WMO Contributions to TWS I.WMO's GTS support to TWS II.Support of Regional Warning Centers III.IOC/WMO/ISDR Assessments IV.Multi-hazard approach to ocean-related.

Slides:



Advertisements
Similar presentations
Role of WMO in Natural Disaster Risk Reduction Ivan Obrusník, Czech Hydrometeorological Institute Role of WMO in Natural Disaster Risk Reduction Ivan Obrusník,
Advertisements

The Caribbean Customs Law Enforcement Council
World Meteorological Organization Working together in weather, climate and water Report by the President of RA IV EC – LXII Doc 2.4 WMO.
World Meteorological Organization Working together in weather, climate and water EXPECTED RESULT 1 ENHANCED CAPABILITIES OF MEMBERS TO PRODUCE BETTER WEATHER.
Taking the pulse of the planet Viability of a Multi Hazard Approach to a Regional Center in support of building an end-to-end Indian Ocean Tsunami Warning.
WMO’s Activities in Disaster Risk Reduction
1 Operational Meteorology for Natural Disaster Prevention and Mitigation Alexander Gusev Acting President of the WMO Commission for Basic Systems.
1 World Meteorological Organization TCP Activities in support of DPM Programme Koji Kuroiwa Tropical Cyclone Programme.
RTH AND NMC FUNCTIONS FOR GTS INFORMATION EXCHANGE T.K.RAY RTH,NEW DELHI,INDIA E Training Seminar on information and communication.
World Meteorological Organization Working together in weather, climate and water Cg-XVI / Doc. 2.4 Geneva, 16 May to 3 June 2011 Report by the President.
World Meteorological Organization Working together in weather, climate and water Report by the president of RA IV (North America, Central America and the.
WMO WIGOS in support of DRR 2013 Coordination Meeting of DRR FP October 2013, Geneva Dr S. Barrell, Chair, ICG-WIGOS Dr I. Zahumensky, WIGOS-PO.
WMO Competency Standards: Development and Implementation Status
EMERGENCY ALERTING POLICY WORKSHOP Haleh Kootval Chief, Public Weather Services WMO Montreal, Canada, 1-2 May 2012.
DATA COLLECTION, STORAGE AND EXCHANGE UNDER THE AUSPICES OF THE WORLD METEOROLOGICAL ORGANIZATION Geoff Love vice president, WMO’s Commission for Basic.
Oceans in the UN and international arena The role of WMO WSIS, Geneva, 10 June
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO The Sixth Session of Regional Conference RA II-WG-IT-TT,
World Meteorological Organization Working together in weather, climate and water Maritime Safety Services Zagreb, May 2012 WMO.
World Meteorological Organization Working together in weather, climate and water Key issues in ocean and marine related Early Warning Systems in Asia B.Y.
World Meteorological Organization Working together in weather, climate and water Adaptation to Climate Change Impacts on Coastal Communities M.V.K. Sivakumar.
Recent developments in the UNFCCC process in relation to global observations 4 th GTOS Steering Committee Paris, 1-2 December 2009 Rocio Lichte Programme.
Team Leader- Hydrology
Proposed Road Map for the Development of Caribbean Regional Cooperation Programme in Multi- Hazard EWS Follow up to the “Training Workshop on Multi-Hazard.
Towards a Tsunami Warning and Mitigation System in the Indian Ocean IOC of UNESCO.
Tsunami Warning and Mitigation System Masahiro Yamamoto Tsunami Unit Intergovernmental Oceanographic Commission (IOC) UNESCO.
NOAA’s Role in Weather Forecasting and Community Preparedness Decision Support NOAA remains focused on supporting high impact events where weather is a.
DI Promote the cooperation of national and international agencies towards a multi-hazard approach to address more effectively and systematically.
