1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specifications-Show how project.

Slides:



Advertisements
Similar presentations
FEDERAL AID PLAN DEVELOPMENT
Advertisements

Metro Muncipal Agreement Program
ODOT Structure Project Manager Seminar Specifications
Project Development Process (PDP) Structures. PDP – Three Project Levels Major Project ~ 14 Steps Major Project ~ 14 Steps Minor Project ~ 10 Steps Minor.
Change Order Missouri Local Programs How to Complete a Change Order & Get it Approved.
ESTIMATING - A CONTRACTORS PERSPECTIVE. Company History/Background Oman Construction was founded in 1876 First bridge contract in 1881 First Highway Contract.
Requirements for Federal Aid Project Contracts Kenneth Spear, Contracts & Estimates Engineer.
Construction Cost Estimation Michael Mincic Civil Engineering Technology Department 22 February 2007.
Chapter 14 Pricing General Expenses. Objectives Upon completion of this chapter, you will be able to: –Define general expenses –Use a checklist to identify.
Cost Estimation System Tool
3-1 Utility Conflict Identification and Management Lesson 3.
With the Genesee County Road Commission By Fred Peivandi, P.E. And Ken Johnson, P.E. Local Road Funding.
MAJOR REVISIONS TO THE POLICY FOR ACCOMMODATING UTILITIES ON HIGHWAY RIGHTS Presented By: Mark Attaway March 29, 2011.
Pre-Construction Phase 1 - Job Site Conditions Work Plan -2.
ESTIMATING By Laith Jacob.
Office of Traffic, Safety and Technology Chapter 7 Signing Plan Sets Traffic Signs 101 November 20, 2014.
Programming/BudgetEngineering.. Current WisDOT Policy and Guidelines : mega/mg-budget-est-mgmt.pdf
2014 CONSTRUCTION ESTIMATES Estimates Estimates 3 Point of the illustration? Document your assumptions.
1 Introduction to QA/QC Process. 2 CHECKLISTS SheetsItems to CheckGeneral Reference YesYes NoNo N/AN/A General General Plan Content DM=Design Manual General.
2015 Traffic Signals 101 Topic 12 Special Provisions.
MnDOT Sample Plan - Jerry Kotzenmacher MnDOT
1 Addendum Preparation Process ESC-OE Caltrans. 2 Introduction An addendum is a change in contract requirements for an advertised project for which bids.
Quantities 2 Plans Prepared by Heath Bielefeldt Wisconsin Department of Transportation
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT August 21, 2014.
AASHTO Subcommittee on Construction 2010 Annual Meeting Summary of C&T Section Work Plan Surveys August 16–20, 2010 Summary of C&T Section Work Plan Surveys.
 Do you have an Interest in Math and Science?  Do you have good problem solving skills?  Do you approach problems in an analytical manner?  Can.
Dr. Ralph Ellis Click to edit Master title style Click to edit Master subtitle style 1 Dispute Review Board Value Contributions Ralph Ellis, P.E., Ph.D.
Mike Baumann Statewide Utility Engineer January 22, 2015.
Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out Square Foot Estimating.
Planning for Earthwork Construction
Estimator Tips and Future Plans John Riedl P.E. Lucien Darensburg 2008.
CE303: Introduction to Construction Blueprint Lab.
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT November 19, 2013.
Highway Operations Section Technical Standards Branch Section overview.
Estimating PS&E – Plans, specifications and estimate 1.
Jason Chapman Data Collection & Management Systems.
IDM Chapter 104 Utility Coordination Gail Lee Utility and Railroad Engineer, INDOT June 10, 2015.
Office of Traffic, Safety and Technology Module 5 Work Zone Plan Sets Module 5 Work Zone Plan Sets Traffic Control Plan Development Course.
Estimates and Quotes Apply procedures to develop plans, estimates and quotes Objective 4.03 Remember key terms, abilities needed, and items included in.
Mass Highway Department (MHD) Design Process Anticipate possible use of MHD funds Anticipate possible use of MHD funds New Design Guide for Project Development.
IRWA Educational Mini Conference IRWA Educational Mini Conference Chapter 26 Presenter: Richard Diaz, Jr. P.E. September 16-17, 2010  Reading Right-of-Way.
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specification-Show how project.
Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012.
Plan Scales (see DOT 1B-3) 22”x34” paper for final designs (preliminary usually ½ size, 11”x17”) 1. Plan view: a) Rural a) 1:1000 plan scale (or 1”=100’)
2010 Construction Contract Standards Training Part 2 Prototype October 2011.
Cost Estimation Strategies for Keeping Track of the Vastness Presented by: David Lake, P.E. Roadway Designer Nevada Department of Transportation
Needs What is it? Needs What is it?. Minnesota Statute Apportionment of money to counties. Subd. 2. Money needs defined. For the purpose of this.
An Introduction to Contracts and Design Guides Presented by: David Lake, P.E. Roadway Designer Nevada Department of Transportation.
Stacy Hagenbucher.  Process Improvements  Clarification  Trends  Finals Tracking  Trends  Why Missing Dates  Additional Resource  Issues on sites.
Lunch. Estimates Ballpark Accountant Typical Stages Conceptual (Alternatives) Schematic 30% Plans 60% Plans % Plans.
Civil Engineering Surveying Roy Frank. Basic Route Survey and Design 1.Concept for Route 2.Reconnaissance Study 1.Small scale mapping of region (1”-500’
HORTICULTURE II - LANDSCAPE Unit B Landscape Design.
 To provide a realistic accurate idea of the cost  Provide information about building or not.
Engineering a Good Project Drew Seaman. Engineering: the work of designing and creating large structures (such as roads and bridges) or new products or.
PROJECT CLOSEOUT MODULE 11. Objectives Establish procedures for effective/smooth project close-out As-built plans Project payment Certifications Report.
Transportation Engineering Business Development Workshop Department M
Chapter 8 Specifications & Special Provisions
5th Street Bridge Replacement Project Contract No
Chapter 8 Specifications & Special Provisions
* Topic 12 Special Provisions
Traffic Control Plan Development Course
IA 122 RECONSTRUCTION PRE-BID MEETING
9/18/2018 Bids CONTRACTING Khamis…..
PS&E – Plans, specifications and estimate
Chapter 7 Signing Plan Sets
CE 3500 Transportation Engineering Vehicle and driver characteristics
General comments: These projects are locally owned and the LPA should be involved and informed throughout the project. The project agreement is between.
PLAN PREPARATION BASICS GENERAL LAYOUT
Stream Crossing Replacement Policy
ACEC Designer Training
Presentation transcript:

