Small Cost – Big Impact: Lessons in Low-Cost Safety Improvements Gustave Scheerbaum, PE Complete Streets Safety Engineer ARLE Grant Programs Manager City.

Slides:



Advertisements
Similar presentations
1 ODOTs Complete Streets Initiative. 2 Tipping Point for Complete Streets.
Advertisements

Complete Street Analysis of a Road Diet Orange Grove Boulevard Pasadena, CA Aaron Elias Engineering Associate Kittelson & Associates Bill Cisco Senior.
Presented by Nazir Lalani P.E TRAFFIC SAFETY EVALUATIONS (Pedestrians and Bicyclists)
Who we are these people? Gabriela Vega – Transportation Planner, DDOT/PPSA George Branyan – Pedestrian Program Coordinator, DDOT/PPSA Trey Dickerson –
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
Sharing the Road Look for Motorcycles Motorcycles Motorcycles have the same privileges as other vehicles on the road. The chances of being involved.
Comprehensive Pedestrian Enforcement Captain Thomas C. Didone Montgomery County, MD Police Department 1.
How did the Bicyclist Cross the Road? By: Mike Hendrix, PE, PTOEDate: June 26, 2012 A Case Study of Two Intersections in Seattle.
Publication No. FHWA-HRT Federal Highway Administration University Course on Bicycle and Pedestrian Transportation International Approaches to Bicycle.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Safety at Signalized Intersections. Signalized Intersections FHWA Safety Focus Areas 2.
Pedestrian Safety Master Plan. This Presentation Similarities and Differences with Other Areas No Magic Bullet Site, Corridor Specific Multiple, Complementary.
Dowling Associates, Inc. Combining Pedestrian Plans & ADA Transition Plans Combining Pedestrian Plans and ADA Transition Plans Gail Payne Dowling Associates,
Ed Cox City of Sacramento, Department of Public Works Bicycle Solutions in Sacramento.
May 14, st Street and 2 nd Street Couplet Traffic Modification Project.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Sidewalk Bikeways: A Safety Problem, Not a Safety Solution.
Florida Department of Transportation, November 2009
How Walkable and Bike-able Is UCLA ? Multi-Modal Level Of Service Analysis in the UCLA Campus HYERAN LEE CLASS OF 2014 MASTER OF URBAN AND REGIONAL PLANNING.
INDONESIA INFRASTRUCTURE INITIATIVE A Safe System Supporting Vulnerable Road Users Dr Dale Andrea VicRoads International.
6 th Street (Junipero to Bellflower) Bike Boulevard Design Concepts March 2012.
DEPARTMENT OF TRANSPORTATION. Mission Statement Plan, Design, Construct, Operate and Maintain the roadway system under the jurisdiction of Lee County.
Oregon Pedestrian and Bicycle Safety Implementation Plan.
Fundamental Methods for Building More Walkable Communities Mark Fenton Pedestrian and Bicycle Information Center University of North Carolina.
Bicyclist and Pedestrian Behavior in Mexico City and Los Angeles May 12, 2014 source: portlandmercury.comsource: bklynbrokenwindow.blogspot.comsource:
Maintenance and Protection of Traffic (MPT) – HDM Ch 16.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Shared Roadways Lesson 14 (This picture shows bicyclists not.
Evaluation of Pedestrian Safety Countermeasures—Summary of Results, Conclusions and Lessons Learned Peyton McLeod Sprinkle Consulting, Inc. Kelley Klaver.
