General Tab Project, Cost Schedule, and Work Limits Roadway Character

Slides:



Advertisements
Similar presentations
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Advertisements

Section 4(f) and Section 6(f) Updates questions to:
Section 4(f) Section 6(f). Section 4(f) Process Overview 2 Project Initiation Package Field Review 4(f) Property Present Use Coordination NEPA Document.
Project, Cost Schedule, and Work Limits Roadway Character Design Criteria for Bridges Maintenance of Traffic Right-of-Way & Utility Involvement General.
Maryland Avenue and Arkwright Street Nick Fischer, EIT Ramsey County Jerry Auge, PE Project Manager Ramsey.
Cost Estimation System Tool
State Road 46 Pavement Replacement Owen Valley High School Wednesday, September 3, 2014.
WELCOME! October 28, 2013 ODOT District 1 & District 2.
I 65 Added Travel Lanes Project Clark County Ivy Tech Community College Thursday, March 12, 2015.
Hardin County Engineering Department September 12, 2006.
Environmental Assessment Public Meeting
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
January 30, 2014 Luke Lortie, EIT Jerry Auge, PE
U.S. 31 at CR 400 South Roundabout Information Meeting December 18, 2013 Clifty Creek Elementary Columbus, Indiana.
I-65 Added Travel Lanes Project in Tippecanoe County
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
AGENDA  PROJECT HISTORY  NORTHERN SECTION UPDATE  SOUTHERN SECTION OVERVIEW  INTERCHANGES  PROJECT SCHEDULE  UPCOMING ACTIVITIES  OPEN DISCUSSION.
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
Other Resources Farmland Categorical Exclusion Training Class.
Old Policy – which no one ever seem to have heard of.
Bridge Building Timelines Presented by The Richland County Engineers Office Thomas E. Beck, PE, PS 77 North Mulberry Street Mansfield, Ohio Jan.
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
SR25 Preventative Maintenance Project in Tippecanoe County
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Presented by: The Ohio Department of Transportation 1 Land Use Managing the Environmental & Project Development Process.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
St Johnsbury BF 7000(20) Bridge 6 on VT Route 2B over the Lamoille Valley Rail Trail Presenter: John Byatt, PE Consultant Project Manager.
A New Paradigm for Utility Coordination Kenny Franklin INDOT Director of Utilities and Railroads.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
Roundabout Study and Design EDSM Revisions
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
Office of Traffic, Safety and Technology Module 4 Work Zone Applications Traffic Control Plan Development Course.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
S.R. 930 and Green Street Intersection Improvement Project Tuesday, May 22, :00 p.m. Presentation Park Hill Learning Center Auditorium New Haven,
Request for Environmental Services (RES) Missouri Local Programs How to Complete The Request for Environmental Services.
Presentation Outline  Recommendation  Project Background  Public Involvement  Proposed Design  Citizen Comments/Questions  Summary and Recommendation.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
MD 97 (Georgia Avenue) at Randolph Road Purpose Improve vehicular, bicyclists and pedestrian safety Improve Levels of Service Increase capacity Improve.
Community Impacts Environmental Justice Public Involvement Categorical Exclusion Training Class.
U.S. 33 Road Reconstruction Goshen High School Auditorium 6 p.m. Wednesday, August 20, 2014.
Washington Thoroughfare Study Proposed Improvement of Washington Street Hainesville Road to Lake Street Lake County Hainesville Road Lake Street Washington.
STA Safety Project PID #76439 December 12, 2006.
Section 4(f)/6(f) Categorical Exclusion Training Class.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
SR 256 Road Rehabilitation Town of Austin January 18, :00pm Austin Elementary School.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 9 January 19, 2016.
Geometric Design: General Concept CE331 Transportation Engineering.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
FTA Real Estate March 26, 2014 Christopher S. Van Wyk Director FTA Environmental Office.
Connecting South Dakota and the Nation Access Management Training Brooke White, Access Management Engineer.
Girvin Road Improvements (Atlantic Blvd. to Wonderwood Dr.) Public Information Meeting March 3, 2016.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
Maintenance and Temporary Traffic Control
Community Impacts Environmental Justice Public Involvement Categorical Exclusion Training Class.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
Section 4(f) Categorical Exclusion Training Class.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
PROJ. 566(17) LOR PID MAJOR WIDENING
Community Impacts Underserved Populations Public Involvement
Section 4(f) Categorical Exclusion Training Class – Presented by the Office of Environmental Services.
Geometric Design: General Concept CE331 Transportation Engineering.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
S.R. 26 Road Rehabilitation in Clinton County
Environmental Commitments
Presentation transcript:

General Tab Project, Cost Schedule, and Work Limits Roadway Character Project, Cost Schedule, and Work Limits Roadway Character Design Criteria for Bridges Maintenance of Traffic Right-of-Way & Utility Involvement Categorical Exclusion Training Class

Project Cost Schedule Work Limits

Categorical Exclusion Training Class Project Information CE Level is determined in Document Level Tab Completed by District C1, C2, D1, D2, D3, or EA/EIS Populated from ELLIS PID Project Name Project Sponsor District Project Costs Planning/Engineering, ROW, and Construction Reflects Preferred Alternative Most current cost estimates by phase Categorical Exclusion Training Class 3

Categorical Exclusion Training Class Project Information Funding Source Private and/or public Answer drop-downs appropriately STIP/TIP Contact District staff to confirm the most current estimate meets requirements prior to CE approval Enter reference number Interchange Modification or Justification Study Categorical Exclusion Training Class 4

Categorical Exclusion Training Class Project Information Project Description Proposed action Setting Environmental impacts Relocations MPO, local government involvement Categorical Exclusion Training Class 5

