Doc.: IEEE 802 EC-12/0004r1 Agenda February 2012 Jon Rosdahl, CSRSlide 1 IEEE 802 EC Interim Telecon – Feb 7 2012 Date: 2012-02-07 Authors:

Slides:



Advertisements
Similar presentations
Doc.: IEEE EC-10/0016r1 Meeting Agenda Oct 2010 Jon Rosdahl, CSRSlide 1 EC Interim – 5 Oct 2010 Date: Authors:
Advertisements

Doc.: IEEE 802.EC-10/0015r0 Submission July 2010 Jon Rosdahl, CSRSlide EC Interim Meetings Proposal Date: Authors:
Doc.: IEEE 802 EC-11/0025r2 Report November 2011 Jon Rosdahl, CSRSlide 1 Executive Secretary Agenda Items Nov 2011 Date: Authors:
Doc.: IEEE 802 EC-11/0014r1 Submission July 2011 Jon Rosdahl, CSRSlide 1 Executive Secretary Agenda Items Nov 2011 Date: Authors:
Doc.: IEEE 802.EC-10/xxxxr0 Submission July 2010 Jon Rosdahl, CSRSlide EC Interim Meetings Date: Authors:
IEEE mc Closing Report for March 2015
P802.16q to Sponsor Ballot: Conditional Approval Request 17 July 2014 IEEE Gdoc.
IEEE802-EC_Interim_Teleconference_Report.ppt IEEE 802 EC Interim Teleconference Report from on two Sponsor Ballot Completions.
Doc.: IEEE /0677r0 Submission May 2015 Slide 1 IEEE ah Closing Report for May 2015 Date: Authors: Yongho Seok (NEWRACOM)
Doc.: IEEE /0696r0 Submission May 2014 Slide 1 IEEE ah Closing Report for May 2014 Date: Authors: Yongho Seok (LG Electronics)
Doc.: IEEE EC-10/0016r2 Meeting Agenda Oct 2010 Jon Rosdahl, CSRSlide 1 EC Interim – 5 Oct 2010 Date: Authors:
Doc.: Submission1 IEEE Motions in July Plenary DCN: Title: Request for Sponsor Ballot Approval for IEEE a.
Submission doc.: IEEE 802 EC-12/0018r1 June 2012 Jon Rosdahl, CSRSlide EC Interim Telecon June 5, 2012 Date: Authors:
Doc.: IEEE /0144r01 Submission February 2015 Apurva N. Mody, BAE SystemsSlide 1 IEEE Motion at the February EC Telecon IEEE P Wireless.
Doc.: IEEE /0792r0 Submission July 2008 Adrian Stephens, Intel CorporationSlide TGn Editor Report July 2008 Date: Authors:
Doc.: IEEE /0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 1 July 2009 Plenary Presentation from WG11 to 802 EC Date: Authors:
Doc.: IEEE /0775r0 Submission July 2009 Bruce Kraemer, MarvellSlide 1 TGn Closing Report - July 16 ‘09 Date: 2009-July-09 Authors: 5488 Marvell.
Doc.: Submission1 IEEE Motions in March Plenary DCN: Title: Request for EC Unconditional Approval Date Submitted:
Doc.: IEEE 802 EC-11/0014r0 Submission July 2011 Jon Rosdahl, CSRSlide 1 Executive Secretary Agenda Items July 2011 Date: Authors:
Doc.: IEEE /1187r0 Submission September 2015 Slide 1 IEEE ah Closing Report for September 2015 Date: Authors: Yongho Seok and.
Doc.: Submission July 2011 D. Denteneer (Philips), B.Kraemer (Marvell) Slide 1 P802.11s report to EC on request for approval to proceed to.
Doc.: IEEE /0023r00 SubmissionApurva N. Mody, BAE SystemsSlide 1 IEEE Motion at the July EC Closing Meeting IEEE P Wireless RANs.
Doc.: IEEE /1468r1 Submission July 2013 Adrian Stephens, Intel CorporationSlide November 2013 Motions to 802 EC Date: Authors:
Submission May 2016 doc.: Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [ e Status Report.
Month Year IEEE Motions in July, 2016 Plenary
Month Year IEEE Motions in July, 2017 Plenary
November 2008 doc.: IEEE /1437r1 July 2011
P802.11s report to EC on request for approval to proceed to RevCom
November 2008 doc.: IEEE /1437r1 July 2011
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s report to EC on request for approval to proceed to RevCom
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
TGn Chairs’ Closing Report Waikoloa, HI 802 Interim – Sep ‘07
P802.11aa Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z conditional approval report to ExCom
P802.16Rev4 to Sponsor Ballot: Conditional Approval Request
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
IEEE Motions at the November Plenary EC Meeting
IEEE Motions in July Plenary DCN:
IEEE Motion at the February EC Telecon
November 2010 doc.: IEEE /0872r4 November 2010
<month year> doc.: IEEE < e> <September 2018>
802.16m Opening (Final) Report
Month Year IEEE Motions in July Plenary DCN:
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
Closing IEEE 802 EC Friday 15th March 2019
IEEE Motion at the July EC Closing Meeting
IEEE TGmc Nov 2012 Agenda Date: Authors:
Closing IEEE 802 EC Friday 15th March 2019
Closing IEEE 802 EC Friday 15th March 2019
IEEE Motion at the February EC Telecon
November 2010 doc.: IEEE /0800r9 November 2010
IEEE P Working Group for Wireless Personal Area Networks
November 2008 doc.: IEEE /1437r1 August 2010
IEEE TGmb Sept 2011 Agenda Date: Authors:
Executive Secretary Agenda Items March 2012
Motion – ae UnConditional Approval to RevCom
TGn Editor Report Sept 2008 Date: Authors:
Motion via Ballot IEEE motion Motion for Approval to Start the Sponsor Ballot for IEEE P Revision Draft 5.0 Motion via Ballot.
Motion via Ballot Motion for Approval to Start the Sponsor Ballot for IEEE P Revision Draft 5.0 Motion via Ballot Motion Start: May.
Motion – P Rev/D2 to Sponsor Ballot
July 2011 EC Motions Date: Authors: July 2011
November 2010 doc.: IEEE /0800r9 November 2011
P b to RevCom: Conditional Approval Request
IEEE TGmc January 2016 Agenda
IEEE mc Closing Report for September 2016
P802.16Rev4 to Sponsor Ballot: Conditional Approval Request
Jan 2012 doc.: IEEE Jan aa –Robust Audio Video Transport Streaming Jacksonville Closing Report Date: Authors: Graham Smith,
IEEE mc Closing Report for May 2016
Presentation transcript:

doc.: IEEE 802 EC-12/0004r1 Agenda February 2012 Jon Rosdahl, CSRSlide 1 IEEE 802 EC Interim Telecon – Feb Date: Authors:

doc.: IEEE 802 EC-12/0004r1 Agenda February 2012 Jon Rosdahl, CSRSlide 2 Abstract Agenda and meeting slides for the Feb 7, 2012 EC interim telecon.

doc.: IEEE 802 EC-12/0004r1 Agenda February 2012 Jon Rosdahl, CSRSlide 3 Agenda – Feb 7, 2012; 1-3pm 1.Welcome/Intro/Approve Agenda – Nikolich 4 min 2.Report: Single Sales Channel Update – Nikolich 3 min 3.Report: Pending Appeal – – Nikolich 3 min 4.Report: Network RFP – Rosdahl 3 min 5.Report: March 2012 Waikoloa Meeting Plans – Rosdahl 3 min 6.Report: July 2013 Geneva Meeting Plans – Rosdahl 4 min 7.Report: – Sponsor Ballot Completions – Das 5 min 8.Motion: – Sponsor Ballot Request – Marks 5 min Motion: To forward IEEE P b/D2 for IEEE-SA Sponsor Ballot. 9. Motion: – Sponsor Ballot Completions – Kraemer 10 min Motion: To forward IEEE ae to RevCom Motion: To forward IEEE aa to RevCom 10. Update: November Workshop Action items – Kraemer 60 min 11. AOB 15 min

doc.: IEEE 802 EC-12/0004r1 Agenda February 2012 Jon Rosdahl, CSRSlide 4 1. Welcome/Intro/Approve Agenda Nikolich 4 min

doc.: IEEE 802 EC-12/0004r1 Agenda February 2012 Jon Rosdahl, CSRSlide 5 2. Report: Single Sales Channel Update – Nikolich 3 min Announced Standards available for $5.

