Technical Introduction April 2006. Internal usage only 1 General Features  Self contained batch solution for small, standalone applications.  All functionality.

Slides:



Advertisements
Similar presentations
Module # 020 MUST HAVE SHOULD HAVE COULD HAVE
Advertisements

MUST HAVE SHOULD HAVE COULD HAVE Module # 000. Qi Matroller Technical Training session 2006 Presented by Bradley Timm & Rodger Jeffery.
AEPs from TNHG at ACT! Visions 2005 ACT!2005 Enhancement Products from The New Hampton Group.
Yokogawa Network Solutions Presents:
3/17 Dividend Street, Mansfield, 4122, Queensland, Australia phone: web: The SuperCycler A Software.
GSM Relay Controller. GSM Power Supply Voltage must be between 10 – 14vdc.
Copyright, 2006: Invisible Service Technicians, LLC Invisible Service Technicians, LLC Invisible Service Technician Monitor Activation Process: IST MaintSelectionV3.php.
ModCon® 75 Controller.
Inputs: Digital and 4 configurable for Digital or 10 bit Analog Outputs:4 - 8 amp Relays or 700ma Transistors (1 PWM) 4 Line by 18 Character fully.
MCS-Connect Intro to Connect Connection and Setup Display Menus Graphics Uses in troubleshooting Overview.
1 Rev /02 Modular Construction Dual/Redundant CPU/Power Supply Support TCP/IP Communication Protocol 4096 Camera by 512 Monitor Switching English.
1 Rev /02 Modular Construction Dual/Redundant CPU/Power Supply Support TCP/IP Communication Protocol 4096 Camera by 512 Monitor Switching English.
MP IP Strategy Stateye-GUI Provided by Edotronik Munich, May 05, 2006.
S88 structure used in system configuration
Advanced Workgroup System. Printer Admin Utility Monitors printers over IP networks Views Sharp and non-Sharp SNMP Devices Provided Standard with Sharp.
PLC OPERATION & PROGRAMMING Dr. ONUR TOKER. What is a PLC ? PLC is a computer system controlling a process. inputs - the keyboard is analogous to a proximity.
CCNA 2 v3.1 Module 2.
Programmable Logic Controller Internal Operations
Copyright © 2013 FingerTec Worldwide Sdn.Bhd. All rights reserved.
MUST HAVE SHOULD HAVE COULD HAVE Module # 010. Qi Hardware Objectives Recognize hardware Know how to interface to field equipment Know the 4 different.
Copyright © 2013 FingerTec Worldwide Sdn.Bhd. All rights reserved.
DEMONSTRATION FOR SIGMA DATA ACQUISITION MODULES Tempatron Ltd Data Measurements Division Darwin Close Reading RG2 0TB UK T : +44 (0) F :
1. 2 LXU800 User’s Manual 1.Installation – Windows XP UI Features Introduction Data Connection & Disconnection.
Networking All talk - Selective listen Network up to 15 active nodes + 17 passive nodes Nexus/Discovery panels, network repeaters, R3 19” racks, Alarm.
1 Vendor RFI - Event User Guide. 2 Minimum System Requirements Internet connection - Modem, ISDN, DSL, T1. Your connection speed determines your access.
Main Water Leak Detection Panel (SY3618) Features: 1.Operates on 230 V A.C. 2. Provides supervision of Interface modules. 3. LCD display to indicate Module.
The Vision of a Leader Rapid Eye Plus Technical Training.
1 Semester 2 Module 3 Configuring a Router Yuda college of business James Chen
An Introduction to the Windows-based PC Programming Tool Version 0.91
1 MUST HAVE SHOULD HAVE COULD HAVE Module # Configuring the Qi Cluster Objectives: Know the sequence of configuring the Qi Cluster Know how to.
LabVIEW an Introduction
Page 1 ADAM-6000 Web-enabled Smart I/O Γιάννης Στάβαρης Technical Manager Ιούνιος 26, 2007.
NetVuze Precision Network Meter standalone, easy to use, networked with data logging.
MUST HAVE SHOULD HAVE COULD HAVE Module # 120. Communicating with a Host Controller Will know: Supported communications Sequence of events when talking.
Features: ERTL TESTED  Displays distance to leak location in meters.  Indicates Cable break condition.  Modbus Output for BMS Monitoring.  Operates.
1 MUST HAVE SHOULD HAVE COULD HAVE Module # 140. Practical Class Exercise’s, 2 nd session Objectives: Know how to: –Setup a Flowmeter –add Channel based.
What is Sure BDCs? BDC stands for Batch Data Communication and is also known as Batch Input. It is a technique for mass input of data into SAP by simulating.
Ircon ® ScanIR ® 3 Linescanner How to work with Snapshots? Confidential Rev. A 07/2013.
TAKING CARE GUIDELINES Sub-title Place, Month Year.
4 May I/O Control. 4 May What is I/O Control? A Doors feature that allows you to program input events to drive output responses – for example:
IND131/331 Process Weighing Terminal. Internal usage only 1 Process Terminal Portfolio - Opportunity  Process Prices Performance IND110 IND560 IND780.
MUST HAVE SHOULD HAVE COULD HAVE Module # 030. Qi Parameters defined Objectives Know which two PAC databases exist within the Qi Be aware of the parameters.
NetVu Console Product Training V2.0 US.
Chapter 2 Basic Principle of PLC PLC Configuration &Function   Basic Configuration  CPU  Memory  Programming Interface  Communication.
1 Getting Started Exercise Part 1. 2 Profiles related to the exercise When starting use archive profile: GettingStarted_Start.zip The fully completed.
1 OUT OF THE BOX configurable SOLUTIONS powered by.
Touch screen function manual Right & left scroll key Room selecting key, Maximal quantity 50. Controlling Target icon Room background image brightness.
MCS-Connect Revision - 12/22/2015.
JDS5 Training Guide. On Start Up you will see this screen click the OK button Click OK.
Hardware Introduction – Standard vs Q.i
Quality Improvements Quantity Increases Quantifiable Results Configuration and Run Exercise Press the Space Bar when ready to Continue.
IND780batch Model Code Order Examples. Internal usage only 2 IND780batch – Product Circle Hardware Security Key (I-button) Manual, Auto, & Auto with Q.i.
PLC ARCHITECTURE – Memory 2 by Dr. Amin Danial Asham.
Hardware, 010 – Revision notes Scales use Controller board O/Ps for Feed Control (FCE’s) Flow meters use their own on board O/Ps for Feed Control (FCE’s)
Working with the RAPID-CIM Software Dr. Richard A. Wysk Industrial and Manufacturing Engineering PSU.
AAPT workshop W03 July 26, 2014 Saint Cloud State University, MN, USA
PROGRAMMABLE LOGIC CONTROLLER
DriveWorksEZ for the G7 Drive The Intelligent Choice for Distributed Control PP.DWEZ.01 Date: 7/30/06, Rev:
Run-time RAM Usage File integrity checking RecipePlus Run-time file to application file conversion Enhanced language switching New FactoryTalk View ME.
1 Chapter 1 Basic Structures Of Computers. Computer : Introduction A computer is an electronic machine,devised for performing calculations and controlling.
LOGO Electronic Volume Converter TZ, PTZ ”Flougas-T”
Start up: 1. Power off and insert a GSM card, power on and check the GSM signal on the LCD. 2. Use the LCD and keys on the module to check and set the.
1 Terminal Management System Usage Overview Document Version 1.1.
C1300 advanced circular chart recorder
IBM PC Controlled Keypunch4b
Analog Room Command Module
NSA-7000 Stylish flush mount Network Sensors
Programmable Logic Controllers (PLCs) An Overview.
Data Groupings: File File: a group of related records
ACOE347 – Data Acquisition and Automation Systems
Presentation transcript:

Technical Introduction April 2006

Internal usage only 1 General Features  Self contained batch solution for small, standalone applications.  All functionality performed by internal JagBASIC program  Is supplied in single metal enclosure.  Integrated panel mount serial printer - For feed, batch and consumption reports  Integrated 4x20 character display - For clear operator prompts and messages  Operator prompts and status information displayed  Feed History data transmitted via Ethernet after each feed  Feed, batch and consumption reports available on RS232 port  Customization (within reason !): - JagBASIC code is written by MT personnel, this allows us to customize the functionality quickly and easily. - Ie operator prompts and data format output - RS232 data to Host control and PC systems - RS232 commands from a Host control system

Internal usage only 2 System Architecture  For illustration purposes only, equipment may change depending on requirements 4 to 16 BCD Decoder FCE O/P contact in series with contacts FCE O/P Field Control Elements Aux. Power Supply Com2: 9600: 8:1:E Com1: 9600: 8:1:N Pushbuttons & Lamps CPU & MF I/O 4 O/Ps from MF card Printer LCD Display E-Stop for O/Ps

Internal usage only 3 Recipe Features  Recipe storage in single text file - Can be read and edited by any PC based text editor  (offline editor coming soon!)  Maximum of 99 Recipes  Maximum of 30 steps per recipe  Maximum of 15+1 physical Scale based Outputs  Max of 99 internal Material paths (wrap around)  Timers x 1  Hand Additions (included in Material Path definition)  Events x 1

