1 The information contained in this Presentation is confidential information as per your terms and conditions with British Telecommunications plc (BT).

Slides:



Advertisements
Similar presentations
crm customer relationship management
Advertisements

Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
Crm customer relationship management 1 The information contained in this presentation is confidential information as per your terms and conditions with.
Crm customer relationship management 1 The information contained in this presentation is confidential information as per your terms and conditions with.
11 Simultaneous Provide. 22 Disclaimer: The information contained in this Presentation slide-pack is confidential information for discussion purposes.
Ofcom Consumer Switching
1 The information contained in this Presentation is confidential information as per your terms and conditions with British Telecommunications plc (BT).
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
Crm customer relationship management 1 The information contained in this presentation is confidential information as per your terms and conditions with.
© 2013 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 1 © 2013 Cisco and/or its affiliates. All rights reserved. 1 Just Switch It.
1 The information contained in this Presentation is confidential information as per your terms and conditions with British Telecommunications plc (BT).
1 The information contained in this Presentation is confidential information as per your terms and conditions with British Telecommunications plc (BT).
1 The information contained in this Presentation is confidential information as per your terms and conditions with British Telecommunications plc (BT).
Ofcom Consumer Switching
1 The information contained in this Presentation is confidential information as per your terms and conditions with British Telecommunications plc (BT).
Operating and Configuring Cisco IOS Devices © 2004 Cisco Systems, Inc. All rights reserved. Operating Cisco IOS Software INTRO v2.0—8-1.
11 Ofcom Consumer Switching 17 June 2014 Bev Bytheway-Jackson WBC Product Manager Tel:
These measures are applicable to the 20C Broadband Network. The information contained in this briefing is confidential as per your terms and conditions.
Roadmaps Andy Wright Natalie Walker Simon Brisbourne.
1 Copyright © 2011 Kony Solutions, Inc. CONFIDENTIAL 1 SLA and Escalation Matrix Dec 15, 2014.
Broadband Product Road Map 2012/13 H2 2013/14 H1 2013/14 H2 20C Fibre 21C Migration from 20C IPstream to 21C Wholesale Broadband Connect Release AK 17.
Unit Number Oct 2011 Nov 2011 Dec 2011 Jan 2012 Feb 2012 Mar 2012 Apr 2012 May 2012 Jun 2012 Jul 2012 Aug 2012 Sep (3/4 Unit) 7 8 Units.
CD FY08 Tactical Plan Status FY08 Tactical Plan Status Report for Network Operations & Administration Rick Finnegan April 22, 2008.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
1 The information contained in this Presentation is confidential information as per your terms and conditions with British Telecommunications plc (BT).
CD FY08 Tactical Plan Status FY08 Tactical Plan Status Report for Network Infrastructure Upgrades Rick Finnegan April 22, 2008.
Presented by :- Stuart Tilley - Network & Systems Technician Conference – Network overview and proposed enhancement th March 2008.
Delivering Capacity, Low Latency and Low Jitter Jim Freeze, SVP Marketing & Alliances October 2007.
1 Project Update and Summary of Project Priority List (PPL) Activity RMS August 4, 2015.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
Quarterly update webcall on BT’s 21CN programme 28 th April 2009 Welcome to the BT's 21CN programme is subject to consultation and further development.
1 The information contained in this Presentation is confidential information as per your terms and conditions with British Telecommunications plc (BT).
The public information campaign to communicate about the process of migration to BT’s next generation network Version 11 – 24 September 2007 Information.
1 The information contained in this Presentation is confidential information as per your terms and conditions with British Telecommunications plc (BT).
Crm customer relationship management 1 The information contained in this presentation is confidential information as per your terms and conditions with.
Narrowband & IP Strategy Steve Wickenden & Dave Hughes 12 November 1999.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
Introduction to 21CN Resilience Tim Hubbard Head of 21CN Solutions Strategy.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
CD FY08 Tactical Plan Status FY08 Tactical Plan Status Report for Network Infrastructure Upgrades Rick Finnegan April 22, 2008.
BT Wholesale TDM Circuit Strategy “Evolution rather than revolution” Consult 21 – Industry Webcall 29 th January 2009.
Crm customer relationship management 1 The information contained in this presentation is confidential information as per your terms and conditions with.
WBC Quality of Service (QoS) Options 23 rd October 2008 Andy Maddocks Dave Brennan Paul Fishburn Paul Burke.
PPC Industry Forum, 4 December Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
What’s New in Fault Diagnostics The Fault Diagnostics upgrade to 15.2 specification will be split into two upgrades for this release, the first.
1 Project Update and Summary of Project Priority List (PPL) Activity July 16, 2015.
1 © 2003, Cisco Systems, Inc. All rights reserved. CCNP 1 v3.0 Module 1 Overview of Scalable Internetworks.
1 Project Update and Summary of Project Priority List (PPL) Activity June 11, 2015.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
Crm customer relationship management 1 The information contained in this presentation is confidential information as per your terms and conditions with.
1 | © 2015 Infinera Open SDN in Metro P-OTS Networks Sten Nordell CTO Metro Business Group
1 Project Update and Summary of Project Priority List (PPL) Activity April 16, 2015.
Consult21 Consult21 Working Group – Broadband and LLU 3rd Meeting 19 April :00 – 14:00 WELCOME.
Crm customer relationship management 1 The information contained in this presentation is confidential information as per your terms and conditions with.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
1 The information contained in this Presentation is confidential information as per your terms and conditions with British Telecommunications plc (BT).
1 The information contained in this Presentation is confidential information as per your terms and conditions with British Telecommunications plc (BT).
1 The information contained in this Presentation is confidential information as per your terms and conditions with British Telecommunications plc (BT).
1 Project Update and Summary of Project Priority List (PPL) Activity November 12, 2015.
©2011 Pacific Gas and Electric Company. All rights reserved. SmartMeter TM Steering Committee Update – March 2012.
Routers. Juniper T4000 unveiled on Nov. 2010, not ship until the second half of achieve twice the capacity of Cisco CRS-3 T4000 boasts capacity.
Broadband and LLU Working Group 18 January Broadband and LLU Working Group Membership BT Industry representatives Terms of Reference To ensure a.
©2011 Pacific Gas and Electric Company. All rights reserved. SmartMeter TM Steering Committee Update – August 2012.
11/23/2018 3:03 PM © Microsoft Corporation. All rights reserved. MICROSOFT MAKES NO WARRANTIES, EXPRESS, IMPLIED OR STATUTORY, AS TO THE INFORMATION IN.
Xoserve IX Refresh Customer Update 05/03/2019.
Ethernet diagnostic journey explained
Rev. 2 Wireless Local Number Portability and Pooling Phase 2 Implementation Guideline INDUSTRY 2002 SERVICE PROVIDER JAN FEB MAR APR MAY JUN JUL AUG SEP.
Rev. 2 Wireless Local Number Portability and Pooling Phase 2 Implementation Guideline INDUSTRY 2002 SERVICE PROVIDER JAN FEB MAR APR MAY JUN JUL AUG SEP.
Presentation transcript:

1 The information contained in this Presentation is confidential information as per your terms and conditions with British Telecommunications plc (BT). Please treat it accordingly and do not forward, republish or permit unauthorized access. BT reserves the right to make changes to the information in this Presentation at any time without further notice. BTW Planned Engineering Works 90 day overview February 2013 to May 2013 These dates are indicative dates only and not to be used for any forecasting purposes as they are all subject to change. Please ensure that you wait for formal notifications from IRAMS.

2 BTW 2012 Network Changes – 3 month rolling plan Whilst BTW has continually worked to enhance its network, we are currently undergoing an exceptional level of change driven by four main drivers:- –Stability – to improve the reliability of the network, BTW is targeting certain network elements with hardware and software improvements. –Capacity – the need for additional capacity is driven by an increase in the number of broadband users on the 21C network (through migration from 20C and growth) and also by the ever-increasing bandwidth demands of those users. –Resilience –to improve the resilience of the network, BTW is actively removing single points of failure from the network –New Functionality – to meet the needs of the market BTW needs to enhance its network to deliver the services its customers require. This presentation outlines the key upgrade programmes, their drivers, customer impact and the number of upgrades per programme per week. BTW is keen to deliver all the required improvements as quickly as possible whilst actively managing the risk to customers. For this reason a range of run-rates against each programme has been outlined. The actual run-rates achieved will be determined by this ongoing live analysis of risk. Customer outage times for the PEWs start between 00:01 and 02:00 with the aim of completing customer impacting work by 04:00. This allows 2 hours for roll-back should the PEW be unsuccessful. Business as usual capacity upgrades and upgrades to resilient structures have not been listed here.

3 Customer Service / BTID Network Change - Executive Summary Deployment Priorities Feb – Apr 2013 Prog No: UpgradeKey DriversTotal Upgrades Average EU Impact per upgrade Affected Products Average EU outage (Mins) Upgrades per week Target Months Targat End FebMar Apr May LAG DeploymentResilience, scaling, stability. IEA-P, EEA-P, P-P, MSPE-P TBC0None04 Ongoing 500G IEA chassis upgrade Scaling 4 port 10G line-card TBC TBA 2nd vendor P card Upgrade ScalingTBC TBA MSE MigrationsScaling, Functionality 200k EU WBC / WBMC Ongoing 20c 2 nd vendor BRAS Upgrade TBC 20c BBTBC TBA