doc.: IEEE 802 EC-12/0004r1 Agenda February 2012 Jon Rosdahl, CSRSlide 6 3. Report: Pending Appeal – Nikolich 3 min

doc.: IEEE 802 EC-12/0004r1 Agenda February 2012 Jon Rosdahl, CSRSlide 7 4. Report: Network RFP Rosdahl 3 min

doc.: IEEE 802 EC-12/0004r1 Agenda February 2012 Jon Rosdahl, CSRSlide 8 5. Report: March 2012 Waikoloa Meeting Plans Rosdahl 3 min

doc.: IEEE 802 EC-12/0004r1 Agenda February 2012 Jon Rosdahl, CSRSlide 9 6. Report: July 2013 Geneva Meeting Plans Rosdahl 4 min

doc.: IEEE 802 EC-12/0004r1 Agenda February 2012 Jon Rosdahl, CSRSlide Report: on two Sponsor Ballot Completions Das 5 min

doc.: IEEE 802 EC-12/0004r1 Agenda February 2012 Jon Rosdahl, CSRSlide 11 IEEE 802 EC Interim Teleconference Report from on two Sponsor Ballot Completions Subir Das Subir at appcomsci dot com Subir Das, Chair WG

doc.: IEEE 802 EC-12/0004r1 Agenda February 2012 Jon Rosdahl, CSRSlide 12 Background During the November 2011 closing plenary the IEEE 802 EC granted conditional approval for the IEEE802.21a and IEEE802.21b drafts to proceed to RevCom Full details of EC presentation are available at: details-and-motions a.pptx, and results-and-motions b.pptx details-and-motions a.pptx results-and-motions b.pptx Subir Das, Chair WG

doc.: IEEE 802 EC-12/0004r1 Agenda February 2012 Jon Rosdahl, CSRSlide 13 Sponsor Ballot Update The Ballot closed on December 08, 2011 The recirculation comments (editorial) are available at: 21a-comments.xls, and b-comments.xls 21a-comments.xlshttps://mentor.ieee.org/802.21/dcn/11/ sb-recirc b-comments.xls The comments associated with remaining disapproves and the WG responses are available at: – comments.xls and comments.xlshttps://mentor.ieee.org/802.21/dcn/11/ sec a-sb- comments.xlshttps://mentor.ieee.org/802.21/dcn/11/ bcst b-sb- comments.xls Subir Das, Chair WG

doc.: IEEE 802 EC-12/0004r1 Agenda February 2012 Jon Rosdahl, CSRSlide 14 Conditional Terms and Results As per LMSC OM Clause 14: - The Ballot occurred, in accordance with the tentative schedule presented to the EC.The recirculation running at the time conditional approval was granted completed on schedule. The additional recirculation shown on the plan is not required –The approval percentage is 98% for IEEE a (63 Approve, 1 Disapprove). –The approval percentage is 96% for IEEE b (60 Approve, 2 Disapprove). - There are no new DISAPPROVE votes No new valid DISAPPROVE comments on new issues that are not resolved to the satisfaction of the submitter from existing DISAPPROVE voters - During the last recirculation of IEEE a, we received an APPROVE vote from one DISAPPROVE voter - No new DISAPPROVE comments were received for IEEE802.21a and IEEE802.21b Subir Das, Chair WG

doc.: IEEE 802 EC-12/0004r1 Agenda February 2012 Jon Rosdahl, CSRSlide 15 Conclusion Based upon the results of the WG recirculation ballots on P802.21a/D6.0 and P802.21b/D6.0, the terms of the conditional approval have been met An was sent to EC reflector on December 09, 2011 IEEE802.21a and IEEE802.21b drafts are in RevCom’s March meeting agenda Subir Das, Chair WG

doc.: IEEE 802 EC-12/0004r1 Agenda February 2012 Jon Rosdahl, CSRSlide Motion: – Sponsor Ballot Request Marks 5 min The Working Group Letter Ballot on this draft currently stands at 100% approval. A recirc will close two days prior to the EC telecon, so Roger expects the approval request to be unconditional Motion: To forward IEEE P b/D2 for IEEE-SA Sponsor Ballot.

