Simulation of the CALICE Test Beams with MOKKA Fabrizio Salvatore Royal Holloway University of London.

Slides:



Advertisements
Similar presentations
The CALICE test beam at CERN Fabrizio Salvatore Royal Holloway University of London (on behalf of the Calice Collaboration) SPSC meeting, CERN, Geneva,
Advertisements

Beam-plug and shielding studies related to HCAL and M2 Robert Paluch, Burkhard Schmidt November 25,
Use of G EANT 4 in CMS AIHENP’99 Crete, April 1999 Véronique Lefébure CERN EP/CMC.
1 Calice UK Analysis Meeting 23/1/07David Ward Cambridge data analysis work David Ward Main focus – data-MC comparisons Using “official” reconstructed.
Adding electronic noise and pedestals to the CALICE simulation LCWS 19 – 23 rd April Catherine Fry (working with D Bowerman) Imperial College London.
1 Calice LCUK Bristol 24/03/09 David Ward WP1 : Test Beam.
1 Calice Meeting 20/9/06David Ward What did we learn from DESY 2005 run? DESY run May CERN run August Data/MC comparisons for ECAL.
Drift Chambers at DESY and CERN Mike Green, Fabrizio Salvatore, Michele Faucci Giannelli.
1Calice-UK Cambridge 9/9/05D.R. Ward David Ward Compare Feb’05 DESY data with Geant4 and Geant3 Monte Carlos. Work in progress – no definitive conclusions.
A preliminary analysis of the CALICE test beam data Dhiman Chakraborty, NIU for the CALICE Collaboration LCWS07, Hamburg, Germany May 29 - June 3, 2007.
Geant4-based Simulation Status and Plans Dhiman Chakraborty, Guilherme Lima, Jeremy McCormick, Vishnu Zutshi Calorimetry Working Group ALCPG 2004 Winter.
Simulation of the CALICE Test Beams with MOKKA Fabrizio Salvatore Royal Holloway University of London.
8/17/031 Geant4 Simulations Guilherme Lima, Jeremy McCormick General Comments Test Stand (JM) Test Beam (GL)
LC detector simulation efforts in America Dhiman Chakraborty N. I. Center for Accelerator & Detector Development for the International.
Anne-Marie Magnan Imperial College London CALICE Si-W EM calorimeter Preliminary Results of the testbeams st part On behalf of the CALICE Collaboration.
Test Beam models in Mokka Fabrizio Salvatore (RHUL) Gabriel Musat (LLR) Paulo Mora de Freitas (LLR)
Tracking System at CERN 06 and 07 test beams Michele Faucci Giannelli.
1 Calice UK Analysis Meeting 23/1/07David Ward/Nige Watson UK Analysis tasks (WP1) David Ward Nige Watson TexPoint fonts used in EMF. Read the TexPoint.
Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.
Inside the new Mokka release Fabrizio Salvatore (RHUL) Gabriel Musat (LLR) Paulo Mora de Freitas (LLR)
29 Mar 2007Tracking - Paul Dauncey1 Tracking/Alignment Status Paul Dauncey, Michele Faucci Giannelli, Mike Green, Anne-Marie Magnan, George Mavromanolakis,
Certifying Geant4-based calorimeter simulations for the LCD Dhiman Chakraborty, Guilherme Lima, Jeremy McCormick, Vishnu Zutshi NICADD, NIU ALCWG-Cal Meeting.
1 Calice UK s/w meeting RHUL 24/1/06D.R. Ward David Ward Have previously reported on comparison of Feb’05 DESY data with Geant4 Monte Carlos. Issues with.
1/9/2003 UTA-GEM Simulation Report Venkatesh Kaushik 1 Simulation Study of Digital Hadron Calorimeter Using GEM Venkatesh Kaushik* University of Texas.
17-19 Oct, 2007Geant4 Japan Oct, 2007Geant4 Japan Oct, 2007Geant4 Japan 2007 Geant4 Japan.
Michele Faucci Giannelli TILC09, Tsukuba, 18 April 2009 SiW Electromagnetic Calorimeter Testbeam results.
1 Calice UK Meeting 03/11/06David Ward/Nige Watson Analysis tasks David Ward Nige Watson TexPoint fonts used in EMF. Read the TexPoint manual before you.
LCIO A persistency framework for LC detector simulation studies Frank Gaede, DESY, IT 4 th ECFA/DESY LC Workshop Amsterdam April 1 st -4 th 2003.
Mokka and integration of the geometry AIDA kick-off meeting WP2 session: Common software tools 17 February 2011 – CERN Paulo Mora de Freitas and Gabriel.
Time development of showers in a Tungsten-HCAL Calice Collaboration Meeting – Casablanca 2010 Christian Soldner Max-Planck-Institute for Physics.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
Monte Carlo Comparison of RPCs and Liquid Scintillator R. Ray 5/14/04  RPCs with 1-dimensional readout (generated by RR) and liquid scintillator with.