Categorical Exclusion Training Class Work Limits Limits of Proposed Work Direct from ELLIS Start and end points (SLM) and total work length (miles) are entered manually Categorical Exclusion Training Class 6

Categorical Exclusion Training Class Online CE – General Tab Categorical Exclusion Training Class 7

Categorical Exclusion Training Class Online CE – General Tab Categorical Exclusion Training Class 8

Project Description Example Categorical Exclusion Training Class 9

Online CE Project File/Part of CE Locational Mapping USGS Topo County Aerial Photographs Preliminary Plan Sheets Categorical Exclusion Training Class 10

Roadway Character

Categorical Exclusion Training Class Roadway Character Functional Classification Based on type of service the roadway provides Select classification from drop-down menu ADT (Average Daily Traffic) Vehicular Traffic Design Year – (20 years after opening year) Daily Hourly Volume (DHV) Proportion of traffic moving in the peak direction during the design hour Categorical Exclusion Training Class 12

Categorical Exclusion Training Class Roadway Character Truck percentage Truck traffic as a percentage of total traffic Setting and topography Select appropriate answer from drop-down menu Categorical Exclusion Training Class 13

Categorical Exclusion Training Class Roadway Character Existing & proposed roadway design criteria Existing design compared to proposed Design criteria provides a basis to evaluate potential environmental impacts Identify what criteria is expected to be implemented, if the design is uncertain If more than one roadway impacted, Ellis will need to include each one accordingly Number of lanes Turning and through lanes Categorical Exclusion Training Class 14

Categorical Exclusion Training Class Roadway Character Design speed Speed facility is designed to accommodate Legal speed Posted legal speed limit Type of lanes Through or two-way left-turn lane (TWLTL) Pavement, shoulder, median & sidewalk width Existing and required width per L&D manual Categorical Exclusion Training Class 15

Categorical Exclusion Training Class Online CE - General Tab Categorical Exclusion Training Class 16

Design Criteria for Bridges

Design Criteria for Bridges Existing and proposed design criteria for each existing and proposed structure Direct from Ellis Structure File Number (SFN) Sufficiency Rating Bridge type Proposed bridge design data is entered manually Categorical Exclusion Training Class 18

Design Criteria for Bridges Answer drop-downs appropriately Structure replacement or rehabilitation Historic bridge Asbestos removed Not listed correctly in Ellis if SFN tab does not appear Categorical Exclusion Training Class 19

Categorical Exclusion Training Class Online CE - General Tab Categorical Exclusion Training Class 20

Maintenance of Traffic

Categorical Exclusion Training Class Remarks Be clear and concise Discuss proposed temporary roadway, lane closures and/or detours anticipated during construction Include references to specific applicable policies Specify how proposed maintenance of traffic (MOT) will impact the local community EMS, fire, police, schools, businesses, etc. Categorical Exclusion Training Class 22

Categorical Exclusion Training Class Remarks Specify how the general public, safety services, and local government will be made aware of closures and subsequent detours State who is responsible for issuing the notice More advanced notice is required for complex MOT List environmental commitments Answer yes in the drop-down to generate table Categorical Exclusion Training Class 23

Categorical Exclusion Training Class Remarks Example Maintenance of traffic will be handled in four phases. During Phase One SR 999 will be reconstructed north of SR 45. SR 999 will be closed north of SR 45. The detour will utilize SR 328 to US 25 then back to SR 999 (final MOT map will not be available until Stage 2 Design Plans). During the time special provisions will be made for the property owners to access their homes. Essentially, the single residential property owner has two driveways. During the entire construction of the project, at least one drive will be available at all times. During Phases Two & three, SR 999 intersection will be reconstructed. Traffic will be maintained with part width and the use of signals. During Phase Four, SR 999 south of the intersection will be constructed. SR 999 will be closed. The detour will include SR 328 to US 55 and back to SR 999. There are not through-traffic dependent businesses or festivals needing accommodations or special provisions. Also, locals, and emergency vehicles will utilize township and county roads as needed. A news release will be provided 2 weeks before construction begins in order to notify the local’s. Categorical Exclusion Training Class 24

Categorical Exclusion Training Class Online CE - General Tab Categorical Exclusion Training Class 25

Right-of-Way & Utilities

Right-of-Way & Utilities Acquisition figures Temporary & permanent ROW are listed separately Answer utility drop-downs List specific utilities impacted Utility coordination is initiated during NEPA, but is typically an on-going commitment Categorical Exclusion Training Class 27

Categorical Exclusion Training Class Remarks Indicate type and location of ROW impacts Strip takes Easements or work agreements Impacts to residences, businesses, etc. Identify all utilities impacted List environmental commitments Categorical Exclusion Training Class 28

Categorical Exclusion Training Class Remarks Example Estimated right-of-way needed for the project is based on preliminary drawings and construction limits. Approximately 10.25 acres (12 parcels from 9 owners) is expected to be acquired from land owners in Westmoreland County and 4.045 acres (62 parcels from 55 owners) is expected to be acquired from land owners in Eastern County. Strip right-of-way approximately 1.85 acres will be acquired from the Madison Park owned and operated by the MetroParks of Westmoreland County. All utilities shown on the project plans or located during project construction will be relocated or adjusted by the owner of the utility. The project may require the relocation of the following utilities: electric, gas, telephone, water, cable, and sewer. All utility work shall be coordinated between the contractor and the utility owners in such a way as to avoid and/or minimize any inconvenience to potentially affected customers. All utility work not included in this contract shall be performed by the affected utility owner or its contractor and will be compliant with ODOT roadway design standards. Utility work will be ongoing throughout construction of the project. Categorical Exclusion Training Class 29

Categorical Exclusion Training Class Online CE - General Tab Categorical Exclusion Training Class 30