4 Ongoing 21C Upgrades Prog No: UpgradeKey Drivers Upgrades Complete / Total EUs per upgrade Upgrades per PEW Affected Products Av. End user outage (Mins) Upgrad es per week Progress Planned End Feb Mar Apr May SVLAN moves Capacity, Stability OngoingAv 800 Min 0 Max WBC35Up to 75 Ongoing EEA – EES Backhaul Uplift Capacity1052/1060Non Customer impacting 40None05 Mar 13 CRS SMU Upgrades Stability33/52Non Customer impacting 1None016 Mar 13 HT-BEA IOS-XR Upgrade Functionality 2/6Average 200k 1WBC / WCC 15 mins1 Mar 13 6 SVLAN moves - these moves offload SVLAN’s (bundles of Broadband traffic) from one BRAS to another. This is carried out to alleviate capacity issues mplet 24 EEA – EES 7750 Lag Migration - This change provides increased scalability. 31 Software upgrade to increase platform stability. 35 Software upgrade to support BTR 40G Product requirements

5 Ongoing 21C Upgrades Cont’d Prog No: UpgradeKey DriversUpgrades Complete / Total EUs per upgrade Upgrades per PEW Affected Products Av. End user outage (Mins) Upgrad es per week Progress Planned End Feb Mar Apr May BRAS P8 Upgrade Functionality (IPv6), stability. 13/257BB EU’s per BRAS Av Max WBC / WBMC 45Up to 24 Jun-13 High Throughput BEA-VS Capacity7/10Av 120K1WBC / WCC 45 mins1 Jun-13 2 nd vendor MSPE Software Upgrade Functionality (Lag Support), stability. 1/80None1 4 May-13 SVLAN moves - these moves offload SVLAN’s (bundles of Broadband traffic) from one BRAS to another. This is carried out to alleviate capacity issues mplet HT-BEA- Capacity requirement for bigger switch. 13 slot device replacing 9 slot device Capacity – Software upgrade to replace software which is going out of vendor support.

6 Ongoing 20C Upgrades Cont’d Prog No: UpgradeKey DriversUpgrades Complete / Total EUs per upgrade Upgrades per PEW Affected Products Av. End user outage (Mins) Upgrad es per week Progress Planned End Dec Jan Feb Mar 10k BRAS SB11 Stability 47/122Av Min 3000 Max WBC35Up to 18 Feb 13 36

7 Completed 20C Upgrades

8 Completed 21C Upgrades Progr No: UpgradeKey Drivers Upgrades Complete / Total BB EUs and/or Ethernet Circuits per upgrade Upgrad es per PEW Affected Product s Av. End user outage (Mins) Upgrade s per week Date Ended Copper MSAN Upgrade Function ality 5594/5594Non- Customer Impacting Up to 120 None0Up to 480 Dec 11 EAD Chassis Code Upgrade Stability6950/6950Up to 15 Ethernet Circuits Up to 200 Ethernet, Mobile Ethernet <1Up to 1000 Feb 12 21C BRAS Core Migration Capacity151/151Non Customer Impacting Up to 12WBC Feb 12 BEA VS Card Upgrade Capacit y 20/20 – Complete Non- Customer Impacting 1None0Up to 4 Mar 12 DDR Hardware replacement Stability200/200Non Customer impacting 10None050 May

9 Completed 21C Upgrades Progr No: UpgradeKey Drivers Upgrade s Complet e / Total BB EUs and/or Ethernet Circuits per upgrade Upgrad es per PEW Affecte d Product s Av. End user outage (Mins) Upgrade s per wee Date Ended EAD Chassis Code Upgrade Stability6950/6950Up to 15 Ethernet Circuits Up to 200Ethernet, Mobile Ethernet <1Up to 1000 Feb 12 21C BRAS Core Migration Capacity151/151Non Customer Impacting Up to 12WBC Feb 12 BEA VS Card Upgrade Capacity20/20 – Complete Non- Customer Impacting 1None0Up to 4 Mar 12 DDR Hardware replacement Stability200/200Non Customer impacting 10None050 May 12 MPLS Core Router Upgrades Code Update109/109 Av Min 0 Max WBMC 180 (240 Max) 1-4 Jun

10 Completed 21C Upgrades Progr No: UpgradeKey Drivers Upgrade s Complet e / Total BB EUs and/or Ethernet Circuits per upgrade Upgrad es per PEW Affecte d Product s Av. End user outage (Mins) Upgrades per week Date Ended High Throughput BEA-VS Capacity5/5Av 120K1WBC / WCC 45 mins1 Jun 12 BRAS software Upgrade Stability193/193 Av Max WBC / WBMC/ WCC 45 minsUp to 50 Jul 12 Copper MSAN Software Upgrade Stability / Capacity 5844/5844 Average WBC / WBMC 30 mins480 May 12 2 nd vendor MSAN Upgrade Stability702/702Average WBC / WBMC/ WCC 40 mins Jul 12 2 nd Vendor MSPE Stability51/51Av 20k1WBC / WCC / Ethernet 30 secs – 2 mins 2 Jan

Broadband Services on 21CN

12 Ethernet Service on 21CN

13 Descriptions

14 Management of risk