Experimental Setup of the H8-RD22 Experiment Massimiliano Fiorini (on behalf of the H8-RD22 Collaboration) University of Ferrara – INFN Ferrara CARE HHH.
XML Description of ECAL Geometry  For XML description of ECAL Geometry were used: Det/XmlDDDB/v5, Det/XmlEditor/v4, Det/DetDesk/v6, Vis/GaudiLab/v1r4.
1 Tungsten supply and assembly, test beam setup Market survey on tungsten supply Ideas on the frame design Experimental area Test beam setup Wolfgang Klempt/
1 Calice UK Meeting 27/03/07David Ward Plans; timescales for having analysis results for LCWS Status of current MC/data reconstruction Reconstruction status;
Tungsten as HCal-material for a LC at multi-TeV energies CALICE AHCAL Meeting, DESY 17 July 2009 Christian Grefe for the Linear Collider Detector Group.
M. Chefdeville LAPP, Annecy, France. Introduction  Motivations for a Digital hadronic calorimeter Count hits instead of measuring energy deposits Reduce.
Nigel Watson / BirminghamCALICE ECAL, UCL, 06-Mar-2006 Test Beam Task List - ECAL  Aim:  Identify all tasks essential for run and analysis of beam data.
E. GaruttiCALICE collaboration meeting, Prague CERN Test beam (part II) Erika Garutti, Fabrizio Salvatore.
Gabriel Musat L.L.R. – Ecole polytechnique ECFA-DESY Linear Collider Workshop Amsterdam, April 1-4, 2003.
Development of Digital Hadron Calorimeter Using GEM Shahnoor Habib For HEP Group, UT Arlington Oct. 12, 2002 TSAPS Fall ’02, UT Brownsville Simulation.
1ECFA/Vienna 16/11/05D.R. Ward David Ward Compare these test beam data with Geant4 and Geant3 Monte Carlos. CALICE has tested an (incomplete) prototype.
RPC Design Studies Gabriel Stoicea, NIPNE-HH, Bucharest CBM Software Week GSI-Darmstadt May 10, 2004.
Why A Software Review? Now have experience of real data and first major analysis results –What have we learned? –How should that change what we do next.
TB model improvements in Mokka and status of MC production Fabrizio Salvatore Royal Holloway University of London.
Plans for a Simulation Study of the Magnetic Field Requirements of the LC TPC February 2006, ILC TPC Analysis Jamboree, DESY Christian Hansen University.
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
Digital Calorimetry using GEM technology Andy White for UTA group (A. Brandt, K. De, S. Habib, V. Kaushik, J. Li, M. Sosebee, Jae Yu) U.C. Santa Cruz 6/28/2002.
Magnetized hadronic calorimeter and muon veto for the K +   +  experiment L. DiLella, May 25, 2004 Purpose:  Provide pion – muon separation (muon veto)
CaTS and Dual Readout. CaTS – Calorimeter and Tracker Simulation Describe detector in gdml file (xml like) Define.
Mokka, main guidelines and future P. Mora de Freitas Laboratoire Leprince-Ringuet Ecole polytechnique - France Linear collider Workshop 2004, Paris.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
Geant4 Tutorial, Oct28 th 2003V. Daniel Elvira Geant4 Simulation of the CMS 2002 Hcal Test Beam V. Daniel Elvira Geant4 Tutorial.
The Prototype Simulation of SDHCAL Ran.Han Gerald.Grenier Muriel.Donckt IPNL.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
MOKKA - recent developments Gabriel Musat, L.L.R. – Ecole Polytechnique.
A. SarratILC TPC meeting, DESY, 15/02/06 Simulation Of a TPC For T2K Near Detector Using Geant 4 Antony Sarrat CEA Saclay, Dapnia.
1 Calice TB Review DESY 15/6/06D.R. Ward David Ward Post mortem on May’06 DESY running. What’s still needed for DESY analysis? What’s needed for CERN data.
Geant4-based detector simulation activities at NICADD Guilherme Lima for the NICADD simulations group December 2003.
SHIP calorimeters at test beam I. KorolkoFebruary 2016.
W-DHCAL Digitization T. Frisson, C. Grefe (CERN) CALICE Collaboration Meeting at Argonne.
1 MC Production and Reconstruction Summary and Plans Valeria Bartsch, Fabrizio Salvatore, A.-M. Magnan, and Nigel Watson.
Geant4-based Simulation Status and Plans
slicPandora: slic + pandoraPFANew
Tracking System at CERN 06 and 07 test beams
DESY TB05: Drift Chambers simulation
Test Beam Measurements october – november, 2016
Calice Tile-HCal and Tail-catcher/Muon Tracker
Test Beam models in Mokka
Presentation transcript:

Simulation of the CALICE Test Beams with MOKKA Fabrizio Salvatore Royal Holloway University of London

2 What is Mokka ? Full Geant4 based simulation Jobs are controlled by a ‘steering file’ containing native G4 commands and Mokka specific commands  $MOKKA_BIN mokka.steer All physics lists available in G4 can be used LC specific list (LCPhys) also available Latest version is Mokka 06-03p02, released in April 2007

3 Same tool for final detector and prototypes One Geometry db that stores information about geometries supported in the simulation (e.g. LDC, TB, etc)

4 Simulation of 2006 test beams Latest version of Mokka (Apr 07): v06-03p02 Setup of 2006 test beams at Desy and CERN has been simulated in detail in Mokka Different test beam models have been implemented ‘Old’ coordinate system: origin of coordinate system on the back plane of the ECAL Desy tb: model TBDesy0506 CERN Aug tb: model TBCern0806 CERN Oct tb: model TBCern1006 ‘New’ coordinate system: origin of coordinate system on the back plane of DC closer to ECAL (DC1) Desy tb: model TBDesy0506_01 CERN Aug tb: model TBCern0806_01 CERN Oct tb: model TBCern1006_01

5 Z=0 TBDesy0506 Sketch of Desy models TBDesy0506_01

6 Sketch of CERN Aug models TBCern0806 TBCern0806_01

7 ‘Old’ coord. syst. vs ‘New’ coord. syst. - I In ‘old’ coordinate system the axes are tied to the ECAL, therefore when the ECAL is simulated at an angle  wrt beam normal incidence, the ECAL is kept fixed and all beam detectors are rotated by –  wrt the ECAL front face Not intuitive !  = 45 o

8 ‘Old’ coord. syst. vs ‘New’ coord. syst. - II In new coordinate system the axes are not tied to the ECAL, so rotation is done keeping fixed the beam detectors and rotating the ECAL only Config angle EcalSC3DC2SC2DC1FC1,2DC3DC4SC1 Z=0 DC1DC2DC3DC4  = 45 o

9 Detector description: TBDesy0506 I Drift Chambers (FS): installed by Kobe collaborators for the 05 test beam gas mixture is non-flammable (96% Ar, 4% Ethane) 4 drift chambers (72x72x88 mm 3 ) hits written out in LCIO format  To reduce number of hits, only hits with E rel > are written in output Trigger scintillators (FS): 3 scintillators (one 120x120x8 mm 3, two 200x200x8 mm 3 ) used in the trigger hits written out in LCIO format Hits simulated as Calorimeter hits (one hit per chamber)

10 Finger counters (FS): 2 scintillators (5x100x5 mm 3 ) placed in T shape to monitor beam position hits written out in LCIO format Hits simulated as Calorimeter hits (one hit per chamber) ECAL (G.Musat): 3 modules (5 slabs) tungsten thicknesses = 1.4, 2.8, and 4.2 mm. silicon planes divided into wafers  6x6 cells (10x10 mm 2 ), guard-rings (1 mm width)  Two separate hits collections, one for hits in cells and the other for hits in guard-rings Detector description: TBDesy0506 II

