Summary of SGIP PAP2 2011 Activities since October 2011 Mingxi Fan, Jing Sun TR-45.5 Liaison to SGIP PAP2 858-845-3609 April 16 th, 2012.

Slides:



Advertisements
Similar presentations
Status of Channel Models IEEE WG Session #7 March 15-19, 2004 Qiang Guo Editor, Channel Modeling Correspondence Group C /30.
Advertisements

Doc.: IEEE r2 Submission November 2009 Bruce Kraemer, MarvellSlide 1 Wireless Characterization for NIST PAP#2 Date: Authors:
GSC-13 Presentation TR-45.5 Spread Spectrum Digital Technology -- Mobile and Personal Communications Standards.
Doc.: IEEE /0272r0 Submission February 2011 Ron Porat, Broadcom Outdoor Path Loss Models for ah Date: Authors: Slide 1.
Submission doc.: IEEE 11-13/0996r2 Aug 2013 Josiam, Taori, Tong - SamsungSlide 1 Outdoor Channel Model Candidates for HEW Date: Authors:
Doc.: IEEE r0 SubmissionBruce Kraemer, MarvellSlide 1 Smart Grid SC Closing Report– January 2012 Date: 19 January 2012 Discussion topics.
Doc.: IEEE r0 SubmissionBruce Kraemer, MarvellSlide 1 Smart Grid SC– January 2012 Date: 18 Janaury 2012 Discussion topics during November.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All Gale Lightfoot, Senior Staff Program Manager, Office of the CTO, SPB Cisco ATIS and the Smart Grid.
DOCUMENT #:GSC15-PLEN-xx FOR:Presentation SOURCE:TIA TR45.5 AGENDA ITEM:X.YY CONTACT(S): David Su Steve Whitesell.
Doc.: IEEE r0 SubmissionSlide 1 Smart Grid SC– March 2012 Date: 15 March 2012 Discussion topics during March Waikoloa Session NameCompanyAddressPhone .
IEEE 802 Smart Grid Adhoc. SGIP SGIP formed in 2009 by NIST – Provide support to meet requirements of Energy Independence and Security Act of 2007 (EISA)
Doc.: IEEE r0 SubmissionBruce Kraemer, MarvellSlide 1 Smart Grid SC– March 2012 Date: 18 March 2012 Discussion topics during March Waikoloa.
Evaluating IEEE Broadband Wireless as a Communications Infrastructure for Public Safety Activities Status Update and Demo 10/1/2007 J. Martin, M.
DOCUMENT #:GSC15-PLEN-xx FOR:Presentation SOURCE:TIA TR45.5 AGENDA ITEM:X.YY CONTACT(S): David Su Steve Whitesell.
Fostering worldwide interoperabilityGeneva, July 2009 GSC-14 Presentation Source: TIA TR-45.5 Spread Spectrum Digital Technology -- Mobile and Personal.
Doc.: IEEE r1 SubmissionBruce Kraemer, MarvellSlide 1 Smart Grid SC– March 2012 Date: 18 March 2012 Discussion topics during March Waikoloa.
Project: IEEE P Working Group for Wireless Personal Area Networks(WPANs) Submission Title: Link Budget for m Date Submitted: 5 March 2012.
Summary of SGIP PAP2 Activities since April 2012 Mingxi Fan, Alex Gogic, Jing Sun TR-45.5 Liaison to SGIP PAP June 11 th,
SMART GRID INTEROPERABILITY PANEL PRIORITY ACTION PLAN 2 WIRELESS COMMUNICATIONS DEC 6, :00 AM MOUNTAIN FACE-TO-FACE PHOENIX, AZ ROOM 162 WEBINAR.
Doc.: IEEE /1542r0 Submission November 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid SC– November 2011 Date: 08 November 2011 Discussion topics.
DOCUMENT #:GSC15-XXXX-nn FOR:Presentation or Information SOURCE:TIA AGENDA ITEM: CONTACT(S): Fran O’Brien
1 ITU-R Liaison Group Report - Session #67 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0046.
Doc.: IEEE /0251r0 Submission February 2011 Ron Porat, Broadcom Outdoor Channel Models for ah Date: Authors: Slide 1.
Cellular TDD in TIA Eric Jacks LinkAir Communications TIA TR45 Meeting Ft. Lauderdale, FL March 5, 2003 Notices: The contributor grants.
1 | 3GPP2 TSG-S | 11 May 2009 | Version Summary of SC.P the “3GPP2 Vision for 2009 and Beyond”
DOCUMENT #:GSC16-PLEN-xx FOR:Presentation SOURCE:TIA AGENDA ITEM:OPENING PLEN X.1 CONTACT(S): Fran O’Brien Mark Epstein.
© 2006 Sprint Nextel WP5D Meeting Results
Jeju, 13 – 16 May 2013Standards for Shared ICT TIA TR-50 M2M-Smart Device Communications Dr. Jeffery Smith Chief Innovation and Technology Officer/EVP.
1 LTE standards Status for this work in 3GPP and what next for the Future Francois COURAU 3GPP TSG RAN Chairman.
GSC-14 Presentation TIA TR-45.5 Spread Spectrum Digital Technology -- Mobile and Personal Communications Standards.
