VCBs are well protected with interlocking switches for its switching device operation with busbar. Switching devices in VCBs have to be disabled or enable.

Slides:



Advertisements
Similar presentations
Using three IR sensors, SensingBot can sense the front obstacles so it can avoid them. Sensing.
Advertisements

BumperBot uses two contact switches to go through a labyrinth. Bumper.
2011 MF LRG New Orleans, LA Mobile Facilities Engineering FRC Southwest, North Island Design of MF Configurations Lloyd Bjurman, Lead Pete Vicencio, Electrical.
MICE Radiation Shield Design review for the proposed ‘Direct Drive’ MICE Spectrometer Radiation Shield 17/11/2011Norbert Collomb.
Prototype Development of Automated Ring Main Unit System
Sensors For Robotics Robotics Academy All Rights Reserved.
➔ To produce self-generated decentralised energy by using simple mechanical principles. ➔ To provide a better and convenient environment for future generations.
Syringe Pumps. Topics  Diagrams  Principles of Operation  Applications  Safety  Operation  Preventive Maintenance  Common Failure Modes  Troubleshooting.
ELECTRICAL SYSTEMS 21.3.
1 CMPUT 412 Actuation Csaba Szepesvári University of Alberta TexPoint fonts used in EMF. Read the TexPoint manual before you delete this box.: AA A A A.
GO ORDNANCE !!! ORDNANCECORPS 1 Troubleshoot the DC Electrical Control System on the EPP III.
PIT Crew Design Concepts By Dan Chapman, Tim Wilson, and Jon Miller December 11, 2002.
Rollin Bicskei and Travis Haley Slab Mill. Objectives Background Mechanical – Specifications, System Diagram, CAD Hydraulic – Specifications, Schematic.
Dedicated to freshness Smeva In Focus 1.changed clear dimensions of hinged and sliding doors; 2.changed reveal profile for hinged doors; 3.changed magnetic.
VHA PANEL WITH HPA12 CIRCUIT BREAKER
Arson Robot Matt Boyden, Tim Crowley, Andrew Hollyer.
TP4-ENERSOL-TD/PV double function
ELECTRICITY GENERATION FROM SPEED BREAKER

All content in this presentation is protected – © 2008 American Power Conversion Corporation Symmetra ® LX – redundant UPS High performance, redundant.
STARTING SYSTEM.
The MICE vacuum system Presented by Mark Tucker at CM-39, 26 June 2014.
TWO WHEELER SELF SIDE STAND
Main Objective: For operator’s safety during rack-in and rack- out 11 & 33 kV VCB operations. Main Advantages: 1.Remotely controlled 2.User Friendly Operation.
Shielding the Weiner PSU 7 May 2013 Kiril Marinov ASTeC, MaRS, DL 1.
Involve to Solve Slide No. 1 Copyright © 2006 TNB Research Development of Automatic Rack-In & Rack-Out System for Vacuum Circuit Breaker Presentation on.
Pole Mounted Switch Disconnector NPS
6.11 Vocabulary Electromagnet: type of magnet in which the magnetic field is produced by a flow of electric current Core: metal (iron) center of an electromagnet.
Advanced Physical Science. Magnetism  Magnetism: The ability of some substances to attract iron, steel, and some other metals  Magnetism is a property.
P14006 Bath Tub Lift Phase V Review Amos Baptiste Jeremy Czeczulin Andrew Hughes Richard Prilenski.
© 2008 Delmar, Cengage Learning Property Security, Emergency Response, and Fire Protection Systems Chapter 13.
ET 494 Instructor: Dr. Koutsougeras By Scott Dauzat Advised by Dr. Ma.
Development of the Mechanical Battery Dept of Mechanical & Industrial Engineering, TAMUK Faculty Mentor: Dr. Larry D Peel, P.E. Students: Javier A. Lozano,
Choosing the electronics for RC planes By Rachit Aggarwal.
Electricity and Electric Circuits
Electricity and Electric Circuits
Electric Current You Light Up My Life. SC Standards PS 6-10 Compare alternating current (AC) and direct current (DC) in terms of the production of electricity.
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
What do I have to do? Cause a motor to turn the center arm. attach motor to frame can redesign the center arm piece as needed use bushings or bearings.
M.E.F. Mechanical Energy Factory Mechanical Power Converter & Re-Generator System.
Garage Doors Operators 24V DC D600 – D1000. WHY? To have a product able to compete with market leaders by design and functionality Garage doors operators.
Gates automation. Summary  Choosing the appropriate model  Faac Product Range (Sliding Gates)
Better Water Maker Mission Statement The customer will be able to access cleaner water with minimal human effort ensuring safer drinking water to third.
Electricity Notes 6 - Circuits Electric Circuit – _______________________________________ All electrical circuits have 4 parts: 1.____________________________________________________.
Arms, Legs, Wheels, Tracks, and What Really Drives Them Effectors and Actuators.
Nick Borrego Kristi Bilan T.J. Gebes Assistive Technology Fishing Device University of Wyoming Mechanical Engineering Senior Design Symposium April 2011.
1 Conductor and Insulator Warm up Will the light bulb light up if the following items are put into the electric circuit? Predict Yes or No. 1. Plastic.
© 2011 Eaton Corporation. All rights reserved. Configuring BladeUPS™
CGS Ground School Technical The Vigilant Electrical System © Crown Copyright 2012 No Part of this presentation may be reproduced without the permission.
Prototype Development of Automated Ring Main Unit System Second Technical Meeting.
Parker Hannifin Chainless Challenge 2015/2016
52 CRANKING SYSTEM CRANKING SYSTEM.
SOLAR THERMAL GENERATOR
02/24/2004.
DESCRIPTION AND GUIDE TO OPERATIONS
CLUTCHES.
Asahi/America Electric Actuators Series 94.
ARTIFICIAL GRAVITY 4/5/2017.
ARTIFICIAL GRAVITY V /5/2017.
Benefits of Using Control and Automation Panels
Automation & Security Pvt. Ltd.
MAINTENEANCE AND REPAIR OF STARTING SYSTEMS
Asahi/America Electric Actuators Series 94.
1.11: Robot Controller.
ACOE347 – Data Acquisition and Automation Systems
Chapter Twenty One: Electrical Systems
Automotive Technology Principles, Diagnosis, and Service
Horn, Wiper, and Blower Motor Circuits
Backup Power supply for Electrical substations Overview 01/2012
Dupont or Metal worn gear (optional)
Presentation transcript:

VCBs are well protected with interlocking switches for its switching device operation with busbar. Switching devices in VCBs have to be disabled or enable for raking In-Out operation for maintenance purpose. Malfunctioning of interlocking mechanism is very unlikely but if it happens the results are life threatening. There has been such failure in past and loss of life in some incidents. 1. Problem Statement PROPOSAL Automatic Rack –In & Rack-Out System for VCB

In view of the proximity of maintenance staff required for manual raking In-out of VCB carriage a motorized remotely controlled raking system is being proposed to eliminate personnel presence in vicinity of VCB during this operation. 2. The Solution

3. Design Criteria  Should be able to operate on all configuration of VCB in TNB Substations  Light Weight and independent Portable  No altercation to VCBs functioning and operation  Motorized unit with battery and charging backup  Complies with IEC/ANSI/IEEE standards  Raking In-Out time 10sec – 15sec  Ease of accessing crank nut avoiding control devices on VCB front panel

3. Mechanical fixtures and fittings (schematic 1 & 2) i) Triangular mounting frame – Aluminium alloy  ii) Magnetic legs – Steel rod with magnet with pull force 750 N or more.  iii) Sliding and rotating arm – For alignment with crank nut port  iv) Geared 24 VDC motor with encoder – 20 to 30 rpm and torque of ~250Ncm. Encoder provide distance travel by VCB.  v) Adapter shaft with crank socket - To access the crank nut

Schematic 1: Mechanical fixture and fittings VCB front Panel Triangular Frame Sliding Arm Magnetic legs Encoder DC Motor Gear Box Crank socket Crank nut Anchor bolt

Schematic 2: One possibility of triangular mounting frame

3. Electrical System and fixtures (Schematic 3)  Control of mechanical unit is achieved by wall mounted control unit  Programming Logic Controller (PLC) housed in control unit controls the operation of motor  PLC reads the motor encoder and computes the distance moved by the VCB  Interlocking functions of the systems will be provided from the PLC ladder logic programming  Battery backup and charger will be housed in control unit  The cables runs ~40m between mechanical and control units

Schematic 3: Electrical Control Unit

Schematic 4: Operation Flow diagram

4. System Specification, Testing and validation  Details provided by TNB Distribution – Handout 5. Power Failure and Safety  Control unit should be operational for four (4) hours from battery  Thirty (30) rank In-Out operation from battery  Mount or un-mount status of mechanical unit on VCB front panel 6. Material Cost i)Triangular Frame + arm+ magnetic stand RM 4000 ii)Motor + encoder + gearboxRM 2000 iii)PLC + battery + accessoriesRM 2500 iv)Cabling + connectors + socket + adaptersRM 1500 Total RM Development time  Three (3) months from after receiving the advance money

CAD design of Mechanical mounting