Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 WP7 Presentation WP7 -- Project Evaluation Computer Engineering and Networks Laboratory, ETH Zurich Lukas Ruf.

Similar presentations


Presentation on theme: "1 WP7 Presentation WP7 -- Project Evaluation Computer Engineering and Networks Laboratory, ETH Zurich Lukas Ruf."— Presentation transcript:

1 1 WP7 Presentation WP7 -- Project Evaluation Computer Engineering and Networks Laboratory, ETH Zurich Lukas Ruf

2 2 WP7 Presentation Agenda Task description Monitoring process –Assessment of deliverables –Assessment of WP performance Structure of Deliverable R7.1A “Interim Evaluation Report #1”

3 3 WP7 Presentation WP7 -- Objectives according to Technical Annex Evaluation and Monitoring Project Evaluation: 1. pedagogical 2. technical WP Monitoring: 1. objective fulfilment 2. quality assessment

4 4 WP7 Presentation Phase 1 Tasks 7.02 (active) Interim report #1 (due 01/08/00) –Quality assessment framework –Definition of quality assessment criteria and parameters for each WP and the whole project.

5 5 WP7 Presentation Phase 1 Tasks 7.03 (planned) Interim Report #2 (due 31/12/00) –Non-WP-related objects and metrics –Guidelines for the evaluation of Y1 user trials –Evaluation of project progress

6 6 WP7 Presentation Assessment of Project Objectives Project objectives –Objective #4 contributes to #2 Shifting of objectives –WP 1 #3 “Define service elements … to enable mutual recognition by HE …” should be done by WP5. –WP 2 #6 “Ensure understanding of benefits …” should be done by WP5, too.

7 7 WP7 Presentation Assessment of Project Objectives Breakdown of objectives and definition of corresponding measures –will be done for user trials only; –because WP1, WP3 and WP4 contribute to the achievement of objectives of WP2.

8 8 WP7 Presentation Monitoring Procedure Deliverable quality assessment –3 stages –1st: Internal quality assessment by those who wrote the deliverable –2nd: External quality assessment by means of “peer review” (might be WP7 or other project partners) –3nd: External quality assessment by EU

9 9 WP7 Presentation Monitoring Procedure Deliverable quality assessment: Implementation –WP7 allocates resources for review. –WP makes deliverable available to WP7 at least a week before due date.

10 10 WP7 Presentation Decisions Agree on the outlined deliverable monitoring procedure. Agree on measures for project objectives among all partners.


Download ppt "1 WP7 Presentation WP7 -- Project Evaluation Computer Engineering and Networks Laboratory, ETH Zurich Lukas Ruf."

Similar presentations


Ads by Google