GAS TURBINE COMBINED- CYCLE GENERATION POWER PLANT STABILITY MODELS AND MODEL VALIDATION Juan S. Santos Senior Consultant, System Planning.

Slides:



Advertisements
Similar presentations
1 TSS Report PCC Meeting Salt Lake City, UT October 26-27, 2006.
Advertisements

Model Specification Requirements MSRATF Meeting – Mar 11, 2013 Stephanie Lu, MVWG Chair Seattle City Light.
Enter. Looking for modelling software? Need ways to understand your process better? Looking for specialist to develop process.
© Hyder Consulting Pty Ltd Local Government Waste Summit 2006 Total Cost Approach for Waste Management Christine Wardle 10 February 2006.
NERC/GADS Reporting Requirements John Yale Hydro Plant Engineering Manager Chelan County PUD 1.
1 Community Partnership Training. 2 STAR Partners.
Updated 1/28/2011. Technical Requirements & Regulatory Issues In Interconnection Agreements March 9, 2011 Jay Caspary ·
Monitoring and Controlling the Project
ERCOT VRT Study, Phase I ERCOT ROS Meeting December 10, 2009.
ERCOT Staff Facilitator Juan S. Santos Senior Consultant, System Planning Technical Operations WIND GENERATION STABILITY MODELING TASK.
Introducing The Trade Workbench Trade Workbench Evaluation Tools Detailed Promotion Evaluation analysis tools based on industry best practices that are.
System Strength Discussion
UML Static diagrams. Static View: UML Component Diagram Component diagrams show the organization and dependencies among software components. Component:
COMBINED HEAT AND POWER (CHP) FOCUS ON DISTRIBUTED GENERATION Stevens Institute of Technology Mechanical Engineering Department Prof. Siva Thangam Supported.
Prof. Seppo Virtanen TUT PURESAFE Final Conference Tuesday 20 January 2015, 14:20 – 14:40 RAMS Methods and Tools: From LHC to FCC.
NORM BASED APPROACHES FOR AUTOMATIC TUNING OF MODEL BASED PREDICTIVE CONTROL Pastora Vega, Mario Francisco, Eladio Sanz University of Salamanca – Spain.
Federal Transit Administration Office of Safety and Security FTA BUS SAFETY & SECURITY PROGRAM 18 th NATIONAL CONFERENCE ON RURAL PUBLIC AND INTERCITY.
Facilities Maintenance Customer Satisfaction Survey.
TRAINING AND OPERATIONS PERFORMANCE SYSTEM (TOPS)
Resource Asset Registration Form Version 5.0 / 5.1 Changes for WGRs QMWG Presentation - July 9, 2012.
Woody Rickerson ROS/WMS Update June 2013 RARF Data Completion Project.
EPRI CIM for Dynamic Models Project Report Terry Saxton Xtensible Solutions May 13, 2009.
Managing Operational Energy in Buildings
Project Management Life Cycle Katy Koenen 05/07/2013.
System Operations Staffing Request Presented to the ERCOT Board Of Directors By Sam Jones, COO November 16, 2004.
PROJECT NO PUCT STAFF WORKSHOP 11/19/14 Julia Harvey Kristi Denney Kevin Mathis Jasmin Thevaril.
1 Financial Reporting Updates for Estimates School Generated Funds & BPS Supply Chain Guideline Forms March 4 th, 2010 OASBO Finance Workshop.
Research, Development, Consulting, Training High Fidelity Modeling and Simulation Where we are going… …future plans.
Ahmad Al-Ghoul. Learning Objectives Explain what a project is,, list various attributes of projects. Describe project management, discuss Who uses Project.
Software Testing. What is Testing? The process consisting of all life cycle activities, both static and dynamic, concerned with planning, preparation.
L3: GP METHODOLOGY / 1 Asian Productivity Organization, Tokyo Overview and Methodological Framework of GP Methodology Guiding Principles of GP GP Methodology.
August 17, 2012 Solar PV Inverters Anuj Dixit Planning Engineer Resource Integration RPG Meeting.
Resource Asset Registration Form Version 5.1 Update July 12, 2012.
What’s The Cost? How much?  Refer to your home work :  What other costs are there?  How much does that come to per month?
DS2 – Grid Integration Dynamic Modelling of Wind Generation in Ireland
Transit Bus Safety and Security Program Federal Transit Administration.
Utilizing High-set Load Shedding Schemes (UHSLSS) to Replace Responsive Reserve Obligation Juan S. Santos (512)
Discussion of Reliability Must-Run (RMR) Protocol Provisions ERCOT Technical Advisory Committee November 6, 2002.
Using the FRP to Enhance Georgia’s Leadership Program May 9, 2006 Stephanie Busch P 2 AD.
Optimizing Deployment of CCGT Duct Firing Capacity in the Nodal Market Josh Clevenger Brazos Electric Cooperative.
Town of Broadway Fiscal Year 2016 Budget May 19, 2015.
Learning in Networks and challenges related to the competence development of educators 5th Nordic Conference on Adult Learning Nordic Network for Adult.
Page 1 JUSTIFY define and validate REQUIRE- MENTS define initial management DOCUMENTS define INFRA- STRUCTURE allocated maintenance changes management.
– 1Texas Nodal Texas Nodal ICCP Business Case By Jeyant Tamby, ERCOT.
Lecture 6: Time Response 1.Time response determination Review of differential equation approach Introduce transfer function approach 2.MATLAB commands.
Module 4: Systems Development Chapter 13: Investigation and Analysis.
DEX 7 – Operational Feedback Business Need Introduction This exchange enables the transmission of information on the condition and usage of a supported.
1  Power plant costs are key factors in energy market policy decisions Key assumptions in the EIA NEMS model Input factors to all energy economic models.
Model Validation using PSS®E
PSP Thermal stations. Thermal plant Electric power generation system block diagram Electric power generation system block diagram Steam station Major.
DWG Procedural Manual: Wind Model Requirements DWG Request to ROS August 11, 2006.
State Estimator Redaction Task Force Progress Report to WMS/ROS 5/11/2011.
Nodal Planning Model Process and Data Set A case use June 28, 2010 Planning Working Group.
Wind Turbine Power Plant. Sources ●
ERCOT DYNAMICS WORKING GROUP Report to ROS August 16, 2007 Vance Beauregard, American Electric Power.
BAL-001-TRE-1 CPS2 Waiver FERC-Ordered Modification to ERCOT waiver CPS2 Report to RSC December 16, 2008.
1 PSSE Playback Model Validation with PMU Data Damien Sommer, P.E. Senior Transmission Planning Engineer.
Michele Winship, Ph.D.  Compliance with HB 153/SB 316 requirements?  Seek out and get rid of “bad” teachers? OR  Improve teaching.
Administrators view – home page Communication tools Administrator’s tools The bulletin board for your key messages Place important messages on the bulletin.
MANAGEMENT INFORMATION SYSTEM
Minnesota Renewable Energy Integration and Transmission
PSCAD models.
Monitoring and Controlling the Project
The International Plant Protection Convention
Date of download: 11/6/2017 Copyright © ASME. All rights reserved.
NERC Update: Current Activities Ryan Quint, Ph.D., P.E.
Date of download: 12/25/2017 Copyright © ASME. All rights reserved.
WORKSHOP Data analysis and report writing Out of school Drop-outs
PROCESS TRAINING.
ETVX Process Notation.
Presentation transcript:

GAS TURBINE COMBINED- CYCLE GENERATION POWER PLANT STABILITY MODELS AND MODEL VALIDATION Juan S. Santos Senior Consultant, System Planning

What are ERCOT concerns: All Studies are trash !!

TITANIC = ERCOT

Purpose of RFP Approach Open PROCESS Open PROCESS Stakeholder - Value added Stakeholder - Value added Group Process Group Process Funding $$$ Funding $$$ Future Model Development Future Model Development

ELEMENTS OF RFP TASK 1: Collect field data from measurements to validate models TASK 1: Collect field data from measurements to validate models TASK 2: Validation of existing models in ERCOT base case simulations and through field measurements TASK 2: Validation of existing models in ERCOT base case simulations and through field measurements TASK 3: Development of New CC Models as Required. TASK 3: Development of New CC Models as Required. –Requires validation in ERCOT base case simulations and through field measurements TASK 4: Training in utilization of NEW models TASK 4: Training in utilization of NEW models

VALIDATION ? Do the models work in our system Do the models work in our system Requires “ Volunteers ” Requires “ Volunteers ” Generic–one size fits all (?) Generic–one size fits all (?) Time and Effort Time and Effort $$$ $$$

STABILITY GAS TURBINE MODEL DEVELOPMENT More questions ? More questions ? Existing models – Valid ? Existing models – Valid ? –capture the effects for all of the studies that we do? What models need to be developed ? What models need to be developed ?

MODELING REQUIREMENTS Control Block Diagrams Control Block Diagrams Incorporated in the PTI PSSE program and model library. Incorporated in the PTI PSSE program and model library. Validation that the numerical model responds the same as the “real world”. Validation that the numerical model responds the same as the “real world”. Flexible Model Flexible Model Account for both Real and Reactive power under steady state and dynamic studies Account for both Real and Reactive power under steady state and dynamic studies Source Code - FORTRAN Source Code - FORTRAN

VERY ROUGH COST ESTIMATE Model Development $125,000 to $200,000 Model Development $125,000 to $200,000 Travel/Meetings $10,000 to $20,000 Travel/Meetings $10,000 to $20,000 Validation /Testing $50,000 to $80,000 Validation /Testing $50,000 to $80,000 Data Research $20,000 to $30,000 Data Research $20,000 to $30,000 Monitoring Equipment $20,000 to $30,000 Monitoring Equipment $20,000 to $30,000 Totals estimated at $225,000 to $360,000 Totals estimated at $225,000 to $360,000

DRAFT TIME TABLE

SYSTEM UNSTABLE ?