RPC Trigger Electronics Review Subjects: Link System Low Voltage Link System Upgrade Krzysztof Doroba, University of Warsaw Krzysztof Doroba, RPC TRigger.

Slides:



Advertisements
Similar presentations
A3016 and MAO test at CAEN Pigi, A. Boaino & CAEN.
Advertisements

CMS Annual Review 2003 PACT - the RPC Muon Trigger Bari-Helsinki-Laapperanta-Warsaw Jan Królikowski Warsaw University.
Link Board Upscope Frascati group Napoli group Warsaw group.
RPC Trigger ESR Warsaw 08 July 2003 F. Loddo I.N.F.N. Bari Status report on RPC FEB production Status report on RPC Distribution Board Interfaces RPC-LB.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
LV and HV status of the RPC system RPC detector and trigger group.
Low Voltage LB status RPC detector and trigger group.
P. Paolucci - I.N.F.N. di Napoli 1 MTCC meeting May 06 HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV) 6/40  15% A3512N (HV) 10/10 
Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling on YB Fabio Montecassiano INFN PH/CMM.
Problems with Muon System N. Bondar O.Maev
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
r1Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling YB+2 and YB+1, extension to minus wheels and YB0, cables between UXC55 and USC55.
1 Status and Outlook of the RPC Commissioning Marcello Maggi/INFN-Bari.
1 RPC project Upgrade Anna Colaleo (INFN-Bari) on behalf of Bari (Resp.D.Creanza), LNF (Resp.S. Bianco), Naples (Resp.L. Lista), Pavia (Resp.P. Vitulo)
Paolucci INFN-Napoli Muon Annul Review Cern 15 September 2003 RPC cabling HV & LV cables Signal cables Position and composition of racks in UXC and USC.
10/06/09 UCLA Meeting Hauser 1/14 really Various updates Update on LHC schedule: Beam to Alice starts ~Oct. 24. Not all sectors are cold. Circulating beam.
25-Oct-2013 Upgrades Week “Muon plans for the Phase 2 TP” J. Hauser, UCLA  Phase 2 muon plans (presented at ECFA),  What’s new since Upgrade Week  New.
W.Van Doninck Re-scope TDR August 2008 The forward RPC system (TDR) China Korea Pakistan Gap production Korea Gap production Korea Front-end electronics.
Сессия Ученого Совета ОФВЭ 27 декабря 2006 Проект CMS в 2006 Ю.М.Иванов В.В.Сулимов.
“Breve” stato dell’apparato: Risultati e Problemi Anton, Ian, Nicolas, Saleh, Salvatore Barrel Endcap Endcap Endcap Cooling Endcap Cooling Last Minute.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
MoA and M & O-B Pigi Paolucci. Introduction The RPC endcap and barrel project were merged in an unique project in the 2009 and so we don’t have a long.
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack#
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
Dick Loveless Upgrade report 12 Oct EMU Upgrade Report Dick Loveless University of Wisconsin 12 October 2012.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
RPC Electronics Link system RPC Annual Review, CERN, June 13, 2006 Maciek Kudla for Lappeenranta and Warsaw University.
8-May-2010 LV Workshop1 Alignment LV: quick’n dirty HW review Alignment uses CAEN low voltage –No HV –Low power consumption electronics: under kW.
DT UPGRADE STRATEGY M.Dallavalle for the DT Collaboration 6/26/12 Muon IB1.
Cables Ian Crotty 8 May 2012 Cables for the RE4 Upscope in CMS News. The HV cables are in the Integration DB (INB/904) The Hv order is confirmed. Need.
W.Van Doninck February 2010 The CMS muon upscope Restore the TDR version of CMS  ME4 CSC’s and RE4 RPC’s on Yoke YE3  When ? During first long shutdown.
PIXEL CAEN Installation Status
P. Paolucci G. Pugliese M.Tytgat
Cables for the RE4 Upscope in CMS
University of Wisconsin
Integration and Services RE3/1 and RE4/1
Integration and Services RE3/1 and RE4/1
DCS: Temperature Probes
RPC Barrel HV & LV system Lappeenranta University
Jan Królikowski Warsaw University
Electronics for RPC Upscope
HV & LV status LV system in W+1 and W+2 is OK
RPC Configuration DataBase Pierluigi Paolucci - I.N.F.N. of Naples.
Pierluigi Paolucci - I.N.F.N. Naples
Pierluigi Paolucci - I.N.F.N. Naples
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
Regional Cal. Trigger Milestone: Production & Testing Complete
RPC Detector Control System
RPC Detector Control System
RPC Detector Control System
RPC Detector Control System
Dr. Pierluigi Paolucci - INFN di Napoli
Pierluigi Paolucci & Giovanni Polese
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
UXC55 ME Muon Endcap On Detector Layout
RPC Detector Control System
Fred’s Input to Rice Workshop
RLS components: repairs and spare status
HV & LV status LV system in W+1 and W+2 is OK
on behalf of Barrel RPC Collaboration
RPC Detector Control System
HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV)
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
RPC Detector Control System
RPC Configuration DataBase Pierluigi Paolucci - I.N.F.N. of Naples.
CSC Status Report Status reports;
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
Presentation transcript:

RPC Trigger Electronics Review Subjects: Link System Low Voltage Link System Upgrade Krzysztof Doroba, University of Warsaw Krzysztof Doroba, RPC TRigger Review,

Low Voltage Low Voltage for Link Board System 68 A A3486S+1A3486=10 MAO’s 21 Easy Crates Performance/Problems Painfull breaking period of CAEN products - factory recalls due to design imperfections 4 A3016 not delivered yet 2 MAOs and 3 A3016 failed during operation (fixed)‏ Krzysztof Doroba, RPC TRigger Review,

Low Voltage and Upscope Power Supply for VM Trigger Crates - already covered by Wojtek Okliński talk RPC System Upgrade: re-addinng re4 for η<1.6 extend acceptance up to η=2.1 Krzysztof Doroba, RPC TRigger Review,

Reduced RE system |  | < 1.6 ME3 1.6 ME4/1 restored MB1 MB2 MB3 MB4 RPC Muon Chamber Geometry Today ME1 ME2

ME4/1 restored MB1 MB2 MB3 MB4 ME1 ME2 ME3 Geometry After Upscope RPC Upgraded RE system |  | < 2.1

RPC Trigger Upgrade Krzysztof Doroba, RPC TRigger Review, RPC Trigger System Upgrade Trigger (USC55) part - covered by Wojtek Okliński Link System (UXC55) part more linkboards (MLB,SLB,CB)‏ more linkboard boxes (LBBox)‏ more LV PS extra cabling

Link system (1)‏ MLBSLBCBLBB re1,2< re3< Total Endcap Total Barrel Total < Staged Link system Krzysztof Doroba, RPC TRigger Review,

MLBSLBCBLBBox re1>1.672*12* re2> re3> re4> total> MLBSLBCBLBBox re4< re-adding re4 for |η|<1.6 Extending re1,re2,re3,re4 up to |η|<2.1 Link system (2)‏ * *MLB, CB and LBB for re1/1 are of the special type

Link system (3)‏ LBB boards MLBSLBCBTotal Total (+spares)‏ produced upgrade hi eta (w/o re1/1, re4)‏ upgrade re4, < upgrade re1/ LV LBBA3016A3486 installed system upgrade re4, re1/ upgrade re1/11282 Krzysztof Doroba, RPC TRigger Review, Low Voltage system upgrade:

LB System Cables LB system for RE4 needs new cabling (from LBB to USC) and room for crates RE1/1 requires no new cabling, LBBoxes installed RE1/1 requires room for Power Supplies Krzysztof Doroba, RPC TRigger Review, Questions: room for RE1/1 LV PS at YE+1,YE-1?