1 PS&E Plans, Specifications and Estimate

2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specifications-Show how project is to be built Specifications-Show how project is to be built Estimate-Show quantity estimates (not $) Estimate-Show quantity estimates (not $)

3 Plans: Title Sheet Index Typical Sections Summary of quantities Plans/ProfilesMJ Misc. Tables/details Earthwork Summary Sheets

4 Plans continued: Signs Traffic Signal plans Lighting plans Pavement marking plans Utility plans Large Culvert Details Retaining Walls Bridge Plans

5 Specifications-not std. specs Special specs must be added to proposal Special specs must be added to proposal Main Office specs (already approved) Main Office specs (already approved) Regional Specs (must be written/approved prior to letting) Regional Specs (must be written/approved prior to letting)

6 Standard Sheets There are many standard sheets: standard sheetsstandard sheets-Earthwork -Guide Railing -Signs-Culverts -Bridge Design Details (BDD) Applicable ones must be listed

7 Regional Spec Examples Water Main Work Utility Work Special Items New Materials

8 Special Notes Try to avoid too many (let standard specs handle details) Examples include permit conditions or items to be salvaged, etc.

9 Special Notes Try to avoid too many (let standard specs handle details) Examples include permit conditions or items to be salvaged, etc.

10 Other Info available to bidder Cross Sections Utility/drainage estimate sheets Sign Face Layout shets Subsurface soils investigation reports Other Special Reports

11 Procedures for modifying PS&E Errors Additions (minor) Clarification

12 Report on Design Designer Location of Project Table of Lengths Type of Construction Road History Adjoining Highways Soils Investigations Grades Stopping Sight Distances AlignmentDrainageRight-of-Way

13 Report on Design-Continued Sidewalks Sanitary Sewers Utilities Permits and Agreements Special Situations StructuresMPTTCDFencing Pricing (Lump Sum Analysis) Salvage

14 Engineer’s Estimate Quantities included in plans Engineer’s estimate not given to contractor Prices not available to contractor—each contractor provides their own bid

15 Estimate Shares HighwayBridgeUtilities Different Counties

16 Estimating Steps List all item numbers – from plans & other similar plans List all item numbers – from plans & other similar plans Estimate quantities and provide detailed backup Estimate quantities and provide detailed backup Assign prices to each item – from similar jobs or average bid price information Assign prices to each item – from similar jobs or average bid price information Provide lump sum price analysis (personnel, equipt., time, wage rates, rental, etc.) Provide lump sum price analysis (personnel, equipt., time, wage rates, rental, etc.) Calculate final estimated prices Calculate final estimated prices

Final Exam Review Horizontal Curves Horizontal Curves Rational Method Rational Method Manning’s Equation Manning’s Equation Cross-Sections (Avg End-Area Method) Cross-Sections (Avg End-Area Method) CBC/Retaining Walls (Understanding Standard Sheets/Dwg’s/Bar Lists/Estimates) CBC/Retaining Walls (Understanding Standard Sheets/Dwg’s/Bar Lists/Estimates) Lighting/Guide Railing Lighting/Guide Railing 17

Final Exam Review Open book/open notes/ Open book/open notes/ Can use computer (but monitored) Can use computer (but monitored) No cell phones; no old tests No cell phones; no old tests Show all work Show all work Don’t forget units Don’t forget units 18