Xavier Le Gouard Rich Power Supplies Monitoring and Control RICH Monitoring and Control using FSMs.

Slides:



Advertisements
Similar presentations
Status of PMD DCS. PMD Layout Unit Module Super Module Converter + Support Plate Total channels Preshower+Veto = 221,184 8 Supermodules in 2 planes 48.
Advertisements

Xavier Le Gouard Rich Power Supplies Monitoring and Control RICH Power Supplies Monitoring and control.
The Control System for the ATLAS Pixel Detector
TPC-RO DCS set-up PVSS main(s) Iseg OPC server HV Iseg crates (3)LV Wiener crates (22) CAN bus Interface to FEE -temp.mon -I &V mon. Wiener OPC server.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
Electrical distribution for ALICE experiment & Electronic Rack Control S. Philippin.
HV-LV DCS Workshop – 16/03/2004 G. De Cataldo, A. Franco, A.Tauro - INFN Bari Progress report on the HMPID LV System Cabling and LV sectorsCabling and.
March 16, 2004Alice controls workshop, S.Popescu Low Voltage and High Voltage OPC status and plans.
SPD DCS Status Report Ivan Amos Calì a,b, S.Ceresa a,c, C.Torcato de Matos a a CERN-AIT a CERN-AIT b Università degli studi di Bari b Università degli.
Experiment Control Systems at the LHC An Overview of the System Architecture An Overview of the System Architecture JCOP Framework Overview JCOP Framework.
Detector Control System at the GIF++ A. Polini, M. Romano (AIDA+INFN Bologna) on behalf of WP group Gif++ User Meeting 11/07/2014 Outline Status.
HV for SM surface testing 2 nd Workshop on the Detector Control System for TRD University of Tsukuba Kengo Watanabe.
1 Integration of the HV Distribution System to the First TRD Super Module P. Mantzaridis, A. Markouizos, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis,
Clara Gaspar, May 2010 The LHCb Run Control System An Integrated and Homogeneous Control System.
1 CALO DCS power supply status CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  Introduction  Power supply description with hardware.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
MDT PS DCS for ATLAS Eleni Mountricha
S.Sergeev (JINR). Tracker consists of  4 chambers of 4 views each In total ~7200 drift tubes (~450 per view) To be controlled/monitored  HV system.
TPC DCS update. CR3 UX-A/C CR4-Z08 UX-A/C CR3 CR4-Z08 UX-A/C CR4-Y08 Chambers ISEG Chambers Wiener Ethernet RCU Chambers, detector ELMB
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
DCS Plans and Pending Activities for 2013/14 Shutdown Muons in general Replacement/upgrade of DCS computers OS migration to Win-7, Win-2008 or SL6 PVSS.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
D etector C ontrol S ystem ALICE DCS workshop G. De Cataldo CERN-CH, A. Franco INFN Bari, I 1 Finite State Machines (FSM) for the ALICE DCS:
TPC Prototype III TPC module anode HV edge LV module analog digital Cool sensor Gas sensor Shift Expert DCS Ch Skirt.
André Augustinus OPC news, versions to use on behalf of Sorina Popescu.
Controls EN-ICE Finite States Machines An introduction Marco Boccioli FSM model(s) of detector control 26 th April 2011.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
André Augustinus 10 March 2003 DCS Workshop Detector Controls Layout Introduction.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
Bruno Belbute, October 2006 Presentation Rehearsal for the Follow-up meeting of the Protocol between AdI and CERN.
ACC ? Detector PVSS II Ethernet Database(s) OPC client DIM client High VoltageLow Voltage User interface PVSS II LV PMD Control room (ACR) [FSM?]
L0 DAQ S.Brisbane. ECS DAQ Basics The ECS is the top level under which sits the DCS and DAQ DCS must be in READY state before trying to use the DAQ system.
04ABR07Calo Commissioning Meeting - Xvc1 Power Supplies Xavier Vilasis-Cardona.
October 9th 2006ALICE WEEK - DCS WorkShop1 DEVICE USER SUPPORT OVERVIEW - Presentation - First Line Support - Reference System - Current Developpement.
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
K.WyllieElectronics meeting 29/05/061 RICH Power Supplies & Grounding Thanks to Johan Morant Paolo Baesso Xavier Le Gouard.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
1 H C A L S.Sergueev, NEC2001, Varna, September 2001 CMS HCAL Slow Control System for the CMS Hadron calorimeter S.Sergueev, FNAL/JINR CMS HCAL.
XXVI workshop on resent developments in High Energy Physics and Cosmology Ancient Olympia,16-19 April 2008 Tsarouchas Charilaos NTUA Detector Control System.
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
13-Mar-061 ACORDE DCS ACORDE GROUP CINVESTAV, ICN-UNAM, MICHOACAN. PUEBLA México.
DCS for TRD Pre-trigger Ken Oyama Jan. 22, 2007 DCS Workshop in Heidelberg.
Preliminary conducted noise test results for LV power supplies Bruno Allongue CERN-PH-ESS Fernando Arteche Imperial College – CERN 21 January 2005.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
S.Sergeev (JINR). Tracker consists of  4 stations of 4 views (planes) each In total ~7200 drift tubes (~450 per view) To be controlled/monitored 
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
1 LHCb CALO Anatoli Konoplyannikov Introduction Short recipe of the calorimeter Marathon crates control Step by step explanation Marathon power.
DCS Meeting - 17/6/2002 G. De Cataldo, A.Franco - INFN Bari - 1 The implementation of the HMPID DCS in the PVSS-JCOP Framework The Liquid Circulation and.
JCOP Framework and PVSS News ALICE DCS Workshop 14 th March, 2006 Piotr Golonka CERN IT/CO-BE Outline PVSS status Framework: Current status and future.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
V.Duk, INFN Perugia1 CHOD/NHOD status Viacheslav Duk, INFN Perugia Ferrara,
27SEP2008Calo Running and Operation Monday Meeting - Xvc1 ECS Xavier Vilasis-Cardona.
The Maraton LV system Michela Lenzi INFN Firenze Thanks to V. Bocci, P. Ciambrone, A. Sciubba LV Power Supply RCM AC/DC converter.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
PVSS an industrial tool for slow control
Institute of Nuclear Physics Polish Academy of Sciences
ATLAS MDT HV – LV Detector Control System (DCS)
TOTEM Configuration Tools
The LHCb Run Control System
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

