Accelerator Status and Plans

Slides:



Advertisements
Similar presentations
PIP Update Oct Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Ken Domann.
Advertisements

Chris Smith Booster RF Cavity Upgrade Contents: The Booster Existing RF Cavities Why Upgrade? New Cavities Prototype Plans University Involvement Prototype.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
Proton Improvement Plan Bob Zwaska August 3, 2015 All-Experimenters Meeting.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
Getting Beam to NuMI (It’s a worry!) Peter Kasper.
PIP Update Feb 20 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
SNuMI (>1MW) SNuMI 1 Motivations for SNuMI The neutrino experimental program for the next decade –NOνA (long baseline νμ→νe search) –MINERνA (Main Injector.
All Experimenters’ Meeting November 03, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting February 09, Accelerator Operation Summary Calendar Week # 06 NuMI Weekly Integrated Intensity 6.69 E18 protons Beam.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
PIP Update June 3 rd Agenda Summary Update – Current Activities – Updates Ken Domann – Budget & Schedule Ryan Crawford – Anode Supply Update – Additional.
Proton Improvement Plan William Pellico FRA Visiting Committee Meeting March 14-15, 2011.
Ff NO A Accelerator Upgrades: Status Phil Adamson Fermilab
Proton Study Meeting 4/19/05 Eric Prebys 1 Proton Plan Stage I Eric Prebys.
Accelerator and NuMI Upgrades Shutdown Update Cons Gattuso July 02, 2012 July 2, 2012 Cons Gattuso1.
Recent RF Development at Fermilab Weiren Chou and Akira Takagi Fermilab, U.S.A. July 7, 2003 Presentation to the FFAG03 Workshop July 7-12, 2003, KEK.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
PIP Update Dec. 4th Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Ken.
Accelerator Operations and PIP Sergei Nagaitsev DOE OHEP briefing 6 March 2014.
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
PIP Update April 8 th Agenda Summary Update – Current Activities – Updates (V. Kapin: Booster Collimator) – Additional Meetings/Notes.
PIP Update April 8 th Agenda Summary Update – Current Activities – Updates (Joe Compton - shutdown) – Additional Meetings/Notes.
Accelerator Issues Fermilab Antiproton Experiment Keith Gollwitzer Antiproton Source Department Accelerator Division Fermilab.
Proton Plan PMG 7/7/05 E Prebys 1 Proton Plan Status June Report Eric Prebys.
PIP-II: Why a new accelerator? Paul Derwent Fermilab Community Advisory Board 23 July 2015.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
All Experimenters’ Meeting January 26, Accelerator Operation Summary Calendar Week # 03 NuMI Weekly Integrated Intensity 2.74 E18 protons Beam.
PIP Update June 17 th Agenda Summary Update – Current Activities – Updates (Alexander Valishev - Simplified Modeling of Space Charge Losses in Booster.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Doug Michael Sep. 16, GeV protons 1.9 second cycle time 4x10 13 protons/pulse 0.4 MW! Single turn extraction (10  s) 4x10 20 protons/year 700.
Proton Plan Expectations Eric Prebys AD/Proton Source.
All Experimenters’ Meeting October 20, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting December 8, 2014 Photo by Greg Vogel.
PIP Update June 18 th Agenda Summary Update – Current Activities/Updates – Reid, Slabaugh.
Main Injector Beam Position Monitor Upgrade: Status and Plans Rob Kutschke All Experimenters’ Meeting April 3, 2006 Beams-doc-2217-v3.
Proton Plan PMG 2/22/07 E Prebys 1 Proton Plan Status January Eric Prebys.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
High Intensity Booster Operations William Pellico PIP II collaboration Nov. 9 th 2015.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
SNuMI: WBS 1.1 Booster Upgrades Eric Prebys $642K FY06$ (no contingency, no G&A) xx% contingency Main Injector & Recycler BNB NuMI Tunnel Booster Ring.
F A Fermilab Roadmap Dave McGinnis May 28, f Fermilab Roadmap - McGinnis Timelines  Divide the road map into three parallel paths  ILC - Energy.
Proton Planning Eric Prebys FNAL Accelerator Division.
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
Early Beam Injection Scheme for the Fermilab Booster: A Path for Intensity Upgrade Chandra Bhat Fermi National Accelerator Laboratory DPF2015, ANN ARBOR,
PIP Update Oct 29 th Agenda Summary Update – Current Activities – Updates – Additional Meetings/Notes.
Proton Plan PMG 4/18/05 E Prebys/J. Sims 1 Proton Plan Status March Report Eric Prebys Jeff Sims.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
Proton Improvement Plan Bob Zwaska September 9, 2013 All-Experimenters Meeting.
PAC Meeting, December 12, Prebys 1 The Problem.
PIP Update March 6 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
Protons for Neutrinos: Mid-Term and Project-X Bob Zwaska Fermilab Intensity Frontier Neutrino Working Group Meeting October 24, 2011.
Limitations to Total Booster Flux Total protons per batch: 4E12 with decent beam loss, 5E12 max. Average rep rate of the machine: –Injection bump magnets.
MI/RR Operation Status Ioanis Kourbanis August 21, 2014.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
Status of FNAL accelerator complex Sergei Nagaitsev 47th Annual Fermilab Users Meeting 11 June 2014.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
PIP Update June 17 th Agenda Summary Update – Current Activities – Updates (Matt – Cavity Refurbishment) – Additional Meetings/Notes.
Proton Economics Eric Prebys FNAL Accelerator Division.
Accelerator Division View Sergei Nagaitsev DOE Independent Project Review of PIP-II 16 June 2015.
All Experimenters Meeting PIP Report Fernanda G. Garcia on behalf of PIP team 10/06/2014.
Proton PMG May 7 th 2015 Cons Gattuso AD Shutdown Manager.
Welcome! Robert Zwaska 23 November 2015 Workshop on Booster Performance and Enhancements.
News and brief overview of Beamline plans for the next few months
Presentation transcript:

Accelerator Status and Plans Mary Convery Fermilab Physics Advisory Committee Meeting 23 June 2015

Fermilab Accelerator Complex Linac: MTA BNB: MicroBooNE NuMI: MINOS+, MINERvA, NOvA Fixed Target: SeaQuest, LArIAT, Test Beam Facility Muon: g-2, Mu2e (future) Meeting experiments’ needs in FY16 and beyond requires running beam at 15 Hz in the Booster M Convery | Accelerator Status and Plans 6/23/2015

Objectives for the next few years Ramp up beam power to 700 kW for NOvA, achieve performance metrics, and support full experimental program Achieve 15 Hz beam pulse repetition rate as soon as possible by carrying out Proton Improvement Plan Complete Muon Campus construction on budget and on schedule and commission g-2 experiment in FY17 Make Booster Neutrino Beam operations more robust Target and horn spares production and testing Study of horn upgrade for Short Baseline Neutrino on-going M Convery | Accelerator Status and Plans 6/23/2015

Accelerator performance for NuMI Started delivering protons to NuMI in 2005 ~1.55x1021 in 7 years; NOvA goal is 3.6x1021 Most intense high energy neutrino beam in the world M Convery | Accelerator Status and Plans 6/23/2015

Current high power operation and plans Commissioned slip-stacking in the Recycler Currently slip-stacking 2+6 batches, 3.1x1013 ppp every 1.333 sec Reconfigured Recycler transverse dampers Commissioned MI collimators Increased number of Booster turns Beam power >450 kW (400 kW with SY120) position in Recycler ring time  M Convery | Accelerator Status and Plans 6/23/2015

Current high power operation and plans Testing 4+6 operation (460 kW) prior to the summer shutdown with current Booster rep rate (7.5 Hz, no beam to BNB) Also would like to test low intensity beam at 15 Hz After shutdown will have At least 18 refurbished Booster RF stations installed New Booster shielding assessment taking into account use of Total Loss Monitors to allow higher flux in Booster Increase intensity with 4+6, commission beam at 15 Hz in Booster, commission 6+6 Challenge is keeping losses low beam in the Recycler M Convery | Accelerator Status and Plans 6/23/2015

Recycler Losses before and after the shutdown Reduced Recycler losses by a factor a 4 by improving Recycler aperture M Convery | Accelerator Status and Plans 6/23/2015

Current RR/MI Losses with 2+6 slip stacking Collimators Collimation efficiency Continuing to address Recycler misalignment and aperture issues to further reduce losses M Convery | Accelerator Status and Plans 6/23/2015

Beam power in FY15 on track and increasing Goals for FY16 still under discussion, but think we can ~double POT to NuMI relative to FY15 goals M Convery | Accelerator Status and Plans 6/23/2015

Excellent uptime in FY15 Main Injector bus ground fault and replacement M Convery | Accelerator Status and Plans 6/23/2015

NuMI Target First NOvA target still healthy MET-01 has integrated 6.1×1020 protons Neutrinos experiments looked for deviations in neutrino rate No changes observed which would indicate target degradation Few percent changes are observed, but related to either slip-stacking or detector pile-up Muon monitors show consistent response Variation of ~ 0.5% consistent with fluctuations in spot size and beam intensity First round of spares are ready, more are in production Spare production has been impacted by redirection of effort to BNB M Convery | Accelerator Status and Plans 6/23/2015

