Solar Power Project at the Sacramento Regional Wastewater Treatment Plant August 26, 2015.

Slides:



Advertisements
Similar presentations
Transportation Funding Alternatives and Outreach
Advertisements

GLENARM POWER PLANT REPOWERING PROJECT WORKSHOP
Sacramento Local Agency Formation Commission (LAFCo) ANALYSIS OF PROPOSED SMUD SPHERE OF INFLUENCE AND ANNEXATION Presented by Chris Tooker Friday, October.
M ontgomery County Climate Protection Plan 2010 Update March 25, 2010.
State and Local Initiatives to Combat Global Warming AB A Framework for Change James N. Goldstene California Air Resources Board October 22, 2008.
Solar System Project Overview Presented by: Brandon Robertson, Town Manager April 29, 2014.
Paul A. Weghorst Executive Director of Water Policy
April 25–27, 2005 Phoenix Civic Plaza/Hyatt Regency Phoenix Phoenix, AZ NCMA World Congress 2005 “Prime Time: Contract Management at the Core of the Enterprise”
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
SOLAR IMPACT ON FYI Kevin Meikle, Architect Airports Planning Manager 4995 E. Clinton Way Fresno, Ca (559)
1 SUSTAINING AGRICULTURE: SANTA CLARA LAFCO’s EXPERIENCE August 31, 2007 CALAFCO CONFERENCE Sacramento.
THE DEVELOPMENT OF THE BRONKHORSTSPRUIT BIOGAS PROJECT
Connecticut’s Energy Future Removing Barriers to Promote Energy Sustainability: Public Policy and Financing December 2, 2004 Legislative Office Building.
Houghton College/NextEra Solar Array. Solar Array Details 2.5 MW system covering 11 acres 2.92 million kWh production (equivalent to powering 270 homes.
Technologies 1 Solar Power. Proprietary Information Of Energy 2013 Overview Solar Feasibility (Is solar an option?) Mounting Options Things to consider.
IMPERIAL VALLEY CONFERENCE July 21, SOLICITATION RENEWABLES PORTFOLIO STANDARD.
Genesis Solar Module Brochure ™
Making Clean Energy Simple and Profitable for Our Clients Page Solar Closed Landfills: Project Economics in Massachusetts June 2009.
Public Transit Department Bus and Fuel Procurement Strategy AzTA/ADOT Transit Conference April 2013.
Lamma Power Station Solar Power System. 2 Content Project Background Site Selection Amorphous Silicon Thin Film Photovoltaic System Environmental Benefits.
Lassen Lodge Hydroelectric Project Public Scoping Meetings November 5, 2014 (Sacramento and Red Bluff) State Water Resources Control Board Division of.
Saving With Solar: LESSONS FROM THE MORRIS HYBRID Power Purchase Agreements MODEL April 18, 2013 ASES ANNUAL CONFERENCE BALTIMORE, MARYLAND.
1 Utility Ownership of Wind Power: Why it makes sense now American Wind Energy Association May 17, 2005 Eric Markell Senior Vice President Energy Resources.
GE Energy Financial Services Policy Options Shaping Private Investments in Clean Tech Kevin Walsh Managing Director, Power & Renewables May 1, 2009.
Utilities Committee Review Illinois Board of Higher Education June 5, 2007 The Energy Resources Center College of Engineering University of Illinois at.
National Capital Region Climate Change Report OVERVIEW Joan Rohlfs, Chief, Air Quality Planning Metropolitan Washington Council of Governments October.
Sacramento Local Agency Formation Commission (LAFCo) Final Environmental Impact Report Amendment of SMUD’s Sphere of Influence and SMUD Yolo Annexation.
Property Appraiser and Tax Collector Office Space Update August 5, 2014.
PowerButte: Solar Overlay Tim Snellings, Director Department of Development Services Photo courtesy of Shamim Mohamed A Place For Clean Energy.
Sustainable Port of San Diego Michelle White Green Port Program Manager.
1 Sunrise Powerlink Project Update Orange County Business Council March 10, 2009.
Utilities’ Update on Energy Savings Assistance Program Studies Ordered in D LIOB Meeting August 21, 2013 Sacramento, California.
Bridge Church Solar Team August 4 th, 2015 Bridge Church Solar PV Opportunity Analysis.
Presented to ABA RADER Committee/Columbia Law School's Environmental Law Society Symposium INTRODUCTION TO RENEWABLE ENERGY DEVELOPMENT Becky.
The Dominican Republic What can NSG do for You? 2014 Native Sun Group, Inc Meadowgrass Dr, Suite 101 Colorado Springs, CO Office: (719)
The Dominican Republic What can NSG do for You? 2014 Native Sun Group, Inc Meadowgrass Dr, Suite 101 Colorado Springs, CO Office: (719)
Napa County User Fee Study Board of Supervisors: Final Report Presentation May 12, 2009.
Canine Commons Dog Park City Council Meeting October 2, 2013 Larkspur Park & Rec Department & Public Works Department.
1 The Future of Organics Management in Palo Alto City of Palo Alto Public Works Operations March 8, 2010.
1 Energy/Compost Facility Action Plan City Council Meeting July 2, 2012.
AES HUNTINGTON BEACH ENERGY PROJECT
Federal Leadership in the Procurement of Green Power U.S. EPA Green Power Partnership Blaine Collison EPA Green Power Partnership Phone: (202)
Butte County Climate Action Plan Contract for Services December 11, 2012 Butte County Department of Development Services Tim Snellings, Director.
Power Purchase Agreements (PPA) Owner’s Perspective What is a Power Purchase Agreement? Agreement to purchase power from a third-party provider Fixed term:
STOCKTON DELTA WATER SUPPLY PROJECT (DWSP) Final Environmental Impact Report (EIR) Certification Hearing November 8, 2005 Mark J. Madison, Director Municipal.
Community Choice Aggregation Update
Solar photovoltaic (PV)
Capital Facilities Program Update San Rafael City Schools
Four Winds Condominium Association August 2, 2017
LEE FARM ADDITION – GDP AMENDMENT
The Oakton Condominium Association September 12, 2017
Water Reclamation Plant Feasibility Study Update May 28, 2014
PV SOLAR PROJECT OPPORTUNITIES
Green Energy and Green Spaces
Solar Initiative – Next Phase Opportunity
Phase 3 Solar Feasibility Study Findings and Recommendations
Civic Center Sports Field Study Session & Quarterly Update
Springbrook Estates Sewer Improvement Area Informational Meeting
City-wide LED Street Light Conversion Program
Grafton Solar Photovoltaics (PV) March 28, 2013
Water Reclamation Plant Feasibility Study Update
Joshua Basin Water District Revised Rate Recommendations
Tajiguas Resource Recovery Project Doing More with Our Waste
Photovoltaic Systems Engineering Utility Scale Development:
Acquisition Details: Owners: James E Joyce Sr. Revocable Intervivos Trust and Gloria A Joyce Revocable Intervivos Trust Location: Section 27, Town of.
Final Environmental Impact Report
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
No out of pocket cost No payback period Generate $$$ in energy savings Eliminate your electric bill Give you money annually to spend on other things.
Renewable Action Plan Update
Carlsbad and Huntington Beach Seawater Desalination Facilities
Presentation transcript:

Solar Power Project at the Sacramento Regional Wastewater Treatment Plant August 26, 2015

Background June 2014: Staff provided Board update on potential solar projects –Staff was directed to explore project alternatives December 2014: Board approved an agreement with Sage Renewables to: –Conduct Feasibility Study –Procure a Solar Contractor –Conduct CEQA –Negotiate a Power Purchase Agreement

EchoWater Project GHG mitigation EchoWater Project Final Environmental Impact Report −Includes mitigation requirement for greenhouse gas emissions −A solar energy project is an option considered to meet the mitigation requirement −Solar projects being considered are sized to fulfill the mitigation requirements over 25-year design life of system

SRWTP and energy use SRWTP is one of SMUD’s largest energy users −Annual energy costs are over $10 million Usage over 100,000,000 kwh per year −Equivalent to energy used by approximately 12,000 homes −Will increase in future due to EchoWater Projects being considered would offset approximately 7% of current usage

SRWTP property 3,500 total acres Process area 900 acres 2,600 acres of Bufferlands

Locating a solar project – Feasibility Study Key considerations: −Avoid conflicts with plant operations and construction −Minimize impacts to neighbors −Preserve Bufferlands open space areas −Cost reduction with areas most suitable for solar

Roof top solar Considered but ultimately eliminated due to cost −Existing roofs are near the mid-point of their service life −Roof replacement now or during the lifetime of the solar panels would increase cost of the systems such that they are no longer financially efficient

Solar energy – project structure Regional San would enter into a “power purchase agreement” −Purchase all energy produced −Flat rate over 25-year term −Performance guarantee for minimum level of production Solar developer would finance and own the system and be responsible for all costs and risk −Engineering, permitting, construction, operation, maintenance, decommissioning

Alternative 1 Parking Lot + North East Area

Alternative 2 Parking Lot + Misc. Process Areas + DLD 7

Alternative 3 Parking Lot + DLD 7

Alternative 4 DLD 7

Financial Summary Current annual average SMUD rate is $ per kilowatt hour

Recommended project locations: Alternative 3

Recommended project locations detail

Solar energy project benefits Estimated financial benefits −Approximately $5 million over 25-year term −Potential that financial benefit could be applied to Bufferlands restoration, sustainability and outreach efforts Environmental benefits −Clean and sustainable energy source Other benefits −Fulfill required greenhouse gas mitigation −Diversify Regional San’s green energy portfolio

Soliciting public input Held two public meetings −Invited property owners from neighborhood south of Dwight Road via direct mail (600+) −Invited large list of environmental stakeholders via −No aesthetic or visual concerns mentioned −Largest response from environmental stakeholders over impact to Bufferlands

Solar project concerns Environmental concerns –Although project is in future process area, conflict with some of the policies and objectives of the Bufferlands Master Plan Open SpaceWildlife HabitatAesthetics Management of Special Status Species Minimization of Permanent Structures

Today’s recommended actions Approve staff’s recommendation of the preferred alternative for a solar project Direct staff to begin the California Environmental Quality Act process

Questions?

Timeline Aug 2015: Begin CEQA work and develop RFP Nov 2015: Issue draft CEQA document Dec 2015: Issue RFP Feb 2016: Board approval CEQA and PPA contract Mar 2016: Solar system design May 2016: Construction Sept 2016: Interconnection, system operational

Open Space Connectivity

Environmental Stakeholders

What would a solar energy project look like? Parking canopies Fixed tilt ground mount