Xavier Le Gouard Rich Power Supplies Monitoring and Control RICH Monitoring and Control using FSMs

8/30/2006Rich Monitoring and Control using FSMs 2 ISIMA (1) ISIMA: College of Engineering in Computer Science, Modeling and Applications. ISIMA By Night ISIMA: Institut Superieur d’Informatique, de Modélisation et de leurs Applications

8/30/2006Rich Monitoring and Control using FSMs 3 ISIMA (2) Five Specializations: F2: Software Engineering F1: Hardware Engineering F3: Database and Simulation F4: Modeling F5: Telecommunications

8/30/2006Rich Monitoring and Control using FSMs 4 Outline Introduction RICH Conventions The RICHElectronics Project Aliases Power Supplies The Configuration Database Setting up FSMs CAEN WIENER LV Conclusion

8/30/2006Rich Monitoring and Control using FSMs 5 Naming Conventions: Column Name: (RI/LE/UP/DO)+ ’Column’ + Number LEColumn0…LEColumn8 RICH Convention Introduction RICH Conventions Naming Conventions Column Initialization The RICHElectronics Project Setting up FSMs Conclusion

8/30/2006Rich Monitoring and Control using FSMs 6 Naming Conventions Changes Right & Left in the PIT? RICH Conventions cont. Introduction RICH Conventions Naming Conventions Column Initialization The RICHElectronics Project Setting up FSMs Conclusion

