Page 1HMI/AIA Science Meeting – February 13, 2006 HMI Instrument Status HM/AIA Science Meeting February 13, 2006 Barbara Fischer HMI Deputy Program Manager.

Slides:



Advertisements
Similar presentations
University College London, Optical Science Laboratory bHROS Progress bench-mounted High Resolution Optical Spectrograph bHROS bHROS Progress General.
Advertisements

MMIRS 1 MMIRS MMT and Magellan Infrared Spectrograph Brian McLeod.
CMSC 2006 Orlando Active Alignment System for the LSST William J. Gressler LSST Project National Optical Astronomy Observatory (NOAO) Scott Sandwith New.
Test Cryostat, OGSE and MGSE PACS IHDR: MPE 12/13 Nov 2003 AIV1 PACS Test Cryostat, OGSE and MGSE Gerd Jakob MPE.
NGAO Instrumentation Overview September 2008 Updated Sean Adkins.
Page 1COSPAR2006-A HMI HMI Helioseismic and Magnetic Imager for the Solar Dynamics Observatory BAO – Beijing, July 2006 P.H. Scherrer, J. Todd Hoeksema.
PALM-3000 P3K Stimulus Design Update Rick Burruss P3K Team Meeting #7 February 27, 2008.
Twenty years ago IRAS gave us what is still our best view of the mid  infrared sky.
Page 1COSPAR2006-A HMI HMI Helioseismic and Magnetic Imager for the Solar Dynamics Observatory COSPAR – Beijing, July 2006 P.H. Scherrer, J. Todd.
HMI01567 – Page 1HMI Sun Test Review – November 28, 2005 HMI First Sun Test Review November 28, 2005.
1.B – Solar Dynamo 1.C – Global Circulation 1.D – Irradiance Sources 1.H – Far-side Imaging 1.F – Solar Subsurface Weather 1.E – Coronal Magnetic Field.
Page 1HMI Team Meeting – January 26, 2005 HMI Mission Operations Rock Bush HMI Stanford Program Manager Stanford University
Constellation Orion Visible Light Constellation Orion Infrared Light.
HMI01567 – Page 1HMI Sun Test Review – November 28, 2005 Sun Test Overview.
Page 1HMI/AIA Science Meeting – February 13, 2006 HMI Instrument Overview and Calibration Status HMI/AIA Science Meeting February 13, 2006 Jesper Schou.
SDW2005, juin, Taormina The Corot Space instrument.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
HMI Optics Package HMI Electronics Box The Solar Dynamics Observatory will be placed into an inclined geosynchronous orbit to maximize sunlit hours while.
Integration and Alignment of Optical Subsystem Roy W. Esplin Dave McLain.
1 Engineering the James Webb Space Telescope Paul Geithner JWST Deputy Project Manager - Technical March 26, 2011.
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
Advanced Optics Lab at San Jose State University Ramen Bahuguna Department of Physics.
MCAO Adaptive Optics Module Mechanical Design Eric James.
NIRCam ETU Testing at LMATC, Palo Alto Kailash C. Sahu.
Integral Field Spectrograph Eric PRIETO CNRS,INSU,France,Project Manager 11 November 2003.
Space-Qualified Hardware for the CALIPSO Lidar
Herschel Space ObservatoryPACS Science Verification ReviewMPE 22/23 June 2006 GJ / MPE 1 PACS Test Facility Capabilities – Cryogenics and OGSE Gerd Jakob.
Overview of STIS Repair Plans Charles R. Proffitt November 16, 2006.
Telescope Integration and Tests Tuesday Afternoon.
Page 1lOhcO 9 meeting From MDI to HMI Jesper Schou Stanford University
CDE CDR, September 14, 2004 Your Position, Your Name 1 GATS AIM Science Team Meeting January 23-24, 2007 CIPS Calibration Review, Aimee Merkel, Bill McClintock.
Opto-Mechanics for SNAP at UM
The Prime Focus Imaging Spectrograph Design and Capabilities
HMI Major Science Objectives The primary goal of the Helioseismic and Magnetic Imager (HMI) investigation is to study the origin of solar variability and.
041103_SECCHI Status.1 SECCHI Status R.A. Howard STEREO SWG 2-5 May 2005 Hamburg Planetarium.
Oct 17, 2001SALT PFIS Preliminary Design Review1 Southern African Large Telescope Prime Focus Imaging Spectrograph Mechanical Mechanism Design Michael.
GIST 24 Meeting GERB Hardware Status 14 th December 2005 Eric Sawyer.
DBSP-R Upgrade Progress Review The DBSP-R Team DBSP-R Progress Review.
Instrument Status GLM Science Team Meeting 9 September 2016 Marc Rafal/GSFC GLM Instrument Manager.
FourStar Status Eric Persson (OCIW) Presented By.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Mechanical design meeting, IAG, Calibration Unit mechanical design Svend M. Bauer Andreas Kelz, Emil Popow, Martin M. Roth.
The INS NIRCam Team.
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
PACS IBDR MPE 27/28 Feb 2002 AIV 1 PACS IBDR Test Cryostat and OGSE Gerd Jakob MPE.
STC "VOSKHOD", PROJECT "SPECTR-UV", JUNE 2006 Next slide Next slide Previous slide Possible layouts of Field Cameras.
NIRSpec - the JWST Multi-Object Spectrograph P. Ferruit (ESA), S. Arribas (CSIS), S. Birkmann (ESA), T. Böker (ESA), A. Bunker (Oxford), S. Charlot (IAP),
Laser Control Status A. Masi, T. Feniet, K. Szczurek Awake Technical Board November 12 th 2015 Thanks for inputs from: M. Donze`, V. Fedosseev, C. Hessler.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
Status of the SWAP instrument
Rose Navarro HMI Lead Thermal Engineer
Bill Raynor Naval Research Lab
Wide-Field Imager for Solar PRobe Plus (WISPR)
Solar-B Science Working Group
Dave McComas on behalf of the ISʘIS Team
Testing and Calibration at IHEP for eXTP (current plans and needed facilities) YuSa Wang
HMI Status P. Scherrer.
0.0 Instrument Suite Name Presenter’s name
HMI Systems Engineering
Dave Akin, Lockheed Martin
Image Stabilization System (ISS)
Jesper Schou Instrument Scientist
Integration, Test, and Verification
HMI First Sun Test Review December 2, 2005
HMI Reliability Dale Wolfe Reliability Engineer LMSSC*ATC*LMSAL
Launch and On-orbit Checkout
FourStar 4K x 4K JHK imager
SDO Integration and Test (I&T) Subsystem Mission PDR
Optics Alan Title, HMI-LMSAL Lead,
Instrument Overview Larry Springer HMI Program Manager
Presentation transcript:

Page 1HMI/AIA Science Meeting – February 13, 2006 HMI Instrument Status HM/AIA Science Meeting February 13, 2006 Barbara Fischer HMI Deputy Program Manager LMSSC*ATC*LMSAL

Page 2HMI/AIA Science Meeting – February 13, 2006 Outline A year in the life of HMI development –HMI assembly progress –HMI testing progress Near term events Schedule summary The last time we met, we had finished CDR and were starting structural model testing.

Page 3HMI/AIA Science Meeting – February 13, 2006 HMI Assembly Status Structural model testing completed ETU oven testing completed BB HEB fabrication completed SUROM acceptance test completed mission CDR Received flight Michelsons All flight optics in house Received flight metering tube Completed telescope alignment Received flight structure Start alignment on GSE bench Hollow core motors completed Received DM cameras Received 4 grade zero CCDs Alignment mechanism completed Started optical alignment of HOP BB HEB and EGSE ready Shutter & F/C wheels completed Internal harness completed Lyot completed Internal mechanisms tested Focal plane completed Oven completed First image

Page 4HMI/AIA Science Meeting – February 13, 2006 HMI Assembly Status Optics Package Assembly Detector Assembly (Non-Flight) CEB (Non-Flight, DM1) Flex-Cables (Eng Model) Telescope (Flight) Front Window (Flight) Primary work after Sun testing: Bond optics in place Replace painted parts (including the oven) Replace one HCM and focus/cal optical mounts ISS Mirror (Flight) Polarization Selector (Flight) Focus/Cal Wheels (Flight) Limb Sensor (Non-Flight) ISS Beam Splitter (Flight) Oven Assembly (non-flight) Parts to replace: E1 and E2 in Lyot NB Michelson Painted housing BDS Beamsplitter (Flight, hidden by shutter) Shutters (Flight) BDS Fold Mirror (Flight) CCD Fold Mirror (Flight, hidden by detector) Alignment Mechanism (Flight, hidden in view) Internal Harness (Flight, not complete) Limb Pre-amp Box (Flight, not complete) Structure W/ legs and heaters (Flight) Oven Controller (ETU)

Page 5HMI/AIA Science Meeting – February 13, 2006 HMI Testing Progress 12/22/06 02/01/06 01/30/06 01/25/06 01/11/06 Tests Performed: Initial set up w/ lamp Focus test w/ lamp Distortion, field curvature and MTF w/ lamp Focus test w/ Sun Filter wavelength dependence w/ Sun Filter wavelength dependence w/ laser Field curvature and MTF w/ Sun Polarization calibration w/ Sun Tests In Progress: Laser dot Before holiday No relay lens No Lyot No frt Window Special target Lamp - stim tel Lyot installed Temp mnt for relay lens Not fully aligned stim tel Air Force target Lamp - stim tel All together Laser intensity improved “HMI is Alive” First Image “Special Target” First Lamp Image “Ready to Test” Instrument All Together “No More Moon” Better Laser Image “It’s a Beautiful Day” First Sun Image Just sunlight With air/vac corrector

Page 6HMI/AIA Science Meeting – February 13, 2006 HMI Testing Progress First Magnetogram First Dopplergram

Page 7HMI/AIA Science Meeting – February 13, 2006 Upcoming Events Near term key hardware items –Continue Sun testing –Continue ISS testing –Complete rebuild of oven Replace Lyot E1 and E2 Replace narrow band Michelson –Replace one wave plate mount and focus block mounts –Bond optics in mounts –Install flight focal planes and align CCDs Further out –In air calibrationMid April – May –Vacuum calibrationJune – mid July

Page 8HMI/AIA Science Meeting – February 13, 2006 Schedule Summary Complete initial testingFeb 06 Complete instrument integrationApril 06 –Except flight camera electronics box Pre-Environmental ReviewApril 06 Instrument calibrationApril – July 06 –In airApril – May 06 Need brassboard camera interface board Use demonstration camera electronics box –In vacuumJune – July 06 Mid-stream install flight camera electronics box HOP vibration & acoustic testJuly 06 Comprehensive performance test Aug 06 –With flight HMI electronics box Instrument EMI/EMC testSept 06 HMI electronics box vibration testOct 06 Thermal vacuum cycling and balance testNov – Dec 06 Comprehensive performance test Dec 06 Alignment with instrument module panelJan 07 Pre-Ship ReviewJan 07 Ship to GoddardFeb 07