Learning, Health, and Safety Capital Project Alternates and Change Order 11-28-11.

Slides:



Advertisements
Similar presentations
Wendover Renovation Presentation Presentation Overview Renovation Stages Before Now After How you will be affected Questions/Concerns.
Advertisements

March 11, 2013 By Fred J. Hofman Superintendent/Principal Harrison Public Schools.
Crescent Academy International
CURRENT WORK West Wing - Exterior: Masonry and shingles finished, fascia and soffit work ongoing - 1 st Floor: Final coat of paint, casework installed,
Addressing Highest Priority Facility Needs
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
FAIR LAWN BOARD OF EDUCATION BUILDINGS & GROUNDS ACCOMPLISHMENTS BUILDINGS & GROUNDS ACCOMPLISHMENTS.
Front view of coach house (photographer facing west) Front view of coach house (facing north-west)Side view of coach house (facing south) Rear view of.
Bolinas Marine Laboratory Facility Project Background and Existing Conditions Review.
NEW PALTZ CENTRAL SCHOOL DISTRICT Comprehensive Facilities Master Plan – Progress Report Summary.
How to get from the Nebraska Parking lot to the Mary Graydon Center.
Upper Level Copy Room Office Sanctuary Pastor’s Study To Epworth House Kitchen-Acolyte Lobby Courtyard Wesley Room Prayer Room Janitor Storage Nursery.
Current Project Update October 25th 2012 Good Evening!!!
Finance and Facilities. DuPage County, IL EAV Growth History (Five Year Average: -2.15%)
Welcome to the CY Middle School virtual tour! Click here for pictures of the main floor. Click here for pictures of the second floor.
Campus signage – Internal
To Find and Open Your Locker.  Your locker will either be in the Upper A Hallway or the D Building Hallway.
September 21 Update. Future Main Entrance (looking south)
MONSON TOWN HALL / MONSON POLICE BUILDING UPDATE 5/21/2014.
UPSTAIRS DOWNTOWN North Walnut Case Study for Reuse Anna Margaret Barris Project Designer Illinois Historic Preservation Agency.
Facilities Update Site Improvements Encinitas Union School District September 5, 2006.
BOND 2013 Election Day November 5th. SMART School BOND 2013 November 5 th Ballot Proposal Bond proposal for facility & site improvements to address student.
Glenvar High School Renovations School Board Presentation
SCHEMATIC DESIGN PRESENTATION
MCPS MAINTENANCE AND CAPITAL IMPROVEMENTS 2015 – 2016 BUDGET.
WISH LISTS. GHS Install building wide phone system w/voic Remodel Office area w/AC Enlarge parking lot near LC Replace asbestos floor tile Pave gravel.
TAKE EXIT 38 FROM I-84 Westbound TAKE EXIT 39 FROM I-84 Eastbound.
Riverside Community Schools Overview of Summer Maintenance Projects.
S.M.A.R.T. Project Proposal December 9, 2014 Referendum.
Northwest ISD Lakeview Elementary School Additions and Renovations Lakeview Elementary School Additions and Renovations
Trinity Lutheran Church Major Maintenance Tuesday, February 17, 2015.
Frank c. havens elementary school CONCEPT DESIGN II Refinement of hybrid October 24, 2007 R. P. Gallagher Associates Structural Engineers.
Property: Block of Norzagaray-San Justo-San Sebastian Exact address: #251 Calle San Sebastian Viejo San Juan, PR.
Bond Expenditure Report Per A.R.S. § (K) 7/1/13 - 6/30/14.
Lincoln Consolidated Schools Citizens Steering Committee Bond Issue Final Recommendation Board of Education Meeting October 18, :00 p.m.
CHS Emergency Evacuation Plan Faculty and Staff Overview.
ENERGY EFFICIENT HOUSE DESIGN UDC, Van Ness Campus Student Architects: Sarah Alexander and Roberto Martin.
Casey Middle School Boulder, Colorado Middle School, Unbuilt Category RB+B Architects, Inc Exhibition of School Planning and Architecture.
This question speaks to primary ownership of the room décor. Will the space be designed for contemporary worship that youth will be allowed to occupy.
Phase III Design Development Finalization December 23, 2008 apcosigns.com.
Houston TranStar Building Expansion 2009 Status. Aerial of Existing Building.
New Fabra Elementary School Design Presentation. Play Field Playground Bus Loop Staff Parking Parent Drop-off Parking Johns Rd. Lattimore Blvd. Secure.
Deerfield Elementary School Deerfield Elementary Overview of Deerfield Renovation October 8, 2015.
SUMMER 2015 DEFERRED MAINTENANCE
Fire Safety By Alicia Civile and Alexandra Fernandez ASSIGNMENT 4.
Projection, Distortion, Map Quadrants & Sandalwood Map Learning Objectives – Student understands map projection & distortion – Student understands map.
Park Side Elementary West Side Elementary Marshall Middle School Marshall High School Proposed Security/Safety Improvements.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
White Pigeon Community Schools
2015 School Bond Construction Program
Cornwall Central School District
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Main entrance To the hall.
Penn Medicine Chester County Hospital
Capital Improvements Presentation
Dr. Joseph Meloche Superintendent of Schools Mrs
Sneed Property th Ave E, Puyallup Exterior of House
The summer of 2018 and all the work that has taken place
Troy School District Bond Program – Series 1 Construction Update
2007 Bond Issue Capital Improvement Program
Building & Property Committee
Troy School District Bond Program – Series Construction Update
PROPOSED FACILITIES REFERENDUM
Recent Bond Accomplishments
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
WES Renovation Update Photo Gallery
N Learning Resources Center To Sim Lab Interior--- Office 115 ELEVATOR
EAST PENNSBORO AREA SCHOOL DISTRICT
A. Write the correct numbers !
ROOM OUTLINE FOR NORTH AND SOUTH WINGS
Presentation transcript:

Learning, Health, and Safety Capital Project Alternates and Change Order

Alternates and Change Order Summary ItemTitleCost 1Ceiling30,000 2Security Cameras43,000 3Message Center64,000 4Emergency Gen25,000 Total162,000 2

1. Ceiling Replacement Main corridor down to gym and down hallway to ‘97 wing Rear stairwell near art room Rear stairwell by new emergency exit landing Cost: $30,000 3

2 – Security Cameras Currently: two exterior and four interior cameras in MS & HS, three interior and three exterior at ES High School Interior 1.Middle school ramp facing exterior doors 2.Main entrance display cases facing exit doors 3.‘97 corridor outside team rooms facing entrance and intersection 4.‘97 wing southern exit facing exit and stairs on first floor Exterior 1.Corner of pool building facing bus loop entrance 2.Corner of rear of building facing loading dock 4

2 – Security Cameras Middle School Interior 1.Main entry facing entrance 2.Chorus entrance and corridor 3.Café Parent pickup door entrance 4.Second floor hallway facing bathroom, intersection and stairwell Exterior 1.Café Loop 2.Café Front Bus Loop 5

2 – Security Cameras Elementary School Interior 1.Main entrance facing entrance doors 2.Side Canopy entrance facing entrance doors 3.Loading dock doors facing doors Exterior 1.Outside library facing loop 2.K playground 3.Upper playground 6

2 – Security Cameras High School Alternates Interior 1.Outside of band and choral rooms facing west exit 2.Outside 106 facing north down the business hallway picking up intersection 3.Main hallway outside aquatics office facing toward gym includes bathroom 4.Main hallway at end of hallway by gym facing bathroom exit and east down hall 5.Gym hallway east doors facing west toward AD office picking up locker room entrance and hallway 6.Pool upper corner 7

2 – Security Cameras High School Alternates Exterior 1.South West corner of library facing loop exit 2.‘97 wing facing back parking lot and nature trail exteriro gym doors 3.‘97 facing elementary path 8

2 – Security Cameras Middle School Alternates Interior 1.Café stairwell first floor facing entrance and main office hallway 2.PLTW, afterschool LGI and locker room 3.PLTW side entrance facing entrance 4.Second floor 6 th grade hallway stairwells – one at each end Exterior 1.Rear parking lot facing playground 2.Courtyard by library 3.Main Entry canopy facing bus loop east 9

2 – Security Cameras Elementary School Alternates Interior 1.DO facing DO entrance doors and partial hallway Exterior 1.South west corner facing large parking lot 2.DO parking lot 10

2 – Security Cameras Cost: $43,000 11

3 – Outdoor Message Center All labor and materials Full color Computerized scrolling display Programmable Cost: $64,000 12

4 - Change Order Emergency Generator tied with NOC & Kitchen Will allow computer networks and the kitchen to operate with power from the generator Change orders greater than $15,000 require BOE approval Cost: $25,000 13

Alternates and Change Order Summary ItemTitleCost 1Ceiling30,000 2Security Cameras43,000 3Message Center64,000 4Emergency Gen25,000 Total162,000 14

Next Steps Financial Review and Analysis Quote Acquisition Design of Emergency Gen Change Order Board Approval of Bids and Quotes on December 12, 2011 Work commences thereafter 15