Equipment Planning and Project Consulting Technology Management.

Slides:



Advertisements
Similar presentations
Delivering Equitable Care in Mental Health Services A Clinical Area Based Approach Itai Nyamatore Clinical Team Manager O.B.M.H.
Advertisements

Care Coordinator Roles and Responsibilities
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
1 Procuring a Design Project engineers perspective on starting the design process and establishing the A/E scope of work Frank C. Quigley General Engineer.
Proposal / Request For Proposal Proposal / Request For Proposal Initiation Control Planning Close-down Execution.
Health Information Technology Training 3 A Connected Infrastructure with a Behavioral Health Component 3 Hospitals Pharmacies Diagnostic Labs Physicians.
Close Out of a Construction Project, …the Hardest Part. PASBO 49th Conference Clinic Table March 12, 2004 Richard A. Bernardini, PE Vice President.
Case Study: Surgical Instrument Service Consolidation/Internalization I/T Technology Management Division Clinical Engineering – Diagnostic Imaging Service.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
EE496A Senior Design Project I Dr. Jane Dong Electrical and Computer Engineering.
ERP Solution In Hospital Yangyang Shao TTU What is an ERP? “ ERP – Enterprise Resource Planning ” (an integrated business operating system)
Comprehensive Guidance and Counseling
WELCOME TO THE PROCUREMENT SEMINAR Procurement and Contracts An Overview of Contract Administration.
000000_1 Confidential and proprietary information of Ingram Micro Inc. — Do not distribute or duplicate without Ingram Micro's express written permission.
Basel Accord IITRANSITIONSERVICES Business Integration Support FCM Management Limited Paris New York Toronto.
Facility Space Planning for Emergency Department Using Simulation Analysis SHS Conference February 2004 Lillian Miller.
Deerfield Beach Fort Pierce Jacksonville. © 2002 KAMM Consulting Implementation Needs Assessment Proposal/ Contract Conceptual Design Schematic Design.
28 – 29 September 2011 Vedic Village Spa Resort Kolkata, India. Mohammad Dauod Khuram MD, MPH National Manager, Health Program Aga Khan Foundation, Afghanistan.
Revenue Cycle Management Medical Technology Acquisition and Assessment Team Members: Joseph Dixon, Michael Morotti, Mari Pirie-St. Pierre, David Robbins.
1 RWANDA: A Case Study Introduction of an Integrated Package on MIYCN & PMTCT - Training, Counselling and Other Tools Cornelia Van Zyl, EGPAF Rwanda Country.
Systems, Design and Manufacturing Kernel Company Profile Rev 5.1 Dec, 2014.
ERP E NTERPRISE R ESOURCE P LANNING Every Monday, 13:30 – 16:00 Last Updated: 31 March 2009ERP – Ir. H. Noor Hidayat, MMT.1.
Server Virtualization: Navy Network Operations Centers
28 – 29 September 2011 Vedic Village Spa Resort Kolkata, India. Name of Presenter: Gautam Mazumder Position/Company State Coordinator-PPM Project in West.
E-Business and the Changing Face of the Construction Industry Steve Jones Primavera Systems, Inc. Case Study 2000 CII Annual Conference Nashville, Tennessee.
Dan Frasier, PE, CCP Successful Turnover of New and Renovation Construction Projects Successful Turnover of New and Renovation Construction.
The Important Role of Ward Sisters / Charge Nurses in HSC Trusts Alan Corry Finn Executive Director of Nursing / Director of Primary Care & Older People’s.
From Research Prototype to Production
Industrial Engineering Roles In Industry
Hospital Facility Managers Association of Delaware Valley.
Office of Career, Technical and Agricultural Education ACCT Architecture, Construction, Communication & Transportation Engineering Drawing and Design Pathway.
Main Building Utility Plan Phase 1 - Study PRE-SUBMITTAL CONFERENCE May 14, 2008, 9:00 AM.
DSA 101 July 2010 Plan Approval Process for the Career Technical Education Facilities Program (CTE)
CON 494 Final Design + Build Arizona State University.
Managing Engineering Design - Infrastructure. Presentation Overview 1.Tools and Techniques 2.Design and Documentation 3.Estimating and Scheduling.
Overview of the project Title:Addressing Social, Cultural and Historical Factors Limiting the Contribution of Medical Laboratory services to antenatal.
Planning for Successful Simulation Simulation Planning Guide - A Guided Discussion.
Module 12 Session 12.1 Visual 1 Module 12 Terminating the Project Session 12.1: Terminating the Project.
Career Opportunities in Public Accounting. Overview Career Paths Career Paths Professional Development Professional Development Organizational Structure.
Project Life Cycle.
Objectives 4 Understand the importance of communication in projects 4 Understand the need and importance of project management.
Glen Fields - Final Project Presentation. What Sets CSI Apart... GBA 573 Consultants Company Background Located in San Diego, CA 5 Engineering Consultants.
Strengthening Partnerships: Shaping the Future Portland, OR June 6 th – 10 th, 2004 Planning for Success Implementing the California EDRS.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Strategic Business Planning: Building More Centralized Services Tim Cox June 2014.
Calistoga Joint Unified School District Measure “A” Citizens’ Oversight Committee Meeting January 18, 2012.
Construction of a Transfer Station
Process of Planning, Designing and Financing a Hospital
Public–Private Partnerships in Health Carmen Carpio Senior Operations Officer
WHAT IS THE HEALTH SCIENCE CAREER CLUSTER? An introduction to the Health Science Career Exploration Module… Copyright © Texas Education Agency, All.
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science Office of Science Review of the LCLS.
Regulatory Streamlining Task Force Update Discussion Item December 6, 2011 Board of County Commissioners.
Client Senior Design Electrical and Computer Engineering Iowa State University Introduction Abstract Architectural plans are currently being developed.
Enterprise Customer/ Field Services Overview of Client Integration Processes August 9, 2012.
Fundamentals of Project Control Chapter 11 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project.
Project Life Presented by Chuck Ray, PMP ITS Project Manager.
The Importance of Training on Clinical Workflow Adoption Patty Nedved, Rush University Medical Center and Maria Rubio, Burwood Group DISCLAIMER: The views.
Tailoring the EPLC A Clinical Center Approach Ryan Kennedy, IT Project Manager Department of Clinical Research Informatics March 28, 2012.
It could be if you are a third or fourth year medical student and want to experience the specialty of anesthesia in a clinical setting ……
Building Coordinators Luncheon January 20, Agenda Welcome – Pete Strazdas and Jan Van Der Kley LUNCH Presentations Building Coordinator Custodial.
RHH IMAGING PROJECT 2016 PRESENTATION Anita Williams IMG 305.
ABB HVDC Care Customer training.
Mechanical Engineering Facilities Engineering
CLALIT Health services group Israel’s Leading HealthCare Organization
Clinical Engineering Lecture (3).
The Life Cycle of a Project – START to FINISH
CAPITAL PROGRAM OVERVIEW
Building Coordinators
Clinic Timeline Startups
Supplementary Services Project Management Services.
Presentation transcript:

Equipment Planning and Project Consulting Technology Management

Overview  Career path  Types of projects  Planning/Logistics  Phases of construction

Technology Management Career Path  Experience – Clinical Engineering, Nursing, Construction, Diagnostic Imaging  Skill set – Organization, multitask, technical knowledge, Health Care background, construction  Behaviors - Service Oriented, Communication skills  Day in the life - Meetings (in person/TCON), equipment list review, field walks, Vendor interaction/coordination

Technology Management Types of Projects  Diagnostic Imaging installations/renovations  Department expansions  New Tower and Renovation  Health Center / Clinic  Specialty Systems

Technology Management Types of Projects

Technology Management Types of Projects MRI IR Lab

Phase 2/3 Technology Management

Phase 2/3 Technology Management

Phases of Construction  Phase 1 Conceptual Phase Schematic Design Design Development  Phase 2 Construction Documents  Phase 3 Implementation  Phase 4 Close out

Technology Management Scope of Work

Selection of Team Technology Management  Team is assembled by D&C group based on scope of project  Multi-disciplinary Clinical and Technical team as defined in the project scope become part of the team  Responsibilities within team to support the project scope are defined in planning meetings

Phase 1 Technology Management  Work with department users for equipment needs  Provide / submit reports with equipment specifications  Work with facility to purchase facility standards  Create department / room equipment lists

Phase 2/3 Technology Management

Phase 2/3 Technology Management

Phase 2/3 Technology Management  Manage budgets and documentation  Coordination of Special Systems  Planning/Activation meetings  Site QA walks

Technology Management Phase 4 - Closeout  All technical documentation is delivered to Clinical Engineering Services to develop regular maintenance schedules  Project documentation is delivered to D&C to be included in the close-out package  All budgets are finalized and remaining funds returned to finance

13 I/T Technology Management Division On behalf of the Banner Health Technology Management We thank you for attending this session. Enjoy the rest of your day!!