Doc.: IEEE /1340r0 Submission September 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid SC–Closing Report- September 2011 Date: 22 September 2011.
TSG-S Project Coordination Recommendations Nick Yamasaki TSG-S Chair ABSTRACT: This document presents TSG-S recommendations for improved coordination of.
Hitachi Ltd. 1 Hitachi Technical Approaches for Future RAN Evolution 3GPP2 Air Interface Evolution(AIE) Technical Experts Meeting(TEM) March 2005,
Doc.: IEEE /1112r2 Submission August 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid ad hoc – August 2011 Date: 17 August 2011 Discussions during.
Discussion on ax functional requirements
Active Call Hand-in in cdma2000 1x Airvana Qualcomm October 27 th, GPP2 Seoul, Korea Notice ©2008. All rights reserved. The contributors grants a.
Advanced Metering Implementation Team (AMIT) Update to RMS Presented by Christine Wright September 21, 2011
IEEE 802 Smart Grid Adhoc. SGIP SGIP formed in 2009 by NIST – Provide support to meet requirements of Energy Independence and Security Act of 2007 (EISA)
Summary of SGIP PAP Activities since October 2011 Mingxi Fan TR-45.5 Liaison to SGIP PAP December 5 th, 2011 ©2011.
ITU-R Liaison Group Report - Session #64 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0127 Date.
Doc.: IEEE /0506r2 Submission Doc.: IEEE /720r0 May 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid ad hoc – May 2011 Date: 09 May 2011.
Machine-to-Machine(M2M) Communication for cdma2000 Systems Orlett W. Pearson, 3GPP2 Liaison Report to TR-50 August 2012.
DOCUMENT #:GSC15-PLEN-52 FOR:Presentation SOURCE:ATIS AGENDA ITEM:PLEN 6.11 CONTACT(S):Maria Estefania ATIS and.
Date:20 July, 2009 Abstract: This contribution contains DO Rev. C Mobile Transmit Diversity Proposal. Notice Contributors grant a free, irrevocable license.
C Title: Next Steps for Femtocells Date: 03 December 2007 Source: Airvana, Alcatel-Lucent, Nortel Abstract:The contribution addresses.
Fostering worldwide interoperabilityGeneva, July 2009 GSC-14 Presentation Source: TIA Spread Spectrum Digital Technology -- Mobile and Personal Communications.
0 Peter J MacLaren 6Sep2001 & 5Dec2002 Recommended Action Plan for endorsement by WCD Noting prior recommendations to:  Support the international process,
Fostering worldwide interoperabilityGeneva, July 2009 GSC IMT Task Force Report Kohei SATOH Managing Director, ARIB Global Standards Collaboration.
Jeju, 13 – 16 May 2013Standards for Shared ICT Telecommunications Standards for Smart Grids David Su National Institute of Standards and Technology Document.
Spatial Channel Model Ad-Hoc Status Contribution Number: C50-SCM _SCM-AHG_Status Source: Achilles Kogiantis(973)
Jeju, 13 – 16 May 2013Standards for Shared ICT Dr. Farrokh Khatibi Director of Engineering Qualcomm ATIS and the Smart Grid Document No: GSC17-PLEN-63.
Summary of SGIP PAP2 Activities Update as of August 2012 Alex Gogic, Mingxi Fan, Jing Sun TR-45.5 Liaison to SGIP PAP
DOCUMENT #:GSC15-PLEN-xx FOR:Presentation SOURCE:TIA TR45.5 AGENDA ITEM:X.YY CONTACT(S): Smart Grid Standardization Activities TIA TR-45.5 Input Smart.
7 th ITU-R WP5D Meeting Summary February 17-24, 2010 Orlett W. Pearson March 2010 Copyright Statement. Alcatel-Lucent grants a free, irrevocable license.
Continuing Cooperation on IMT Standardization
Sounding Antenna Switching for IEEE m Amendment Working Document
Evaluation Model for LTE-Advanced
HIS Smart Grid – Summary (1)
Smart Grid SC– May 2012 NIST PAP2 activities of interest to 802 Name
Standards for Shared ICT
Wireless Characterization for NIST PAP#2
NIST Framework and Roadmap for 5
Smart Grid SC– January – NIST PAP2 Name Company Address Phone
Smart Grid ad hoc Closing Report – May 2011
Wireless Characterization for NIST PAP#2
Update of ARIB Activities on IMT Standardization
GSC IMT Task Force Report
Continuing Cooperation on IMT Standardization
Continuing Cooperation on IMT Standardization
Telecommunications Standards for Smart Grids
Presentation transcript:

Summary of SGIP PAP Activities since October 2011 Mingxi Fan, Jing Sun TR-45.5 Liaison to SGIP PAP April 16 th, 2012 ©2011 Third Generation Partnership Project Two (3GPP2).All rights reserved. Permission is granted for copying, reproducing, or duplicating this document only for the legitimate purposes of 3GPP2 and its organizational partners. No other copying, reproduction, or distribution is permitted. Chicago, ILC

PAGE 2 General Background: PAP2 in SGIP Smart Grid Interoperability Panel Priority Action Plan 2 ( ) works on wireless technologies for smart gridSmart Grid Interoperability PanelPriority Action Plan 2http://collaborate.nist.gov/twiki-sggrid/bin/view/SmartGrid/SGIP In January 2011, PAP2 approved a document summarizing its work in 2010, “Guidelines for Assessing Wireless Standards for Smart Grid Applications.” ( sggrid/pub/SmartGrid/PAP02Objective3/NIST_PAP2_Guidelines_for_Assessin g_Wireless_Standards_for_Smart_Grid_Applications_1.0.pdf)Guidelines for Assessing Wireless Standards for Smart Grid Applicationshttp://collaborate.nist.gov/twiki- sggrid/pub/SmartGrid/PAP02Objective3/NIST_PAP2_Guidelines_for_Assessin g_Wireless_Standards_for_Smart_Grid_Applications_1.0.pdf –Guidelines’ main content is a discussion of wireless air interface modeling –Specific technology performance in that document is from the respective SDOs in the Annex A through E: Wi-Fi, LTE, HSPA, cdma2000, and WiMAX In 2011, PAP has been focusing on the evaluation of wireless technologies –In the SGIP Catalog of Standards ( sggrid/bin/view/SmartGrid/SGIPCatalogOfStandards), none of the cellular standards have been “identified.” cdma2000 1x and HRPD are listed under the “under review” section.Catalog of Standardshttp://collaborate.nist.gov/twiki- sggrid/bin/view/SmartGrid/SGIPCatalogOfStandards 2 C

PAGE 3 Wireless Technology Evaluation in PAP2: Wireless SDOs The PAP2 SDO subcommittee, consisting of representatives from IEEE , ATIS, TIA TR45.5, and WiMAX Forum, continues to develop technology assessment methodology –The group meets every Monday 9:00 to 10:30 a.m. PST –The goal of this group is to update the NIST IR 7761 Guidelines for Assessing Wireless Standards for Smart Grid Applications, with a focus on the wireless communication aspects –SDO subcommittee reports progress to PAP2 during biweekly PAP2 calls Recent focus of the PAP2 SDO subcommittee is to complete chapters 4, 5, and 6 of the guideline document –Chapter 4: wireless technology descriptions correspond to “Wireless Functionality and Characteristic Matrix for the Identification of Smart Grid Domain Applications” ( sggrid/pub/SmartGrid/PAP02Objective2/Consolidated_NIST_Wireless_Characteristi cs_Matrix-V5.xls)“Wireless Functionality and Characteristic Matrix for the Identification of Smart Grid Domain Applications” ( sggrid/pub/SmartGrid/PAP02Objective2/Consolidated_NIST_Wireless_Characteristi cs_Matrix-V5.xls –Chapter 5: wireless technology evaluation method that includes an initial screening and refinements to the screening using a combination of analysis, simulation, and/or testbed in the field. –Chapter 6: Performance metric and associated considerations 3 C

PAGE 4 Status of Guideline Development Chapter 4 –90+% complete –Pending final review of the text by the group –No plan for resubmitting the matrix Chapter 5 –Capacity estimation method and Link/MAC/System modeling review complete –Spectrum choices and deployment modeling tool currently under review –Target to be completed by May 2012 Chapter 6 –Has not started –Need to decide specific content and seeking lead editor –Additional details on the spectrum allocation and options in the US needs to be considered C

PAGE 5 Smart Grid Modeling Tool Interface under Development 5 C

PAGE 6 Modeling Tool Status Not yet fully reviewed by SDO-subcommittee Limited to land-based, outdoor BS, & PMP topology, indoor or outdoor terminal locations –5 Outdoor path loss models to choose from –Covers 700 MHz to 6000 MHz –BS antenna heights 7 to 80 meters in rural and suburban with varied (but not extreme) terrain characteristics –10 meter BS antenna height for urban microcell, otherwise above rooftops –Handles TDD and FDD –Channel capacity estimates based on uniform distribution of terminals – and will differentiate between DL and UL Estimates for penetration loss & interference margins based on limited data/references 6