NuMI Horn Replacement Horn PH1-04 has severed stripline First 700 kW capable horn, in service since Sept 2013, accumulated ~ 27 million pulses Running in horn-off mode for 3 weeks prior to shutdown Will replace during shutdown Spares of various condition are in hand Under discussion which to use and which modifications to make Location of severed stripline (outer stripline at first clamp)

Designing collimation system for Recycler MI/Recycler upgrades Recycler vacuum Recycler titanium sublimation pump (TSP)-based vacuum system has exceeded design lifetime; not suitable for a proton machine Plan for replacement of ~400 TSPs with ion pumps will take 3 long shutdowns (lots of cutting and welding) Replacing MI beam pipe in MI-30 collimation region with duplex stainless pipe with higher corrosion resistance Designing collimation system for Recycler M Convery | Accelerator Status and Plans 6/23/2015

Proton Improvement Plan Increase the beam repetition rate from the present ~7.5 to 15 Hz Need at least 9 Hz for NOvA 12-batch slip-stacking Requires refurbishment of Booster RF cavities Eliminate major vulnerabilities and maintain reliability at present levels (>85%) at the full repetition rate Eliminate major obsolescence issues Increase the proton source throughput, with a goal of reaching >2x1017 protons/hour Presently operating at <1x1017 protons/hour Ensure a useful operating life of the proton source through at least 2030 (PIP-II) Main challenge: keep beam losses at present level while increasing protons on target M Convery | Accelerator Status and Plans 6/23/2015

Booster loss and Linac laser notch Doubling the beam repetition rate so need to cut the losses per Booster cycle in half Addressing each of the three main areas of Booster beam loss: Injection Notching the beam to create a gap for extraction kickers to fire Transition, related to RF during acceleration Phased improvements to notch creation Most recent was new cogging system which allowed notching at 400 MeV instead of 700 MeV  lower energy losses Final phase is to install laser notcher in Linac PreAcc during shutdown Successful test of Linac notch Dec 2014 Optical cavity (attached end of RFQ) Laser profile M Convery | Accelerator Status and Plans 6/23/2015

PIP recent progress Linac replacement high-voltage modulator for RF power amplifier prototype assembly in progress Booster replacement RF anode power supplies Had trouble finding vendor that can meet specifications but progressing Hope to install during shutdown Booster RF bias supplies being upgraded for reliable 15-Hz operation; expect complete early FY16 Booster new RF cavity tuners Vendor has now met specs for ferrites; Tech Division producing new tuners Preparing new Booster shielding assessment w/ Total Loss Monitors M Convery | Accelerator Status and Plans 6/23/2015

Booster RF cavity refurbishment Expect to have at least 18 cavities certified to run at 15Hz when start up after summer shutdown Installed 17th ahead of schedule Ran at 15 Hz for 6 h A cavity developed tuner problems and was no longer certified; another developed a vacuum leak Had similar issues when first started running east gallery at 15 Hz Hope to try again before shutdown Many tuners still have dings and dents that will likely leak at later time TD making new tuners M Convery | Accelerator Status and Plans 6/23/2015

Booster Neutrino Beam Preparing to run to MicroBooNE Replaced horn which lasted ten years and >400M pulses Expected lifetime was about one year and 100M pulses Had to also redesign and replace adjustor platform and horn extraction mechanism (was not designed to last this long) Looking into requests for upgrades for Short Baseline Neutrino program but limited resources M Convery | Accelerator Status and Plans 6/23/2015

Modifications to allow beam to BNB during MI access Install new gates and safety system FY15 shutdown Fabricate new beam stops and install FY16 shutdown Estimate 1.5x1018 POT/day assuming 5 Hz operation M Convery | Accelerator Status and Plans 6/23/2015

SY120 (120 GeV fixed target program) Delivering beam to Fixed Target Test Beam Facility as needed (the facility is fully subscribed) Supporting a second test beam for LArIAT (repurposed ArgoNeuT liquid argon time projection chamber) Modified primary beamline to allow clean transport of higher intensity beam to SeaQuest Intensity Duty factor # Booster turns Able to provide requested intensity to SeaQuest M Convery | Accelerator Status and Plans 6/23/2015

Muon Campus construction New beamline enclosure for connection from Delivery Ring (former antiproton rings) to g-2 and Mu2e experiments nearing completion M Convery | Accelerator Status and Plans 6/23/2015

Pbar to Muon reconfiguration for Muon Campus / g-2 / Mu2e 5/8/14 start of decommissioning 3/23/15 reconfiguration of new injection/ extraction region Remove existing magnets Reconfigure cables, cooling water, electrical bus, lighting Install injection and extraction lines Reinstall Delivery Ring magnets M Convery | Accelerator Status and Plans 6/23/2015