8/30/2006Rich Monitoring and Control using FSMs 7 Column Initialization

8/30/2006Rich Monitoring and Control using FSMs 8 Aliases Introduction RICH Conventions The RICHElectronics Project Aliases Power Supplies The Configuration Database Setting up FSMs CAEN WIENER LV Conclusion Column Name Implementation Device Editor & Navigator Main Panel Power Supplies Panels Scripts

8/30/2006Rich Monitoring and Control using FSMs 9 PVSS CAEN Panel Introduction RICH Conventions The RICHElectronics Project Aliases Power Supplies The Configuration Database Setting up FSMs CAEN WIENER LV Conclusion CAEN One channel powers all HPD of one column 16 boards per crates. Ethernet connection to PVSS Work with PVSS Configure the OPC server. Set up the alias.

8/30/2006Rich Monitoring and Control using FSMs 10 PVSS WIENER Panel Introduction RICH Conventions The RICHElectronics Project Aliases Power Supplies The Configuration Database Setting up FSMs CAEN WIENER LV Conclusion WIENER MARATON Two channels power up the LV board Radiation Tolerant Ethernet connection to PVSS Work with PVSS Configure the OPC server. Create the panel. Set up the alias.

8/30/2006Rich Monitoring and Control using FSMs 11 Configuration Database Introduction RICH Conventions The RICHElectronics Project Aliases Power Supplies The Configuration Database Setting up FSMs CAEN WIENER LV Conclusion The Configuration Database: Load a set of values from Oracle. No need to know SQL. Work with PVSS Connect to a Database. Store configurations for Aliases, CAEN and WIENER. Retrieve them easily.

8/30/2006Rich Monitoring and Control using FSMs 12 CAEN FSM Introduction RICH Conventions The RICHElectronics Project Aliases Power Supplies The Configuration Database Setting up FSMs CAEN WIENER LV Conclusion Bruno Belbute’s lbLVTool FSM-ConfDB Interface fwCaenDefaultChannel:

8/30/2006Rich Monitoring and Control using FSMs 13 WIENER FSM Introduction RICH Conventions The RICHElectronics Project Aliases Power Supplies The Configuration Database Setting up FSMs CAEN WIENER LV Conclusion Panel for the FSM visualization New FSM Type Bruno Belbute’s lbLVTool

8/30/2006Rich Monitoring and Control using FSMs 14 DCS FSM Introduction RICH Conventions The RICHElectronics Project Aliases Power Supplies The Configuration Database Setting up the FSM CAEN WIENER LV Conclusion DCS Tree DCS Sequence WIENER channels CAEN channel Temperature sensors DCS Infrastructure WIENER crate CAEN crate

8/30/2006Rich Monitoring and Control using FSMs 15 Specs Mezzanine FSM Introduction RICH Conventions The RICHElectronics Project Aliases Power Supplies The Configuration Database Setting up the FSM CAEN WIENER LV Conclusion LV board: Two registers: RegOutLSB, RegOutMSB FSM describes DCS L0 states

8/30/2006Rich Monitoring and Control using FSMs 16 Specs Mezzanine FSM Introduction RICH Conventions The RICHElectronics Project Aliases Power Supplies The Configuration Database Setting up the FSM CAEN WIENER LV Conclusion

8/30/2006Rich Monitoring and Control using FSMs 17 Documentation Introduction RICH Conventions The RICHElectronics Project Aliases Power Supplies The Configuration Database Setting up the FSM CAEN WIENER LV Conclusion RICH Electronics Specs Mezzanine FSM richelectronics.web.cern.ch

8/30/2006Rich Monitoring and Control using FSMs 18 Conclusion Introduction CAEN Presentation PVSS FSM Configuration Database Wiener Maraton Presentation PVSS FSM Conclusion Project RICHElectronics up to date. DCS branch ready DAQ branch near completion