11 Detector description: TBCern0806 I Cerenkov detector (FS): It is upstream of the first trigger scintillator (~25 m) 100x100x11000 mm 3, 180  mylar windows, helium gas Only the material is simulated Drift Chambers (FS): provided by CERN (50% Ar, 50% CO 2 ) 3 drift chambers (108x108x44 mm 3 ) hits written out in LCIO format  To reduce number of hits, only hits with E rel > are written in output Trigger scintillators (FS): 3 scintillators used in the trigger (one 30x30x15 mm 3, two 100x100x15 mm 3 ) One veto scintillator (200x200x15 mm 3 ) hits written out in LCIO format Hits simulated as Calorimeter hits

12 Detector description: TBCern0806 II ECAL (G.Musat): same as for TBDesy0506 HCAL (R.Poeschl, O.Wendt): 39 layers (900x900x30 mm³). Each layer is composed by an iron absorber and scintillating material and is sub-divided into 90x90 mm 2 cells of 10x10mm² (virtual cell scheme) Cell numbering scheme (from lower left corner of each layer)  i = row, j = column, k = layer. TailCatcher (J.McCormick, G.Lima): 16 layers (absorber+air+readout module) 2 different absorber thicknesses (19 mm - layers 1 to 8, 101 mm – layers 9 to 16). Readout modules: 9.5 mm. X,Y dimensions: 1168x1168 mm 2 All absorbers in place, but only 8 readout modules (1, 4, 7, 10 – vertical strips, 2, 5, 8, 11 – horizontal strips) Muon Counters (FS): 2 scintillators (1000x1000x50mm 3 ) hits written out in LCIO format Hits simulated as Calorimeter hits

13 Detector description: TBCern1006 Cerenkov detector (FS): same as TBCern0806 Drift Chambers (FS): same as TBCern0806 Trigger scintillators (FS): same as TBCern0806 ECAL (G.Musat): same as TBCern0806 HCAL (R.Poeschl, O.Wendt): Only 30 layers, with same characteristic as TBCern0806 TailCatcher (J.McCormick, G.Lima): Same as TBCern0806, but with all layers fully instrumented Muon Counters (FS): same as TBCern0806

14 Improvements in simulation wrt Mokka 06-03p01 Real drift chambers in the Desy setup give separate measurement of X and Y position on hits Fist half of the chamber gives X position, second half gives Y position As chambers are simulated in Mokka v06-03p01, each hit has an X and Y position Re-write driver to match real chambers as much as possible At the digitization stage, we would like to use drivers that are independent of the setup (Desy or CERN) Need to write one single collection of hits instead of one collection per chamber

15 New DCH driver for Desy0506 model New DCH driver has been tested Each chamber is built assuming two different gas volumes (one for X and one for Y) Hits in each gas volume are simulated as TRKHit (==SimTrackerHit in LCIO) (x,y,z) postion of hit is generated Digi code will have to consider the appropriate coordinate (x or y) depending on the layer Total of 8 layers (2Xchambers) New test beam model implemented in the DB TBDesy0506_dchxy_new

16 New chamber layout Two separate volumes One single hit collection TBdchXY02_dchSDxy0 Use cellID to distinguish hits from each layer: DC1 -> layer 0 (X), 1 (Y) DC2 -> layer 2 (X), 3 (Y) DC3 -> layer 4 (X), 5 (Y) DC4 -> layer 6 (X), 7 (Y)

17 The new Mokka WEB site Paulo Mora de Freitas Gabriel Musat Fabrizio Salvatore

18 The ‘Detector models’ tab

19 Conclusions Models for detailed simulations of the 2006 test beam setup are available Several models are implemented in latest version of Mokka (06-03p02) New DCH layout, with one collection of hits TBDesy0506_dchxy_new Looking into more possible improvements Simulation of steel frame around scintillators (Desy/CERN) Improvement in simulation of CERN DCHs New Mokka page with all details of TB models now available ( ‘Old’ coordinate system TBDesy0506, TBcern0806, TBCern1006 ‘New’ coordinate system TBDesy0506_01, TBcern0806_01, TBCern1006_01