GLAST LAT ProjectMarch 24, 2003 7C Tracker Peer Review, WBS 4.1.4 1 GLAST Large Area Telescope: Tracker Subsystem WBS 4.1.4 7C: Electronics Module Testing.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectPeer Review, March 24-25, D 1 Gamma-ray Large Area Space Telescope 7D: Tray test plans GLAST Large Area Telescope: GLAST Large Area.
Advertisements

The Gamma-ray Large Area Space Telescope: UNDERSTANDING THE MOST POWERFUL ENERGY SOURCES IN THE UNIVERSE The GLAST LAT Silicon Strip Tracker-Converter.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Tracker Test Plan Overview.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 R.P. Johnson, UCSC 1 Silicon-Strip Tracker Converter Robert P. Johnson Santa.
GLAST LAT ProjectF-to-F, March, TrackerR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face March Meeting Robert Johnson.
GLAST LAT ProjectMay 20, 2003 LAT Engineering Meeting Tracker, WBS GLAST Large Area Telescope: Tracker Subsystem WBS Revisions to Tray Design.
GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S August Status Meeting.
GLAST LAT Silicon Tracker Marcus ZieglerAPS April Meeting The GLAST Silicon Tracker Marcus Ziegler Santa Cruz Institute for Particle Physics University.
GLAST LAT ProjectOctober 14, 2002 Tracker, WBS GLAST Large Area Telescope: Tracker Subsystem WBS Engineering Meeting Tracker Engineering-Model.
GLAST LAT ProjectDOE/NASA Delta Baseline/Preliminary Design Review, July 30, 2002 Tracker, WBS GLAST Large Area Telescope: Tracker Subsystem WBS.
GLAST LAT ProjectMonthly Status Review – December 2, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Darren Marsh SLAC Performance & Safety.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: On-Orbit Calibration and.
Tracker Subsystem1 GLAST LAT Project FM4/5 PSR, May 31, 2005 GLAST LAT Tracker Tower-4/5 Pre-Ship Review INFN-Pisa.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
GLAST LAT Silicon Tracker Marcus ZieglerAPS April Meeting The GLAST Silicon Tracker Marcus Ziegler Santa Cruz Institute for Particle Physics University.
GLAST LAT ProjectF2F, June 15, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager.
GLAST LAT Silicon Tracker Marcus ZieglerIEEE The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus Ziegler.
GLAST LAT Silicon Tracker Marcus ZieglerAPS April Meeting The GLAST Silicon Tracker Marcus Ziegler Santa Cruz Institute for Particle Physics University.
Brian Keeney, SCIPP trip to LLU, May 2, 2001 Status of Development on Silicon Telescope For Nanodosimetry Santa Cruz Institute For Particle Physics University.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 16 EEE Parts 1 GLAST Large Area Telescope Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
ISOC Peer Review - March 2, 2004 Section GLAST Large Area Telescope ISOC Peer Review Test Bed Terry Schalk GLAST Flight Software
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
GLAST LAT ProjectTower Power Supply Review Sept 22, 2003 Gunther HallerPart 1, Version 3 1 GLAST Large Area Telescope: Electronics, Data Acquisition &
GLAST LAT ProjectPDU/GASU MRR, February 3, DAQ & FSWV1 1 GLAST Large Area Telescope: B. Estey, G. Haller SLAC xxxx LAT Quality Engineer
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, BNick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 GLAST Large Area Telescope: Tracker Subsystem MCM Production Readiness.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Robert P. Johnson 1 GLAST Large Area Telescope: Silicon-Strip Tracker/Converter.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Electronics Design and.
The Gamma-ray Large Area Space Telescope: The GLAST LAT Silicon Strip Tracker-Converter Robert P. Johnson, U.C. Santa Cruz and the Santa Cruz Institute.
GLAST LAT ProjectMarch 24, D Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS D: Composite Panel Fabrication.
Tracker Subsystem1 GLAST LAT Project Production Readiness Review, 25 August, 2004 GLAST LAT Tracker TOWER-A PRR TKR Tower Electrical Test Plan Luca Latronico.
Tracker Production Overview Readout Cables UCSC, SLAC (Parlex) SSD Procurement, Testing SLAC,Japan, Italy (HPK) Electronics Fabrication, burn-in, & Test.
GLAST LAT ProjectOctober 23, 2003 GTRC Mini-Review Tracker, WBS GLAST Large Area Telescope: Tracker Subsystem WBS GTRC Review November 14,
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: On-Orbit Calibration and.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Ladder Fabrication A. Brez.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Engineering Model Tower.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Schedule Summary; Critical.
GLAST LAT ProjectMarch 24, G Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS G: Tower module assembly A.
GLAST LAT ProjectMarch 24, H Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS H: Tower Shipping and Storage.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: EM Mini-Tower Robert Johnson.
GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS E: Mechanical Parts and Materials.
Tracker SSD Ladder Preproduction Review Actions and Changes Since Last Week September 16, 2002 Alessandro Brez Robert Johnson.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
Tracker Subsystem1 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 GLAST LAT Tracker Delta Manufacturer Readiness Review for Tray Assembly and Test at.
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: Tray assembly A. Brez I.N.F.N.
MRB on SLAC NCR 226 Excess of Disconnected MCM Channels R.P. Johnson November 9, 2004.
GLAST LAT Project4.1.7 G. Haller V2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S April Status Gunther.
GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS E: MCM Assembly Gamma-ray.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Electronic Parts & Materials.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Silicon Strip Detector.
GLAST LAT ProjectQuarterly Review, November 12, 2002 LAT-PR GLAST Large Area Telescope: Tracker Subsystem Robert Johnson Santa Cruz Institute for.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 LAT QA has hired a full-time on-site representative (Donald Knaepple)
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Introduction Robert Johnson.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Parts and Materials Procurement.
GLAST LAT ProjectTEM/TPS MRR, September 16, DAQ & FSWV1 1 GLAST Large Area Telescope: B. Estey, Production SLAC (650)
Tracker Timing Margin MRB R.P. Johnson U.C. Santa Cruz October 15, 2004.
GLAST Large Area Telescope:
GLAST Large Area Telescope:
SUMMARY OF THE ORSAY LD-TPC ELECTRONICS MEETING
Preproduction Status & Results
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing Robert Johnson Santa Cruz Institute for Particle Physics University of California at Santa Cruz Tracker Subsystem Manager Gamma-ray Large Area Space Telescope

GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS Overview Draft test plan: LAT-TD High yield and good quality of MCMs requires testing at several levels during the production: –Printed Wiring Board: full test against the netlist by flying probe –Parts screening specified in several procurements: Polyswitches (LAT-SS-01116) Nano Connectors (LAT-DS-01807) HV Capacitors (LAT-PS-01194) Standard QML SMT parts –Wafer probing of the GTFE and GTRC ASICs (Presentation 5D) –MCM testing after SMT parts and connector soldering –MCM functional tests after die attach –MCM thermal cycle and burn-in –Final acceptance test

GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS MCM Testing at Teledyne Test system and software supplied by UCSC/SLAC. Initial power-on test after soldering but before die attach. –Check for shorts in the power bussing. –Check for leakage on the SSD bias-voltage line. Complete electrical test after die attach and wire bonding but before die encapsulation (see also Presentation 6E). –Functional test –Power consumption –Basic amplifier-discriminator performance VME with COM Card and ADC Frequency Counter Adjustable Clock PC MCM DUT Interface Card (with cover removed)

GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS Test and Burn-In This work will be done in the SLAC clean room in Building 33. The MCMs remain in their closed storage boxes throughout this procedure. A functionality test is done to check that no damage occurred during encapsulation. 9 MCMs are connected to a pair of special flex-circuit cables (1 is shown at right, with a repeater board). 4 such cables pairs are installed in a climatic chamber. 8 long cables attach to the repeater boards and exit the chamber, to connect with a TEM. The 36 MCMs are thermal cycled through the required acceptance cycles. The temperature is raised to 85°C for 336 hours for burn-in. During this time the electronics are continually exercised and tested.

GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS Further MCM Testing Final Acceptance Test: performed in Italy prior to bonding of the MCM to the edge of a tray panel. Test after wire bonding to the bias circuit but prior to mounting of SSD ladders. –Checks for shorts or leakage in the SSD bias path. –Final check of the tray before committing expensive SSD ladders. Test after completion of tray assembly. –First test with input load on the amplifiers. –Preliminary catalog of dead or noisy channels. Cosmic-ray testing of stacked trays (still in their service boxes). Tower electrical testing (test plan = LAT-TD-00191).