1 Framework Programme 7 The Work Breakdown. 2 CONTENT  Work distribution across the consortium  Work breakdown into WPs and Tasks.

Slides:



Advertisements
Similar presentations
Portable and Predictable Performance on Heterogeneous Embedded Manycores (ARTEMIS ) ARTEMIS Project Review October 2014 WP1 “Management and IPR”
Advertisements

CIRAS PROJECT OVERVIEW
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
European Partnership for Action Against Cancer (EPAAC)
The EVIE Project Derek Sergeant Leeds University Library.
 Copyright 2005 Digital Enterprise Research Institute. All rights reserved. SemanticGov Project Overview and Objectives
The CrossGrid project Juha Alatalo Timo Koivusalo.
Advanced Data Mining and Integration Research for Europe ADMIRE – Framework 7 ICT ADMIRE Overview European Commission 7 th.
EC Review – 01/03/2002 – G. Zaquine – Quality Assurance – WP12 – CS-SI – n° 1 DataGrid Quality Assurance Gabriel Zaquine Quality Engineer - WP12 – CS-SI.
Project Management and Scheduling
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
Intelligent Content Management. 7th September 2005 The first Negotiation Meeting Brussels.
End User End User Product/ Service Product/ Service Commercial Prototype Commercial Prototype Technical Prototype Technical Prototype Applied Research.
TEMPUS IV- THIRD CALL FOR PROPOSALS Recommendation on how to make a good proposal TEMPUS INFORMATION DAYS Podgorica, MONTENEGRO 18 th December 2009.
1 Framework Programme 7 Guide for Applicants
MyOcean2 First Annual Meeting – April 2013 WP2.3 Service Engineering MyOcean2 First Annual Meeting – Cork /16-17 April 2013.
-Nikhil Bhatia 28 th October What is RUP? Central Elements of RUP Project Lifecycle Phases Six Engineering Disciplines Three Supporting Disciplines.
Mantychore Oct 2010 WP 7 Andrew Mackarel. Agenda 1. Scope of the WP 2. Mm distribution 3. The WP plan 4. Objectives 5. Deliverables 6. Deadlines 7. Partners.
IP-Based Emergency Applications and Services for Next Generation Networks PEACE Presented by Suji Gunaratne PhD.
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
Service Transition & Planning Service Validation & Testing
IST programme Cultural Heritage in Tomorrow ’s Knowledge Society FUTURE PLANS FP6 Cultural Heritage in Tomorrow ’s Knowledge Society FUTURE PLANS FP6 RRRESE.
EPOCA – 11. June EPOCAConsortiumOrganisation.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
 Copyright 2005 Digital Enterprise Research Institute. All rights reserved. Semantic Web services Interoperability for Geospatial decision.
 Copyright 2005 Digital Enterprise Research Institute. All rights reserved. Tomas Vitvar, Sanaullah Nazir SemanticGov.
Supported by the European Commission, grant agreement pending EUROSUPPORT V “Improving sexual and reproductive health of PLWH” Kick-off meeting, May 6-7,
VIRTUAL INFORMATION AND KNOWLEDGE ENVIRONMENT FRAMEWORK IP-FP
Eleventh Lecture Hour 9:30 – 10:20 am, Saturday, September 16 Software Management Disciplines Iterative Process Planning (from Part III, Chapter 10 of.
Dunstaffnage Marine Laboratory Oban, Argyll, Scotland PA37 1QA ECASA Kick-off Oban 8-9, December 2004.
TESTBED FOR FUTURE INTERNET SERVICES TEFIS at the EU-Canada Future Internet Workshop, March Annika Sällström – Botnia Living Lab at Centre for.
Georgia Institute of Technology CS 4320 Fall 2003.
Test Management Provides a rich and configurable global web platform for implementing a software development life cycle process with collaboration.
EVA Workshop, 26 March 2003, Florence, Italy1 COINE Cultural Objects In Networked Environments Anthi Baliou University of Macedonia,Library Thessaloniki,
Presentation to Quality and Performance Scrutiny Committee – 24 th June 2002 By Mike Willetts Head of
TESTING LEVELS Unit Testing Integration Testing System Testing Acceptance Testing.
Workpackage 2: Implementation Infrastructure. WP2: Objectives Main Objective of WP2: Integrated Optique Platform Main Objective of WP2: Integrated Optique.
ANKITHA CHOWDARY GARAPATI
Consortium building PHOENIX Training Course Laulasmaa, Estonia
ECOGEM Cooperative Advanced Driver Assistance System for Green Cars Burak ONUR Project Coordinator R&D Support Executive
 Copyright 2005 Digital Enterprise Research Institute. All rights reserved. Tomas Vitvar SemanticGov 3 rd Planetary.
Warszawa 18 luty th Framework Programme NMP - 2nd Calls Integrated Projects for SMEs Hervé Péro, Christophe Lesniak DG Research.
Structuring of work related competences in Chemical Engineering STRENGTH Leonardo da Vinci ToI Project ES1-LEO RESULT 7 STRENGTH Quality.
21 November 2013 Brussels Cristina Padeanu -PATIENT EVIDENCE WORKSHOP - JOINT ACTION ON PATIENT SAFETY AND QUALITY OF HEALTH CARE (PASQ) PROJECT.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 Governance.
Test Case A. B1 – Scientific and Technological Objectives and State-of-the-Art Rationale What is the problem to be solved? –Cumbersome back-office processes.
Software Project Management (SEWPZG622) BITS-WIPRO Collaborative Programme: MS in Software Engineering SECOND SEMESTER /1/ "The content of this.
The ICT Theme in FP7 Proposal evaluation The Evaluation criteria: Keys to success and reasons for failure - The Golden Rules.
Proposal Evaluation Practical Rules. Training Module: The MED-Dialogue project (611433) is co-funded by the European Community's ICT Programme under FP7.
EGEE JRU Workshop, Brussels, December 1 st, JRU RoGrid – Romanian Experience RoGrid Consortium RoGrid JRU set-up RoGrid JRU Implementation Internal.
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
Interim project evaluation August 2013 – June 2014.
1 WP7 Presentation WP7 -- Project Evaluation Computer Engineering and Networks Laboratory, ETH Zurich Lukas Ruf.
HP-PPM Work Plan Configuration Options Project & Time Management Version 7 Implementation Project\Work Plan and Time Management\Work Plan Configuraiton.ppt.
Software Production ( ) Lecture 3: Dr. Samer Odeh Hanna (PhD) office: 318.
RUP RATIONAL UNIFIED PROCESS Behnam Akbari 06 Oct
Atos, Atos and fish symbol, Atos Origin and fish symbol, Atos Consulting, and the fish symbol itself are registered trademarks of Atos Origin SA. June.
CENTRAL EUROPE PROGRAMME Workshop B Preparation of an application: FOCUS ON BUDGET Project development seminar Prague, 2 nd February 2010 Luca.
This project and the research leading to these results has received funding from the European Community’s Seventh Framework Programme [FP7 / ]
P3 Business Analysis. 2 Section F: Project Management F1.The nature of projects F2. Building the Business Case F4. Planning,monitoring and controlling.
ARTEMIS Industry Association Title Presentation - 1 DEMANES Design, Monitoring and Operation of Adaptive Networked Embedded System Matthijs Leeuw
ARTEMIS Industry Association Title Presentation - 1 e.g. SCALOPES e.g. SCAlable LOw Power Embedded PlatformS.
1 The XMSF Profile Overlay to the FEDEP Dr. Katherine L. Morse, SAIC Mr. Robert Lutz, JHU APL
Project Management PTM721S
IEEE Std 1074: Standard for Software Lifecycle
Planning Phase: Project Control and Deliverables
Funded by the Erasmus+ Programme EPP JO-EPPKA2-CBHE-JP Lina Tsakalou
OBJECT-ORIENTED APPROACH TO OFFICIAL STATISTICS
Helene Skikos DG Education and Culture
BLENDED LEARNING TRANSFER Confindustria Veneto SIAV Spa
Presentation transcript:

1 Framework Programme 7 The Work Breakdown

2 CONTENT  Work distribution across the consortium  Work breakdown into WPs and Tasks

3 Planning 1: Work distribution The right partners The role of each partner Dividing the work among partners accordingly Assigning responsibilities to each partner Allocating resources to partners You cannot do everything yourself ! Partnership means sharing the work, the responsibilities and the budget (funding). Define a responsibility matrix

4 Responsibility Matrix 1/2 X = involved X X X X X subsystem 2 implementation system design subsystem 1 implementation subsystem 3 implementation system integration E-Services Inc COORD. Universal Software Ltd Integration S.A. X X XX R = responsible A = approving P = producing P R/P A A PR/A subsystem 2 implementation system design subsystem 1 implementation subsystem 3 implementation system integration E-Services Inc COORD. Universal Software Ltd Integration S.A. Even the Coordinator has to report to another partner for some WPs

5 Responsibility Matrix 2/2 Once involvement and roles are defined, the effort can be allocated: subsystem 2 implementation system design subsystem 1 implementation subsystem 3 implementation system integration E-Services Inc COORD. Universal Software Ltd Integration S.A.

6 Planning 2: Work breakdown The Work Breakdown (WPs, Tasks, Timing, Dependencies) Allocating resources Divide the overall objective into sub-objectives or components => Workpackage Define the steps needed to achieve each Workpackage => Tasks Define the dependencies between WPs. Resources should be estimated by the partners doing the specific work.

7 Work Breakdown Example “The overall objective of “E-gov” to develop, test and validate a semantically-enriched platform that will facilitate the consistent composition, re-configuration and evolution of e-government services.” WP1 E-Gov Service life-cycle ontology WP2 Investigation & Analysis of PA Services WP3 User Requirements & Specifications WP4 Development of E-govManagement System WP5 Development of E-govService Configuration System WP6 Integration & Deployment WP7 Trial planning, execution & evaluation WP8 Dissemination & Exploitation WP9 Project Management

8 Effort Distribution Distribution of Effort over Workpackages and Partners: Identifying weaknesses in a workplan. WP1WP2WP3WP4WP5WP6 P P P P P P6628 P7628 Total

9 The workpackage that nobody wanted WP1WP2WP3WP4WP5WP6 P P P P P P6628 P7628 Total

10 The workpackage that does too much WP1WP2WP3WP4WP5WP6 P P P P P P6628 P7628 Total

11 The partner who didn’t know what to do WP1WP2WP3WP4WP5WP6 P P P P P P6628 P7628 Total

12 The token SME WP1WP2WP3WP4WP5WP6 P P P P P P6628 P7628 Total

13 …and New Member State WP1WP2WP3WP4WP5WP6 P P P P P P6628 P7628 Total

14 Questions ?