1 Installation Logistics Itzhak Tserruya HBD meeting BNL, July 6, 2006.

Slides:



Advertisements
Similar presentations
Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status.
Advertisements

Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
1 Short update Itzhak Tserruya HBD meeting BNL, April 11, 2006.
Status of the ATLAS MM project
1 Stony Brook Update Getting Serious about HBD East T.K. Hemmick for the Tent Crew.
1 Pixel readout for a LC TPC LCWA 2009 – Detectors Tracking session 30 September 2009 Jan Timmermans On behalf of the Bonn/CERN/Freiburg/Nikhef/Saclay.
Detector Systems Update MICO Feb 25, MICE Detector Systems  CKOV u CKOV installation planned during March shutdown u Cable issues resolved. Geneva.
The Beer Game  Simulates the flow of beer through a simple supply chain—retailer, wholesaler, distributor, manufacturer  Each participant: o forecasts.
From Olivier to commissioning team plans for the start-up of regular operations of LHCb 30/06 to 4/07 : Global commissioning week, all detectors, full.
01/07/08I. Ravinovich1 HBD Update Ilia Ravinovich DC Meeting, January 9, 2008.
1 HBD Construction status Itzhak Tserruya DC meeting, BNL, February, 2006 Plans for Run-6 Box construction GEM assembly and testing Status of urgent items.
HBD Meeting 3/14/06 B. Azmoun BNL Testing and Preparation of HBD Full Scale Prototype for Upcoming Engineering Run Puzzling Behavior of GEM’s To Do List.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
1 Sasha Milov DC meeting Jan 11, 2006 HBD upgrade status. Sasha Milov Jan 11, 2006.
MM construction organization Some thoughts MMM Saclay, 18/04/2013J. Wotschack1.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL, April 11, 2007.
1 HBD Plans for run-6 Itzhak Tserruya DC meeting, BNL, October 12, 2005 HBD status Plans for run 6 ( Back-up: details presented in Upgrades meeting yesterday)
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
1 HBD Update Itzhak Tserruya DC meetingJune 10, 2009 June 10, 2009.
Sasha Milov EC/DC meeting March 9, Assembly and testing facility. Sasha Milov March 9, 2005 Sequence of operations Glove Box Evaporator Other needs.
Itzhak Tserruya, BNL, Aug. 11, Itzhak Tserruya Weizmann Institute, Israel BNL, Upgrades Meeting, Aug. 11, 2004 HBD: Infrastructure and Integration.
CERN Workshop upgrade Rui De Oliveira KOBE WG6 WG6 9/1/20111Rui De Oliveira.
Technical Support Activities in PH-ADO-PO
1 Pixel Detector General –July Evidence of galvanic corrosion in EU barrel cooling tubes. Recovery plan implemented, this problem now solved but…..
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
October 3, 2008 John Haggerty 1 PHENIX Plan for Run 9 John Haggerty Brookhaven National Laboratory.
Itzhak Tserruya, July 7,  Towards HBD Proposal  Ongoing activities and plans for the next two months Itzhak Tserruya HBD meeting at BNL, September.
1 TPC R&D proposal from the WIS group I. Ravinovich WIS I. Ravinovich12/15/2015.
UCSC August 12, 2008 U.S. Upgrade R&D Meeting: Strip Detector  Seiden.
CERN Single Phase Prototype Initial Discussion on Power/Space Requirements Terri Shaw Neutrino Platform July 30, 2015.
Status of the PMT light detection system Gian Luca Raselli 20-AUG-2015 ICARUS executive meeting.
6-Aug-02Itzhak Tserruya PHENIX Upgrade mini-Workshop1 Boris Khachaturov, Alexander Kozlov, Ilia Ravinovich and Itzhak Tserruya Weizmann Institute, Israel.
HBD Status Craig Woody BNL DC Meeting October 3, 2007.
Endcap Signal Feedthrough Overview Endcap Signal Feedthroughs are constructed and tested in Victoria by Victoria and TRIUMF staff. Each feedthrough unit.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
Itzhak Tserruya, BNL, May13, HBD R&D Update: Demonstration of Hadron Blindness A. Kozlov, I. Ravinovich, L. Shekhtman and I. Tserruya Weizmann Institute,
HBD Status Report C. Woody For the HBD Crew DC Meeting June 13, 2007.
G. Carboni - Muon Meeting – Draft Agenda Muon Meeting 6 April 2004 Introduction (15 min) Total 15 min MWPC prodution Material supplies,
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
GEM tests at BNL Zvi, Sasha, Ilia and others. Triple GEM detector tests Last Tuesday after HBD meeting we exchanged CF4 by Ar/CO2 but still there were.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
1 Sasha Milov DC meeting Sept 12, 2007 HBD status Sasha Milov Sept 12, 2007.
1 HBD Update Back to the Future T.K. Hemmick for the HBD crew.
Update on the HBD Craig Woody BNL DC Meeting May 11, 2005.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
1 HBD Update Itzhak Tserruya Upgrades meeting, BNL, October 11, 2005 Full-scale Prototype status Safety Review Detector box construction GEM production.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
Executive Committee, Toronto August 3, 2005 TRT Barrel WBS 1.2/3.2 Harold Ogren Indiana University.
1 HBD: Responsibilities, Cost and Schedule Itzhak Tserruya EC/DC Meeting, BNL, March 9, 2005.
July 20, 2007Anita Topkar, BARC PSD Production: Present Status Dr Anita Topkar BARC.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
Micromegas projects and future tests Phone meeting August 26th, 2009.
MUSE NSF Review March 24, MUSE Project Management Ronald Ransome Rutgers The State University of New Jersey For the MUSE Collaboration.
ISTCInternational Science and technology Center, MoscowOfficial Coordinator BINPBudker Institute of Nuclear Physics of Siberian Branch of Russian Academy.
Weekly Wednesday Webinar
Upgrade activities at Clermont-Ferrand
The Long Range Plan: Cycle 17 update September 2009 Dave Adler
Thanks to all of you for this effort !
SCHEDULE Nov 1st - Assembly Table Complete
LHCb electronics, 12th June 2014
On the Prototype beam test: (I) Noise and signal extraction
Assignment Problem A balanced transportation problem in which
T.K. Hemmick for the Stony Brook Crew
EUDET Extended SC meeting 31 August 2009
Status of Readout Boards
Presentation transcript:

