-(R1) 80day delay Trackers installed into Spectrometer Solenoids in R9 and then transferred to MICE Hall Upstream tracker installation complete AFC 1 & 2 magnet training and commissioning carried out in R9 AFC field mapping carried out in R9 – this cannot be done in MICE Hall

12 OsC mtg 24/4/ Mechanical Integration Work in Hall (Risk)-(R2) 40day delay (Risk)-(R3) 20day delay (Risk)-(R4) 10day delay (Risk)-(R1) 80day delay

13 OsC mtg 24/4/ StepIV - Installation  Magnet training can only begin after North PRY is installed and control racks have been commissioned in RR2  5 weeks for SS – 24/7 training operations to maximise US manpower investment in UK  5 weeks for combined magnet operation  Step IV cooling channel installation completion - March 2015  Magnet commissioning complete – mid May 2015 (Risk)-(R2) 40day delay (Risk)-(R3) 20day delay (Risk)-(R4) 10day delay (Risk)-(R1) 80day delay

14 OsC mtg 24/4/ Step IV Critical Path - 1 (Risk)-(R2) 40day delay (Risk)-(R3) 20day delay (Risk)-(R4) 10day delay (Risk)-(R1) 80day delay South PRY delivery AFC Field Mapping – may not be required TBA Compressor installation – infrastructure work

15 OsC mtg 24/4/ Step IV Critical Path - 2 Large amount of work for electrical team Dictated by the delivery and availability of key items, magnets, racks and PRY (Risk)-(R2) 40day delay (Risk)-(R3) 20day delay (Risk)-(R4) 10day delay (Risk)-(R1) 80day delay

16 OsC mtg 24/4/ StepIV Critical Path - 3 (Risk)-(R2) 40day delay (Risk)-(R3) 20day delay (Risk)-(R4) 10day delay (Risk)-(R1) 80day delay

17 OsC mtg 24/4/ Step IV – Critical Path (Filtered) Optimistic schedule 35% contingency applied to all tasks on the Optimistic schedule All identified risk delays scheduled Need to closely monitor and re-assess risks regularly

18 OsC mtg 24/4/2014 Step V (Transitional Schedule) – Critical Path (Risk)-(R2) 40day delay (Risk)-(R3) 20day delay (Risk)-(R4) 10day delay (Risk)-(R1) 80day delay Step V – Key Deliverables RFCC – March 2018, risk level 1 Hydrogen system 2 – Late 2015 RF system – Early 2015 PRY – not planned for in detail as yet!!

19 OsC mtg 24/4/2014 Step VI Schedule – Critical Path (Risk)-(R2) 40day delay (Risk)-(R3) 20day delay (Risk)-(R4) 10day delay (Risk)-(R1) 80day delay Step VI – Key Deliverables RFCC – Sept 2019, risk level 1 AFC – April 2018 Hydrogen system 3 – Late 2017 RF amplifier systems – November 2017 PRY – not planned for in detail as yet!!

20 OsC mtg 24/4/ Schedule Summary Step IV Critical path - driven by Hall infrastructure work, PRY and AFC mapping.  Still to be agreed if the AFC needs to be mapped. South PRY delivery now in two stages support structure mid August, plates late October North PRY delivery mid December Combined Spectrometer Solenoid training 5wks – 24/7 magnet operation Ongoing - identifying & quantifying risks. Risk Delay – assumes we incur all identified delays Schedule & risks need to be monitored as these will change Optimistic Finish Date Finish Date Includes Contingency 35% Delayed Finish date due to Risks Step IV Installation2/2/154/3/1519/11/15 Step IV magnet commissioning 13/4/1513/5/158/3/16 Step V27/8/1817/10/1825/5/19 Step VI14/5/2031/7/2017/4/21