Muon Campus Recycler modifications Recycler Ring Beam Transport and Delivery Ring Muon Campus g-2 Target Station Assembling new RF cavities to install in FY16 New connection from RR to P1-line to be installed this summer (Drives the length of the shutdown) M Convery | Accelerator Status and Plans 6/23/2015

Protons to Muon Campus In Recycler, use 2.5 MHz RF to rebunch Booster batch of 4x1012 protons into 4 bunches of 1012 protons to Muon Campus experiments Had a conceptual design which provided 16 bunches to g-2, 8 to Mu2e in a 1.33s NOvA cycle (12 Hz / 6 Hz, 3 Hz to BNB) Main Injector Energy Booster Cycles Protons to NOvA Protons to g-2 Protons to MicroBooNE Protons to Mu2e 1.33s M Convery | Accelerator Status and Plans 6/23/2015

Timing of protons to Muon Campus Detailed planning found some modifications needed to timing of bunches to Muon Campus and possibly to NOvA cycle M Convery | Accelerator Status and Plans 6/23/2015

Possible pulse schemes for protons to g-2 (late FY17) 20 ticks, 12 batches to NOvA, 12 2.5-MHz bunches to g-2 every 1.33s 75% rate to g-2 NOvA unaffected (BNB 3.8 Hz) 20 ticks, 11 batches to NOvA, 16 2.5-MHz bunches to g-2 every 1.33s 100% rate to g-2 8% reduction in NOvA intensity (BNB 3.8 Hz) 21 ticks, 12 batches to NOvA, 16 2.5-MHz bunches to g-2 every 1.40s 95% rate to g-2 5% reduction in NOvA rate (BNB 3.6 Hz) Should be able to switch back and forth between these options if desired M Convery | Accelerator Status and Plans 6/23/2015

Possible pulse schemes for protons to Mu2e (FY20) not enough time for Delivery Ring abort kicker to charge 50% rate to Mu2e NOvA unaffected (BNB 3.8 Hz) 100% rate to Mu2e 8% reduction in NOvA intensity (BNB 3.8 Hz) 95% rate to Mu2e 5% reduction in NOvA rate (BNB 3.6 Hz) M Convery | Accelerator Status and Plans 6/23/2015

Projections for FY16 M Convery | Accelerator Status and Plans 6/23/2015

FY16 NuMI POT Projections (Maximize Beam to NuMI) M Convery | Accelerator Status and Plans 6/23/2015

FY16 BNB POT Projections (Maximize Beam to NuMI) M Convery | Accelerator Status and Plans 6/23/2015

Possible to send more beam to BNB at expense of NuMI M Convery | Accelerator Status and Plans 6/23/2015

Accelerator summer shutdowns 2015 shutdown begins July 6 (beam off July 4) 13 weeks First of three phases in Recycler TSP2IP project Connection from Recycler to Muon Campus beamlines General maintenance 2016 shutdown Estimate 10-12 weeks Complete phase two of TSP2IP project Install 2.5-MHz Recycler RF cavities for beam to Muon Campus Rework MI-30 extraction 2017 shutdown Estimate 8-10 weeks Complete phase three of TSP2IP project Shutdowns expected to occur July-Aug to optimize MI performance M Convery | Accelerator Status and Plans 6/23/2015

Master Substation replacement Laboratory typically powered by two substations Kautz Road Substation (KRSS) Typically powers Main Injector and Recycler Master Substation (MSS) Typically powers the remainder of the site Successfully ran on Kautz Road Substation as a test from Nov 2014 – Apr 2015 Will be ready for Master Substation to go offline in Sept 2015 for about one year for replacement M Convery | Accelerator Status and Plans 6/23/2015

Impact of proposed CAPTAIN MINERvA experiment Requires only the usual maintenance and operation of the NuMI beamline and target system already being operated for beam to NOvA M Convery | Accelerator Status and Plans 6/23/2015

Impacts beam available from MI along with other SY120 experiments Impact of LOI:  Direct Search for Dark Photon and Dark Higgs Particles with the SeaQuest Spectrometer Requires the continued maintenance and operation of the Neutrino Muon beamline Impacts beam available from MI along with other SY120 experiments M Convery | Accelerator Status and Plans 6/23/2015

Running with high reliability with record beam power to NOvA Summary Running with high reliability with record beam power to NOvA Preparing to run beam at 15 Hz Increasing protons on target to NOvA with goal of 700 kW next spring Providing beam to SeaQuest, LArIAT, test beams Replaced BNB horn and will be ready to run beam to MicroBooNE Will be ready to run beam to Muon Campus in FY17 M Convery | Accelerator Status and Plans 6/23/2015