1 Installation Logistics Itzhak Tserruya HBD meeting BNL, July 6, 2006

2 Some thoughts on installation logistics (I) The preferable and only solution is to install first one HBD detector and a few weeks later the second one. First HBD: should be equipped with the existing GEMs in the DB (42 standard + 16 Au plated). All of them (with the exception of 1 standard GEM) have been shipped to SB together with 15 meshes. The quantity is large enough to play the gain uniformity optimization game. tip: do the optimization for 5 panels i.e. 10 detector modules and start installing from top, the last 2 modules at the lowest panel are totally outside the acceptance. target installation date: July 31 st ? August 7? August 14? SB and BNL Instrumentation should coordinate and decide on the target date. Will need a simple gas system for flushing at installation time. Conflict with the upgrade of the gas system?

3 Some thoughts on installation logistics (II) Second HBD: Time table for the second HBD is more uncertain. The next supply of GEMs (10 standard + 7 Au plated) from CERN is expected in the week of July 17, so by the end of July we should have in the DB enough GEMs for the second detector but not enough spares for the gain “optimization” game. The last batch of 30 GEMs (20 standard a+10 Au plated) is scheduled to be ready for shipment from CERN at the end of September. Rui is on vacations. Will negotiate with him an earlier supply once he returns to CERN on July 23. We may want to push the installation date of the second HBD as late as possible.