doc.: IEEE 802 EC-12/0004r1 Agenda February 2012 Jon Rosdahl, CSRSlide 17 Motion b Forward to Sponsor Ballot To forward IEEE P b/D2 for IEEE-SA Sponsor Ballot. Moved: Roger Marks Seconded: Jon Rosdahl Approve: Disapprove: Abstain: Roger Marks, Consensii LLC

doc.: IEEE 802 EC-12/0004r1 Agenda February 2012 Jon Rosdahl, CSRSlide Motion: – Sponsor Ballot Completions Kraemer 10 min ae – Completed Sponsor Letter Ballot 100% aa – Completed Sponsor Letter Ballot 100% Motion: To forward IEEE ae to RevCom Motion: To forward IEEE aa to RevCom

doc.: IEEE 802 EC-12/0004r1 Agenda February 2012 Jon Rosdahl, CSRSlide 19 Motion – aa (Robust Audio Video Transport Streams) UnConditional Approval to RevCom Grant Unconditional approval to forward P802.11aa to RevCom. Moved: Bruce Kraemer Seconded: Jon Rosdahl This project completed Sponsor Ballot on D9.0 on Jan 27, 2012 with zero comments and 100% approval. Document r3 is the report the requirements for unconditional approval to forward P802.11aa to RevCom. URL: 00aa-status-report-to-revcom-for-11aa.pptxhttps://mentor.ieee.org/802.11/dcn/12/ aa-status-report-to-revcom-for-11aa.pptx Slide 19 Bruce Kraemer, Marvell

doc.: IEEE 802 EC-12/0004r1 Agenda February 2012 Jon Rosdahl, CSRSlide 20 Motion – ae (Prioritization of Management Frames) UnConditional Approval to RevCom Grant Unconditional approval to forward P802.11ae to RevCom. Moved: Bruce Kraemer Seconded: Jon Rosdahl This project completed Sponsor ballot on Jan 04, 2012 with zero comments and 100% approval Document r1 is the report the requirements for unconditional approval to forward P802.11ae to RevCom was approved in the WG: 61/0/0 URL: request-to-proceed-to-revcom.ppthttps://mentor.ieee.org/802.11/dcn/12/ ae-excom- request-to-proceed-to-revcom.ppt Slide 20 Bruce Kraemer, Marvell

doc.: IEEE 802 EC-12/0004r1 Agenda February 2012 Jon Rosdahl, CSRSlide 21 10: Update: November Workshop Action items Kraemer 60 min Workshop Action items doc::EC-12/03r1 00EC-november-2011-ec-workshop-action-items.xls

doc.: IEEE 802 EC-12/0004r1 Agenda February 2012 Jon Rosdahl, CSRSlide AOB About 15 min

doc.: IEEE 802 EC-12/0004r1 Agenda February 2012 Jon Rosdahl, CSRSlide 23 References 00EC-november-2011-ec-workshop-action-items.xlshttps://mentor.ieee.org/802-ec/dcn/12/ec EC-november-2011-ec-workshop-action-items.xls request-to-proceed-to-revcom.ppthttps://mentor.ieee.org/802.11/dcn/12/ ae-excom- request-to-proceed-to-revcom.ppt report-to-revcom-for-11aa.pptxhttps://mentor.ieee.org/802.11/dcn/12/ aa-status- report-to-revcom-for-11aa.pptx report-to-802-ec-interim-teleconference.pptxhttps://mentor.ieee.org/802.21/dcn/12/ report-to-802-ec-interim-teleconference.pptx