Traffic Calming and Fire / EMS Department Emergency Responses Lee Havens, Fire Chief Jonathan Bigony, President Pete Mellits, P.E. / Fire Chief ( )
School travel planning an engineer will love. School travel in Moonee Valley Need: A more planned and coordinated approach to active travel program delivery.
8-1 LOW COST SAFETY IMPROVEMENTS The Tools – Traffic Signals – Session #8.
Traffic Engineering Division Traffic Operations Traffic Administration Construction and maintenance of traffic control devices. Engineering design Signal.
ROUNDABOUTS Improving Safety and Efficiency The Ohio Department of Transportation District Clark Ave. Ashland, OH Julie Cichello, P.E. District.
Chicago Department of Transportation Bobby L. Ware, Commissioner Richard M. Daley, Mayor Metropolitan Planning Council November 3,
9 TH STREET IMPROVEMENT PLAN Corvallis Area Metropolitan Planning Organization (CAMPO) Ali Bonakdar.
Presentation Outline  Recommendation  Project Background  Public Involvement  Proposed Design  Citizen Comments/Questions  Summary and Recommendation.
Roundabouts: A Safer Choice. What is a roundabout? A roundabout is a type of circular intersection with yield control of entering traffic, islands on.
Public Safety Committee September 28, 2015 David O. Brown Chief Of Police Pedestrian Safety.
Presentation title | Date. Who We Are Building a Healthier Heartland (BHH)  Super-coalition of local and national partners that promotes policy, systems.
Complete Streets Michigan’s Approach Mark A. Van Port Fleet AASHTO SCOD Annual Meeting July 15, 2008.
1/23/20161 Traffic Calming Devices Workshop Prepared by City Engineering Department.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
October 15 th, 2013 The City of Akron SUM – Exchange Street / Cedar Street Corridor Safety Study.
At-Grade Intersection Design
Traffic Signs Part Two. What do these 2 signs tell you?
TRB Update AASHTO SCOHTS Annual Meeting April 2016.
Martin J. Walsh Mayor Michael Dennehy Commissioner Public Hearing January 20, 2015.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
University Drive Road Diet September 8, Goals and Objectives A. Reduce vehicular speed in the corridor. B. Provide an attractive bicycle accommodation.
Complete Streets Training Module 4b – Designing for All Users.
Bicycle Safety Countermeasures Module 4.
Saving the King Street Bicycle Boulevard
ROUNDABOUTING WHAT YOU NEED TO KNOW
Geo Targeted Mobile Advertising
Interdisciplinary teams Existing or new roadway
CHAPTER 3 Signs, Signals, and Pavement Markings
Beachside Traffic/Crosswalk Update
Highway Safety Team Staff Meeting SMART Portal HSIP Application Demonstration Systemic Safety Improvement (SSI) November 21,2017.
Midblock Crossings Lesson 12 Publication No. FHWA-HRT
Moving Maryland Toward Zero Deaths
ROUNDABOUTS Improving Safety and Efficiency
Nancy Pullen-Seufert ADTSEA Conference, July 23, 2018
City of Wilmington Bike Plan Update
Developing a Pedestrian -Bicycle Safety Action Plan
Safety Audit Components
Protected Bicycle Lanes Finally Pedal Their Way to KC…
Design Standards.
Alex Henry FDOT District Seven Safety Office
Project Location: 35th Ave HSIP8
Module 6 A 21st Century Transportation Network
Presentation transcript:

Small Cost – Big Impact: Lessons in Low-Cost Safety Improvements Gustave Scheerbaum, PE Complete Streets Safety Engineer ARLE Grant Programs Manager City of Philadelphia Mayor’s Office of Transportation &

Automated Red-Light Enforcement (ARLE) Funding 1.Must be used for Transportation Safety Improvements 2.Lots of potential locations for improvements 3.A project’s funding must be used within 3 years – concept to construction 4.Funding may not be used for maintenance 5.Resources are limited 2

Historic Approach 3

The Result ~35,000 annual traffic deaths nationally ~1,265 annual traffic deaths in PA ~156 annual pedestrian deaths in PA 97 traffic deaths in Philadelphia in Philadelphia pedestrian deaths in

Disproportionate Impacts Pedestrians, Bicyclists, and Motorcyclists are disproportionally killed and severely injured relative to mode share. 5

Crash Reduction Factors Crash reduction factor (CRF) is the percentage crash reduction that might be expected after implementing a given countermeasure. 6

Pedestrian Countdown Signals Pedestrian countdown signals (CRF ≈ 25%) Seventy nine intersections were updated with countdowns with $230K ARLE program budget. 7

Updated Pavement Markings Use of Sharrows Bike Box installation (CRF ≈ 36%) Two-stage Left 12’ stop bar setbacks (CRF ≈ 18%) 8

Street Lighting Improved Street Lighting – HPS to LED fixtures (CRF ≈ 25%) LED Lighting – Market St BEFORE – Spruce St AFTER – Spruce St 9

Concentration on Pedestrians & Bicycles A number of relatively low-cost-safety traffic engineering countermeasures geared towards pedestrian and bicycle safety have been shown to reduce crashes for all users. Spruce Pine Right Sizing (Bike Lanes) Project (CRF = 30%) 10

New Approach 11

Low Cost Safety has Wider Impacts Due to the nature of low-cost-safety countermeasures, such interventions can be implemented more widely based on the total funding available for each program. The costs below indicate the approximate implementation cost per location. o Traffic Calming Measures ($5K to $50K) o Signal Retiming ($4K to $10K) o Pedestrian Countdown Signal upgrades ($2K to $4K) o Updated Pavement Markings ($2K to $5K) o Updated Signing ($1K to 2K) o Street Lighting ($3K to $10K) o Curb Extensions ($5K to $150K) 12

Prioritization Low Cost Safety ImprovementsPedestrian Countdown Signals ten-year reportable crash data street width existing or forthcoming ped-countdowns existing hand/man ped signals corridor fill-in recommendations from Streets Curb Extensions Traffic Calming five-year reportable crash study (depending on intervention expense) speed studies – excessive speeding Streets / Planning recommendations classification street length ADT ten-year reportable crash data ADT nearby transit stops impending work Streets / Planning recommendations five-year reportable crash study (depending on intervention expense) street width and complexity nearby transit stops proximity to schools, parks, rec centers existing/impending project Streets / Planning recommendations NOTE: Incidence of fatal crash history may influence priority 13

Traffic Calming Measures ALSO: Midblock Crossings (with RRFB) Neighborhood Bikeway (with greenback sharrows) Separated bike lanes Speed Cushions Parking Chicanes 14

Signal Retiming Signal Coordination (CRF ≈ 15%) Lead Pedestrian Interval (CRF ≈ 5%) Signal Retiming (CRF ≈ 12%) Prohibit Right Turn on Red (CRF ≈ 23%) Over 500 intersections were retimed $1.5M ARLE & CMAQ program budgets. 15

Updated Signing Shared Path Signs Two-Stage Left Sign This in combination w/ sharrows $4M has been spent on ARLE funded low-cost-safety pavement marking and signing projects. 16

Curb Extensions “The response in the neighborhood has been phenomenal! There has been an outpouring of appreciation; especially nice for a project of this scale.” - University City District re. Springfield & Baltimore “We have seen a major decrease in vehicle / bicycle / pedestrian crashes.” - Superintendent Penn Police re. 38 th & Spruce AFTER – Springfield & Baltimore BEFORE – Springfield & Baltimore 17

More Expensive Safety Improvements Higher-cost countermeasure locations are selected based on a more robust investigation of crash histories, risk, and anticipated impact. Installation of red-light cameras (CRF = 28%) Philadelphia has 30 intersections city-wide with cameras Design/Construction of large curb extension projects Intersection construction costs over $150K and up to $1M Design/Constr of modern roundabouts (CRF ≈ 35%) Current program targeting project constr costs of ~$300K Adaptive response signals at key locations Implementation of city-wide signal system integration Corridor modernization for signals, island work, ramps. 18

Coming Soon Philadelphia is continually working to introduce new ways of improving safety and draws upon our Complete Streets and Traffic Calming tool boxes and inspiration from other cities… Neighborhood traffic calming circle Neighborhood traffic diverter Pedestrian refuge as a chicane Protected bike lanes 19

Thank you for your interest! For more information, please contact: Gustave Scheerbaum, PE City of Philadelphia Mayor’s Office of Transportation & Utilities |