Internal usage only 4 Process Features  Tolerance checking and alarm via physical O/P. - Keypress OR input activation required to continue.  Pause between feeds via external “Hold” I/P. - Always active!  Event phase in Recipe - Process will Set an O/P and pause process until an I/P is turned ON  Feed reports automatically at end of every feed (RS232)  Batch and consumption reports on demand  Abort via External push button  Single and two speed supported  Clear operator: - Prompts - Status info - And Alarms - via LCD display

Internal usage only 5 Recipe configuration  Recipe configured via Matroller front display and keypad.  External keyboard also supported!  Recipe’s can be: - Created - Deleted - Edited  Note: edit of existing phases (steps) only. New phases cannot be appended to an existing recipe, yet.  Recipe file can be copied into and out of the Matroller, - This allows off line editing of recipe

Internal usage only 6 Navigation

Internal usage only 7 Schematic

Internal usage only 8 Schematic BCD O/P section L

Internal usage only 9 Schematic BCD O/P section L

Internal usage only 10 Schematic detail C

Internal usage only 11 Schematic detail D

Internal usage only 12 QBCompact configuration and setup  The QBCompact has a fixed relationship between the Material Paths in the recipe and the physical relay O/Ps.  Ie if the recipe phase asks for 300 kg of MP 6. Then Relay #6 will turn ON when this phase is executed.  When a non feed phase is active then the MP selection O/Ps are all 0. The BCD MP decoder by design will then turn ON O/P1. We therefore recommend where possible to NOT use MP1 when configuring your system. If MP1 is used then please be aware that by default this O/P of the steering matrix will be ON when no other MPs are selected.  Configure Matroller Channel/s  Configure Matroller material Paths  Wire field Control elements to QBCompact terminals (when appropriate) - !! MP3 in a recipe will turn ON relay 3. Ensure that you are using the correct Relay  Define process and plan recipe  Enter recipe  Simulate and test system

Internal usage only 13 I/O allocation QBatchCompact I/O allocation Controller board SHDataVar O/P1Scale A FCE controlP_500 O/P2Scale B FCE controlP_501 O/P3P_502 O/P4Turns ON during Timer phaseP_503opTimer% I/P1Hand Ack Scale AP_100 I/P2Hand Ack Scale BP_101 I/P3Abort FeedP_102ipAbort% I/P4EnterP_103ipStart% MultiFunction board O/P1FastFeed 1P_508 O/P2FastFeed 2P_509 O/P3Out of Tolerance indicationP_50AopTol% O/P4Turns ON, phase waits until ipEvCont% = 1P_50BopEvent% O/P5BCD MP encodeP_50CPAR4_4% O/P6BCD MP encodeP_50DPAR4_5% O/P7BCD MP encodeP_50EPAR4_6% O/P8BCD MP encodeP_50FPAR4_7% I/P1Out of Tolerance AcknowledgeP_108ipAck% I/P2Event continueP_109ipEvCont% I/P3Pause at end of Feed (latching Input)P_10AipPause%

Internal usage only 14 Typical recipe  Process description (single scale) - Add 300 kg of MP2 (water) - Wait for 34 seconds - Add 25 kg of MP3 (paste) - Wait for temperature to reach 50 deg (mix during this period) - Empty Scale, MP5 (discharge cycle)  Process Notes: - After adding paste, an O/P from the Matroller must trigger a heat phase of a separate temperature controller. Once the target temp has been reached an O/P of the temp controller will turn on, this O/P will trigger the next phase of the recipe  In PAC database, configure: - Scale A as Channel 1 - MP2 as GIW, Channel 1, Spill, water - MP3 as GIW, Channel 1, K1, paste - MP5 as LIW, Channel 1, DTE, discharge, destination as 255

Internal usage only 15 Wiring to the field  Connect MP2, 3 and 6 field wires to Relays 2, 3 and 6  Matroller MF O/P 4 connected to Relay x (ref: official schematic)  Temp controller O/P connected to MF I/P 2  Provide correct voltage for field devices  QBCompact O/Ps are potential free contacts, an external voltage must be supplied for powering the field devices

Internal usage only 16 Recipe Structure  The following information is required to be entered into a recipe - Recipe name (16 characters ) - Channel # ( 1 Char ) - MP # (2 Chars ) - Type (GIW, LIW, Event, Timer, Hand Add) - Target (6 Chars) - Pos Tolerance (6 Chars) - Neg Tolerance (6 Chars)  The Matroller will prompt you through each step

Internal usage only 17 Misc Information  MF I/P # 3 is used to pause the process at the end or start of a physical feed.  This can be connected to a PLC O/P which could be used as an interlock between the PLC and the batching process. The PLC will then provide an OK to feed signal.  When starting a recipe you will be prompted to enter in the number of required batches, enter in a number from 1 (default) to 98.  Entering 99 will result in an infinite number of batches (continuous cycle)  The MPs will “wrap around after  Timers