Climate Change Programme in the Caribbean Climate Change and the Role of Regions Open Days 2008 Carlos Fuller Deputy Director.
The WMO Information System (WIS)
Joint WMO-IOC Technical Commission for Oceanography and Marine Meteorology Contributions to WIGOS David Meldrum, vice chair, JCOMM OPA.
GEO Tsunami Working Group meeting 22 June 2006, Paris 1 Tsunami WG meeting 22June 2007 G. Rum GEO Secretariat.
Symposium on multi-hazard early warning systems for integrated disaster risk management A JCOMM perspective Enhanced early warning for better coastal or.
United States of America8 Dec 2009, GenèveSAP Workshop for WMO FFI Forecasting in the USA The National Weather Service River Forecast System (NWSRFS),
WMO, third Meeting of the RA VI Management Group, 9-10 April 2015, Istanbul, Turkey Working group climate and hydrology Ernesto Rodriguez Camino and Dominique.
Flash Flood Forecasting as an Element of Multi-Hazard Warning Systems Wolfgang E. Grabs Chief, Water Resources Division WMO.
WMO OMM For (TBC) 1 E.B Manaenkova / C. Blondin TC-42 Singapore, January nd IBTrACS Workshop, Honolulu US, April 2011 Overview of the Tropical Cyclone.
Workshop on the Strategy and Action Plan of the WMO Flood Forecasting Initiative WMO Headquarters Geneva, 08 – 10 December 2009 INTRODUCTION TO THE WORKSHOP.
NOAA NWS Telecoms Report & WMO CBS Issues APSDEU-10 BoM - Melbourne, AU Feb 2010 Fred Branski, Intl Requirements and Data Liaison Office of the Chief Information.
1 World Meteorological Organization WMO Information System (WIS) Managing & Moving Weather, Water and Climate Information in the 21 st Century WORLD METEOROLOGICAL.
WMO OMM For (TBC) 1 E.B Manaenkova / C. Blondin TC-42 Singapore, January 2010 TLFDP_Shanghai_June2012 World Meteorological Organization Working together.
Training Seminar on ICT for GTS (Bangkok, September 2002) - Slide 1 Organisation principles of the GTS.
Contributions of CIMO to Standards for Hazard Monitoring, Data, Metadata and Analysis to Support Risk Assessment (session 4) First Technical Workshop on.
Name: Stanley Phillips Title: Customs Management Trainer Coordinator Company Name: Caribbean Customs Law Enforcement Council (CCLEC)
Progress in Coordination of regional Tsunami Warning Systems EC Info-Day on Tsunami Early Warning Systems Paris, 31 January 2006 Patricio Bernal, UNESCO.
WMO and Public Warning presented 9 December, 2008 at the “CAP Implementers Workshop" WMO Secretariat, Geneva by Jean-Michel Rainer, Director WMO Information.
Round Table: Future challenges for PANDRH CARICOM Perspective.
Terena Networking Conference, , Prague examine the performance and delay of 430 tsunami warning stations SEA LEVEL STATION MONITORING FACILITY.
Report by the President
Implementing the New JCOMM Marine Climate Data System (MCDS)
Outcome of the ET-CTS Meeting (Toulouse, May 2008)
WMO Global Meteo Alarm System (GMAS)
IMO/IHO World-Wide Navigational Warning Service
Severe Weather Forecasting Demonstration Project (SWFDP) Bay of Bengal
CAP Implementation Workshop 2017
West Africa Regional Work Plan Example
CREWS West Africa Regional Work Plan
The Caribbean.
SFSPA and OPA Document No. 4
JCOMM Activities in support of DPM Programme
Discussions support slides
TROPICAL CYCLONE FORECASTING Director, WDS Department
Contributions to WIGOS David Meldrum, vice chair, JCOMM OCG
IMO/IHO World-Wide Navigational Warning Service
Flood Forecasting Initiative
Discussions support slides
Support for SOT Activities
Progress report CREWS STEERING COMMITTEE 7 November 2017
Status of Existing Observing Networks
Regional WIGOS Centre Plans of India
Topic 2 – Reform Documents 4(4) and 4(5)(Cg-18)
Presentation transcript:

WMO Contributions to TWS I.WMO's GTS support to TWS II.Support of Regional Warning Centers III.IOC/WMO/ISDR Assessments IV.Multi-hazard approach to ocean-related early warning systems

How Does the Global Operational Network of WMO Operate? NMHSs deliver data and early warning services 3 World Meteorological Centres 40 Regional Specialized Centers NMHSs of 187 countries contribute to Global Observing System every day Global Telecommunication System- 32 Regional Tele-communication Hubs

WMO Global Telecommunication System (GTS), linking National Meteorological Services of 187 countries and territories, has been established as the backbone for exchange of natural hazards related information and warnings, including tsunami (e.g.Pacific, Indian Ocean).

GTS/Regional Meteorological Telecommunication Network for Region IV (North and Central America) point-to-point and multipoint circuits implementation (kbit/s) Honolulu Havana Kingston Curaçao Aruba Port au Prince RSMC Montreal Bracknell WMC Washington Guadeloupe Martinique Grenada Port of Spain Tegucigalpa Belize San Jose Panama Managua San Salvador GuatemalaMexico S. Domingo Nassau St MaartenSan JuanAntiguaSt Lucia Cayenne Georgetown St Vincent Dominica Anguilla St Kitts Tortola Gd Cayman Bermuda RSMC Miami Montserrat Barbados RTH NMC Centre in other region MTN circuit Interregional circuit Regional circuit Regional multipoint circuit via satellite (VSAT) 64 kb/s Rec & 4 kb/s Trans Buenos Aires Brasilia Tokyo Pretoria 64 Bogota IMTN FR 1.5M (CIR:32/768) Melbourne IMTN FR 256 (CIR:16/32) Turks & Caicos EMWIN Receiver AFTN-Met-ATC 64 AFTN circuit 64

–Use of WMO/GTS links and routeing –Use of WMO/GTS satellite-based data distribution systems, including : ISCS and EMWIN, also EUMETCast (Eastern Carribean) –Adoption of special GTS message headers for watch and warnings ensuring highest priority routeing (2 min end-to-end), and acknowledgment procedures –Adoption of WMO data representation form (CREX) and unified GTS message headers for sea-level data facilitating collection and exchange via the GTS GTS technical arrangements to distribute TWS messages to NMHSs:

WMO Contributions to TWS I.WMO's GTS support to IO-TWS II.Support of Regional Warning Centers III.IOC/WMO/ISDR Assessments IV.Multi-hazard approach to ocean-related early warning systems

WMO’s unique experience in Operational Requirements of Regional Warning Centers Multi-Hazard Early Warning Centres: Concept of Operations on: Multi-Hazard Early Warning Centres: Concept of Operations on: Organizational arrangements, Organizational arrangements, Operations and Procedures, Standards, Operations and Procedures, Standards, Communications, Communications, Output coordination, Output coordination, International collaboration International collaboration WMO has shared its operational manuals and accreditation process for regional centres with IOC WMO has shared its operational manuals and accreditation process for regional centres with IOC

WMO Contributions to TWS I.WMO's GTS support to IO-TWS II.Support of Regional Warning Centers III.IOC/WMO/ISDR Assessments IV.Multi-hazard approach to ocean-related early warning systems

IOC/WMO/ISDR Assessment Missions Mission Objective: Mission Objective: – To identify current capabilities, gaps, needs and problem areas wrt TWS IOC/WMO/ISDR missions were held in IO IOC/WMO/ISDR missions were held in IO – A questionnaire was circulated among NMHSs to determine needs prior to the missions Analyses leading to projects addressing gaps and needs Analyses leading to projects addressing gaps and needs

WMO Contributions to TWS I.WMO's GTS support to IO-TWS II.Support of Regional Warning Centers III.IOC/WMO/ISDR Assessments IV.Multi-hazard approach to ocean-related early warning systems

WMO’s Role related to EWS for Ocean-related Hazards Tropical cyclones and associated phenomena such as storm surgeTropical cyclones and associated phenomena such as storm surge High sea and swell (Extreme Waves)High sea and swell (Extreme Waves) WMO through the NMHSs has operational EWS responsibility for Tropical Cyclones, Storm Surges and High Seas and Swell warnings.

WMO’s Global Tropical Cyclone Early Warning System 6 Regional Centres designated by WMO to provide advisories for countries in region 6 regional tropical cyclone committees

Wave and Storm Surge Warnings Joint Commission on Oceanography and Marine Meteorology (WMO/IOC) Technical guidelines –Wind waves and storm surge forecasting –Regional approaches –Capacity building

Warnings for Enhanced Coastal Risk Management Enhanced technical capacities linking tropical cyclones, storm surges and coastal flooding forecasts and warnings –Interdisciplinary methodologies and models –WMO Tropical Cyclone, Marine Meteorology and Oceanography and Hydrology programmes –Role of JCOMM and other key WMO Technical Commissions (Basic Systems and Hydrology)

IOC – Ad Hoc Working Group on the Framework for a Global Tsunami and other Ocean-Related Hazards Early Warning System Resolution: XXIII-15 ToR: To address global issues common to four ICGs related to tsunami and ocean-related hazard warning systems First meeting: at IOC EC-39 (24 June 2006) Second meeting: at Bonn (6 February 2007) Expected Outcome: Develop technical guidance for governments for pursuit of ocean-related hazards – Framework document to be presented in the forthcoming IOC Assembly (June 2007) WMO will support the IOC-Ad Hoc Working related to ocean-hazards under its mandate.

Utilization of Space-based Data and Services for TEWS Goals:Goals: - Use of WMO Space Programme in TWS - Increased capacity of NMHSs to utilize satellite services Partners:Partners: - International space agencies and key national agencies Actions:Actions: - Educational and users workshops