Drift Chamber Status Report Tokyo PHENIX Meeting.

Slides:



Advertisements
Similar presentations
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Advertisements

TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
Measuring Cosmic Ray Flux with a trigger and CAMAC readout - Page 1 Connect the Fluke 415 HV supply output to the input of the voltage distribution box.
Muon Tracking FEE R.E. Mischke Los Alamos 10 September, 1999 presentation to the PHENIX Muon Arm Technical Advisory Committee.
11/10/98Online Meeting Julia Velkovska Running and Monitoring the PHENIX Drift Chamber Julia Velkovska and Tom Hemmick.
Electronics for the INO ICAL detector B.Satyanarayana Tata Institute of Fundamental Research For INO collaboration.
Power supply cable Charge injection 3 channels readout (external cables to the scope) 3 channels readout (internal cables) Set up for reading two cards.
RPC Update José Repond Argonne National Laboratory American Working Group On Linear Collider Calorimetry 24 November 2003 What’s new since September…
CMS Tracker Week – Gantry Meeting – 21 st October 2003 – Dean White 1 Status of the UCSB Gantry Dean White University of California Santa Barbara October.
RPC Electronics Status Overall system TDC –Digitizing frequency issue (determine the bin size of the TDC value) Discriminator test result Trigger module.
D. Peterson, “Status of the Cornell/Purdue Program” TPC R&D Mini Workshop, Orsay 12-January Status of the Cornell/Purdue Program: first events with.
July 10, 2008 PHENIX RPC review C.Y. Chi 1 RPC Front End Electronics On chamber discriminator  The strips  The CMS discriminator chips  The discriminator.
Paul Rubinov TriP-t & AFEII status. AFE and CFT 9 o K VLPC (x512) AFE DISCRADC Discriminator output every 396 nsec for L1 Amplitude signal readout for.
LKr readout: present and future R. Fantechi 30/8/2012.
Linac Marx Modulator Update Trevor Butler 10/29/2014.
1 HBD Construction status Itzhak Tserruya DC meeting, BNL, February, 2006 Plans for Run-6 Box construction GEM assembly and testing Status of urgent items.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
TMDB delay and production plan Augusto. TMDB Prototype Status The prototype boards almost fully assembled should be delivered this week ( May 5 th ) First.
DC FEM FDR Charles E. Pancake Thomas K. Hemmick Julia Velkovska Vlad Pantuev.
Ivan Vitev & E906 Muon Identifier Status Patrick McGaughey and the muon radiography team E866 Meeting at FNAL June 20-21, 2007 Large Muon Tracker at LANSCE.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
RPC PAC Trigger system installation and commissioning How we make it working… On-line software Resistive Plate Chambers Link Boxes Optical Links Synchronization.
AIDA FEE64 development report August 2010 Progress after Texas CAD work Manufacturing 25th August
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
1 Online Calibration of Calorimeter Mrinmoy Bhattacharjee SUNY, Stony Brook Thanks to: D. Schamberger, L. Groer, U. Bassler, B. Olivier, M. Thioye Institutions:
HBD FEM the block diagram preamp – FEM cable Status Stuffs need to be decided….
Update on the CDC GlueX Collaboration Meeting October 2006.
The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group /TS A Collaboration.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
MuTr Shutdown Work Rusty Towell for And JUNE 22, 2004 at the Muon Physics and Forward Upgrades Workshop.
1 The PHENIX Muon Identifier Front End Electronics Andrew Glenn (University of Tennessee), for the PHENIX collaboration Andrew Glenn 5/1/01 April APS Meeting.
Mar. 18, 2009 HAPD ASIC Status Super KEKB Meeting 1 S.Nishida (KEK) S. Nishida HAPD ASIC Status Super KEKB Meeting Mar. 18, 2009 KEK.
1 October 2003Paul Dauncey1 Mechanics components will be complete by end of year To assemble ECAL, they need the VFE boards VFE boards require VFE chips.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
Performance of Programmable Logic Devices (PLDs) in read-out of high speed detectors Jack Fried INSTRUMENTATION DIVISION PLD ? PLD ? Muon Tracker PLD Muon.
SP04 Production Lev Uvarov RICE Muon Trigger Meeting August 27, 2004.
1Malcolm Ellis - Tracker Meeting - 28th November 2006 Electronics - Station Acceptance  Hardware: u 1 MICE cryostat with 1 VLPC cassette. u VME crate,
Ckov status David Lange, Doug Wright LLNL May 4, 2004.
TGC-electronics commissioning before beam collision Y. Sugaya Osaka-U アトラス総会2004 12/23 河口湖.
DAQ Subsystem Christopher Crawford University of Kentucky Robert Grzywacz University of Tennessee April DoE, Germantown MD.
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
TB Peter Glässel, Heidelberg1 TPC Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
LC Power Distribution & Pulsing Workshop, May 2011 Super-ALTRO Demonstrator Test Results LC Power Distribution & Pulsing Workshop, May nd November.
CLAS12 Drift Chamber Prototyping
HBD/TPC Electronics Status Works done to for a)Prototype detector readout b)Understand packing density and heat loading issues c)Address the overall system.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
Quality Control QC is taken very serious QC Document for Tube Production QC Document for Module Assembly QC Document for Installation.
TPC electronics Status, Plans, Needs Marcus Larwill April
HBD/TPC Electronics Status Works done to for a)Prototype detector readout b)Understand packing density and heat loading issues c)Address the overall system.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
Extended Pid in PHENIX (assembly and integration ) 7/28/03 CDR review 07/28/2003, presented by E.Kistenev.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
D0 PMG 2/3/00 PMG Agenda Feb 3, 2000  Overview u Project Manager’s Report – Tuts u Fallback options – Weerts  Silicon Support Cylinder Modifications.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
May E906 Work and Status TDC readout – One full TDC board, 4 ECL cables/modules KTEV UCLA LV PS – Thanks Dave N.! – +/- 5V, 18A each – Spade /10-12AWG.
Station-4 MuID System: Status Ming X. Liu Los Alamos National Lab 1/7/091E906 Collaboration Meeting.
ONCS Subsystem Status Chris Witzig (BNL), Stephen Pate (NMSU) DC Meeting PHENIX Collaboration Week 22-June-1998 Chain Test Software Subsystem Support Tests.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
A.Nianin1 EMCal FEM noise study Goals: develope a mechanism to compute and store cell-dependent pedestals for zero-suppression in DSP’s; study the noise.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
PHOTOTUBE SCANNING SETUP AT THE UNIVERSITY OF MARYLAND Doug Roberts U of Maryland, College Park.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
Iwaki System Readout Board User’s Guide
Mini-drawers, FE-ASIC , Integrator
RPC Front End Electronics
RPC FEE The discriminator boards TDC boards Cost schedule.
PID meeting Mechanical implementation Electronics architecture
Presentation transcript:

Drift Chamber Status Report Tokyo PHENIX Meeting

Milestones Achieved w Initial delay in start of net production; 2 weeks due to late delivery of small US made precision screws. w Middle October: 13 X-nets made and tested at PNPI: 8 excellent (<2 namp) 3 acceptable (<50 namp) 2 sparked: One stray wire strand. One poor glue application.

MECH Milestones continued w End of October: 32 UV nets made, all excellent. w Early November: Mechanical mods to the Large prototype begun. Shipped 10 wire modules (2 X, 4 U, 4 V). w Middle November: Wire modules arrive intact (no tangling) Installation complete by Thanksgiving.

New Modules Installed

Module Profile Old: UV cages “Tilt” into active volume New: UV cages flush with end

Feedthroughs

Component Overview The ASD/TMC card accepts chamber signals directly. The FEM card responds to triggers and orchestrates readout of 4 ASD/TMC cards (one “Keystone”). ASD8 = preAmp, Shaper, Discriminator (“PENN chip”) TMC = Time Memory Cell, Yasuo Arai KEK.

ASD/TMC Tests Real ASD/TMC Card Mini FEM => Logic analyzer ARCNet/Timing Emulation Box: Supplies pulses Supplies triggers Supplies ENDat’s

Noise Tests on Chamber On Chamber HV connected reads always running 3fC threshold TMC level With the scope set to 5 second persistence, we record all disc firings. No white noise! Readout noise comes from Mini-FEM

Interim Readout Solution

MECH: Since leaving for QM97 w All RC cards installed. w Pure nitrogen tests, all cages at once. w Corona at expected point. w Need one more day of turns w/ w No measurable leaks. w Vlad seems optimistic.

ELEC: Since Leaving for QM97 w A-side signal boards stuffed and tested. w ARCNet slave FPGA design complete. w We’ll write user code in ARCNet board called from hooks inside JF code (a standard option!). Otherwise too slow. Some code written. w g-2 blank FIFO card and most parts in hand. w Pre-prod proto shipped from LLNL. w Need to address: Cabling DC-DC convertor mechanical details.