RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

Suspension Systems - 1 Topics covered in this presentation:
F&T Inc. OVERHEAD CRANE SAFETY.
How to center the top roller Current Situation The slider is not centered because the bottom slider was not placed at 6 o’clock ?!
Heavy Concrete Construction Formwork
Present Procedure for cutting stuck casing on Drilling PLATFORM
M760 TOWER CRANES ERECTION
Click on this image to open the full PDF document.
CMS ZDC Crane Emergency Payload Removal Procedures This document proposes the viability of using a portable hydraulic actuator Hand crane (Davit crane)
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
1.  Preparation of larger parts in a Clean room Class (ISO7)  Preparation of smaller parts in a “baldaquin” annex  Assembly in a clean-room Class.
Dan Cheng H. Felice, R. Hafalia QXF Structures Video Meeting July 10, 2014 Coil Handling for Magnet Assembly Status Update.
MICE Collaboration Meeting at Frascati, Jun 26~29, 2005 Iron Shield Mounting Design Stephanie Yang.
1 Installation of Delphi Frame  ITS Installation.
Baseplates and Hg System Handling V.B. Graves P.T. Spampinato MERIT Hg System Safety Review CERN June 19-20, 2006.
MICE Collaboration Meeting at Frascati, Jun 26~29, 2005 PID Support Design Stephanie Yang.
CERN, November 25, 2003 – Technical Board Support chariot for ITS & FMD services on the RB24 side Foreward –This presentation reports the current ideas.
EA meeting, Wednesday 6 Dec 2006 TT installation, Jeroen van Tilburg 1 TT installation Installation of the TT station.
MICE – Moving Platform Engineering solution –A proposal 16/02/2011Norbert Collomb1.
Appendices Subpart R Steel Erection
Addendum to EDMS document “Instruction Manual for inserting the CMS ZDCs using the HXTC crane” In addition to the ZDC detectors in the TAN instrument.
1 The Support Structural System for Sicbar and EC Detector of SciBooNE FermiLab/PPD/MD May 08, 2006 Edward Chi.
SQXF Shell & Yoke Assembly Procedure
Installation of FD in September A.Jeremie, B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With the help of KEK, SLAC, KNU and CERN colleagues For.
SOL-GEL COATING FACILITY CONCEPTUAL DESIGN REVIEW October 19, 2005.
A PRESENTATION on “ SUSPENSION SYSTEM ”
CMS ZDC Remote Handling Status LTEX Meeting - Sept. 13, 2012 The Crane Testing and Development has moved from SX5 to ISR: Crane #2 has been fully assembled,
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
ZDC Remote Handling Tool Structure and Force Analysis P. Debbins University of Iowa December 10, 2009.
NLA-5 Series Rigging Manual Preparation Material 2.
TAS at IP5 Present situation and plans François BUTIN TS/LEA.
TOB meeting, TOB meeting 20 September 2005, Antti Onnela: TOB mechanical integration status and plans n TST-TOB-TIB integration exercise n.
Baseplates and Hg System Handling V.B. Graves P.T. Spampinato MERIT Hg System Safety Review CERN June 19-20, 2006.
SLHC Engineering Upgrade FCAL Remove-Install step by step procedure. Mircea Cadabeschi-University of Toronto March 01,
1 03/21/2006 GLAST CU Beam Test Workshop Scanning Table.
Safe use of remote controls. Points of note Short video.
Vicon subsoiler - Terra PL Product Information 2013.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
TB Peter Glässel, Heidelberg1 Preparing TPC Installation.
Recommendations on Supports and Adjustment systems for ESS LINAC Components Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
T2K Remote Handling T. Sekiguchi (KEK) on behalf of Tada (KEK) 2012/11/10.
Baby Mind C OIL DESIGN AND ASSEMBLY SCENARIOS Helder Silva Phillipe Benoit Alexey Dudarev Gabriela Rolando Herman ten Kate Etam Messomo Laurent Nicola.
LBNE Remote Handling Conceptual Design Issues for ORNL Collaboration Kick-off Meeting at ORNL 1/6/2010.
PRELIMINARY VERSION Mechanical integration in the ESS Accelerator tunnel HENRY PRZYBILSKI.
6-Mar-2016 Dan Wenman | FC Installation 1 APA installation and integration at CERN Shipment of APAs APA handling Acceptance testing Tools needed.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
Sébastien MICHALMarch Sébastien MICHALMarch 2009 EES 1 GROOVE EES 1 laid on table to be milled EES 1 laid on table to be milled –Move horizontally.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
VIEW SERIES with Sliding Door
Planning for Proto-DUNE PD Installation and Cabling at CERN
Automotive Engines Theory and Servicing
Automotive Engines Theory and Servicing
ProtoDUNE – DSS Installation, Alignment and QA
SX1 manipulation VERSION 1 Version
Escalator Installation
NA62 LAV Anti1 REMOVAL & TESTS
Plan for the installation of the TAMU screen
Present status of the flux return yoke design
MICE Partial Return Yoke Mechanical Design
Barrel EMC assembling (EDMS DOCUMENT NUMBER /1)
INSTALLATION SEQUENCE
USA-15 Compressor displacement for maintenance
Mounting a BalanceBox®650 to a brick wall
The Mechanical Engineering & Technology (MET)
Neutron guide Shielding Concept
Bunker Wall Design Wall ESS
LIFT,ESCALATOR AND MOVING WALKS
Automotive Engines Theory and Servicing
Presentation transcript:

RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team. 1 The main events in the installation sequence of the RICH1 Gas Enclosure are explained.  The difficulties with the installation  Advance preparations required underground  Installation operations  Summary With thanks to all the design engineers who provided the drawings, especially Rohan and Trevor RICH1 Gas Enclosure Installation

RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team. 2 The Objective. The objective is to insert the gas enclosure into the shielding.  There is a nominal 10mm clearance with the shielding iron at both the vertical and horizontal surfaces.  The Gas Enclosure (GE) frame weighs about 700Kg  The shielding will be already aligned on the beam-line.  The one tonne crane is available but operates above the shielding.  The GE cannot be lifted using the thin window frames

RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team. 3 The solution adopted. An installation beam will be inserted below the upper shield.  The installation beam will be supported from above  A special lifting beam will be fitted inside the GE.  The GE will be initially lifted onto the beam outside the shielding and aligned with the shielding.  Insertion is done using a push travel trolley on the installation beam.  Stabilisers will prevent excessive movement during insertion.  Mounts allowing final position adjustment are fitted.

RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team. 4 GE transportation and lifting Lifting and transportation tooling has been provided..  Lugs bolted to the GE allow a crane to lift and/or rotate it.  A special trolley permits movement when no crane is available.  The GE and trolley are not designed to be lifted as a unit (But perhaps this is still possible?)  The GE is normally transported lying flat on the entrance window.

RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team. 5 The sequence of operations 1 Operations on the cavern floor, prior to installation  All the blanking panels have been removed to allow access inside.  Install the lifting beam  Install the guide rollers (optional at this time). They may interfere with the lifting slings

RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team. 6 The sequence of operations 2 Placement of the installation beam  Bolt the guide plates to the iron  Place the short upper beam (36Kg) in position (using the 1- tonne crane?)  Put the installation beam (85Kg) in position using the 1-tonne crane, the beam clamp and a counter- weight.  Fit connection rods.  Install the push travel trolley and hoist.  Install the downstream GE mounts into the iron shielding. The beam is suspended from crane using the beam clamp. A counterweight of 20Kg is used to keep the beam horizontal Counterweight Beam Clamp 203x102x23mm Universal Beam

RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team. 7 The sequence of operations 3 Displacement to the platform using the cavern crane  Place the trolley on the platform  Lift the GE and place it directly on the trolley  (Or lift GE and trolley together directly from the cavern floor)  Remove the lifting lugs Translation to the installation point.  The trolley with the GE can be wheeled to the installation point under the beam  Attach the lifting beam, guide rollers (if not already done) and the beam clamp. Raise the GE on the hoist.  Attach the hoist, lift and adjust for balance by moving the clamp if necessary.  Adjust the guide rollers. Insert!

RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team. 8

RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team. 9 The sequence of operations 4 Fitting and adjusting the mounts.  The downstream mounts are already in position and need only be screwed up as necessary.  The upstream mounts must be fitted and height shims inserted.  Remove all the installation equipment.  A survey will then be performed.  Position adjustments to be made as required.

RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team. 10 Summary A sequence of operations has been described which we believe is both safe and permits the installation of the gas enclosure in a controlled manner. Engineering calculations of all the critical components indicate that they are operating with large safety margins.

RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team. 11