F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.

Slides:



Advertisements
Similar presentations
Proton Beam Measurements in the Recycler Duncan Scott On Behalf of the Main Injector Group.
Advertisements

1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Run II Status and Prospects - Spalding1 Run II Status and Prospects Jeff Spalding Fermilab June 14, 2004.
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on.
Paul Derwent 30 Nov 00 1 The Fermilab Accelerator Complex o Series of presentations  Overview of FNAL Accelerator Complex  Antiprotons: Stochastic Cooling.
F UEC - 6 Oct 06 Recent FNAL Collider Operations Ron Moore Fermilab – Tevatron Dept.
F All Experimenters' Mtg - 9 Jun 03 Week in Review: 06/02/03 –06/09/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
1 Electron Cloud Measurements at the Fermilab Main Injector Bob Zwaska Fermilab ECloud07 Workshop April 9, 2007.
Proton Plans at Fermilab Robert Zwaska - Fermilab Science and Engineering at Henderson- DUSEL Capstone Workshop Stony Brook University May 5, 2006 Outline.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
Antiproton Source Capabilities and Issues Keith Gollwitzer & Valeri Lebedev Accelerator Division Fermilab 1.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
INTRODUCTION  RECYCLER BPM – Original system not adequate to measure beam position precisely. It is being upgraded to meet the required physics precision.
Proton Plan Director’s Review 8/15/06 Prebys 2006 Shutdown Eric Prebys, FNAL Accelerator Division.
Recycler Status and Plans Shekhar Mishra MID/Beams Division Fermilab AAC Review 2/4/03 Introduction to the Recycler Ring Recycler Improvements and status.
F Antiproton Source Apertures Steve Werkema DOE Tevatron Operations Review March 22, 2006.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
Ff NO A Accelerator Upgrades: Status Phil Adamson Fermilab
Proton Study Meeting 4/19/05 Eric Prebys 1 Proton Plan Stage I Eric Prebys.
F All Experimenters' Mtg - 28 Jul 03 Week in Review: 07/21/03 –07/28/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
F 19 August 2002 All Experimenters Meeting Beams Week in Review Continued to work on providing Luminosity L  N p N a /  –Stacking rate –Coalescing efficiency.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Booster Cogging Bob Zwaska University of Texas at Austin Bill Pellico FNAL.
Run II Operational Status and Plans Run II Meeting October 28, 2004 Dave McGinnis.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
All Experimenters' Mtg - Aug. 04, 2003 Week in Review: 07/28/03 –08/03/03 Doug Moehs – FNAL Stores and Operations Summary Standard Plots.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
S. Pordes - to part of CD 09/10/031 Introduction to some Beams Division jargon in some order…see how far we get:
Accelerator Issues Fermilab Antiproton Experiment Keith Gollwitzer Antiproton Source Department Accelerator Division Fermilab.
F All Experimenters' Mtg - 03 Mar 03 Week in Review: 02/24/03 –03/02/03 Ron Moore – FNAL Store Summary / What went wrong Tev Studies Highlights Tev Ground.
AP2 Line & Debuncher Studies Status Keith Gollwitzer Antiproton Source January 9, 2006 Many people involved with providing the hardware and software that.
F All Experimenters' Mtg - 07 Jul 03 Week in Review: 06/30/03 –07/07/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
F All Experimenters' Mtg - 27 Jan 03 Week in Review: 01/20/03 -01/26/03 Ron Moore – FNAL Found obstacle in AP-1 line Replacing corroded Tevatron dipole.
Recent Work Towards Increasing the AP2 & Debuncher Aperture – Keith Gollwitzer – May 9, Recent Work Towards Increasing the AP2 & Debuncher Aperture.
Fermilab Run 2 Accelerator Status and Upgrades
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Antiproton Acceptance Keith Gollwitzer Dept. of Energy Review March 30, 2005.
Proton Plan Expectations Eric Prebys AD/Proton Source.
Run II PMG 1/19/06 Pushpa Bhat 1 Run II Upgrades Status January 2006 Pushpa Bhat.
Dave Johnson July 12, 2010 NOvA/ANU Recycler Upgrades Review Optics, Apertures, and Operations Nova-doc 4930.
Main Injector Beam Position Monitor Upgrade: Status and Plans Rob Kutschke All Experimenters’ Meeting April 3, 2006 Beams-doc-2217-v3.
Status of the AP2 Optics Keith Gollwitzer Antiproton Source Department November 19, 2004.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
Proton Planning Eric Prebys FNAL Accelerator Division.
Dave Johnson July 12, 2010 NOvA/ANU Recycler Upgrades Review Optics, Apertures, and Operations Nova-doc 4930.
Early Beam Injection Scheme for the Fermilab Booster: A Path for Intensity Upgrade Chandra Bhat Fermi National Accelerator Laboratory DPF2015, ANN ARBOR,
All Experimenters’ Meeting September 23, Accelerator Operation Summary Calendar Week # 38 NuMI Weekly Integrated Intensity 4.57 E18 protons BNB.
F Record luminosities at the Tevatron & Future potentiality Steve Werkema Fermi National Accelerator Laboratory Batavia, Illinois USA Asian Particle Accelerator.
F All Experimenters' Mtg - 24 Feb 03 Week in Review: 02/17/03 –02/23/03 Ron Moore – FNAL Store Summary Failed Tev dipole disassembly Schedule for Week.
F Possible Proton Capabilities at Fermilab Dave McGinnis April 16, 2007.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
F HCP 2007 Performance and Future of the Tevatron Ron Moore Fermilab - Tevatron Dept. Tevatron overview and performance Antiproton source + Recycler overview.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
F All Experimenters' Mtg - 6 Jan 03 Week in Review: 12/30/02 –1/05/03 Ron Moore – FNAL Store Summary – Best week! > 7 pb -1 Machine Studies/Maintenance.
Pbar Production Status & Plans to get to 25mA/hr Keith Gollwitzer Antiproton Source August 31, 2006.
Run II Status Keith Gollwitzer Temple Review July 1, 2003.
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
MI/RR Operation Status Ioanis Kourbanis August 21, 2014.
Brian Drendel May 21, Stacking Pbars stacked: E10 Time stacking: Hr Average stacking rate: E10/Hr Uptime Number of pulses.
Weekly Pbar Report 10/2 → 10/9. Stacking This Week …
Slip stacking in Recycler Ioanis Kourbanis 9/14/11.
Weekly Pbar Report 10/26 → 11/2. Stacking This Week …
MI/RR Status January 3, 2014 D. Capista. MI Preformance.
Friday, Feb 12, 2010 Accelerator Status1 Accelerator Week in Review Part I: Regular 9am Scheduling Meeting –Crew Chief Summary –24 hour machine summaries.
Recycler Operation and studies Week Nov. 10- Nov Meiqin Xiao.
Pre-Meeting Meeting Brian Drendel Accelerator Shift Plot.
Stores and Operations Summary Standard Plots
Presentation transcript:

f All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots

f All Experimenters' Mtg - 2 Jun 03K. Gollwitzer - FNAL2 Stores Summary Store Initial Lum. (E30) Deliv’d Lum. (nb -1 ) Termination Duration (hr) Comments Intentional mA Stack; EOS studies Intentional6.5 99mA Stack; Large pbar losses Intentional mA Stack; Large pbar losses Intentional mA Stack Intentional mA Stack Abort-115mA Stack; begin of ramp Intentional mA Stack On Going 112mA Stack Store counts for next week

f All Experimenters' Mtg - 2 Jun 03K. Gollwitzer - FNAL3 TeV Summary Fixes –T:HE17 Trips that caused quenches Bad cable connector inside of relay rack –Trim power supplies LLRF filter to remove 100Hz –Small tune changes at 980GeV stop pbars from being coherent Studies –2 studies looking at injection line matching and vertical dispersion –Lattice measurements at flat-top & low beta –Tunes as a function of octuple and helix separation –Confirmed that F0 lambertson is now largest impedance –Much checkout of ramps (coupling, chromaticity…) –BPM characterization

f All Experimenters' Mtg - 2 Jun 03K. Gollwitzer - FNAL4 Moving F0 Lambertson Coherent Beam Current Lambertson Position

f All Experimenters' Mtg - 2 Jun 03K. Gollwitzer - FNAL5 Main Injector & Recycler MI studies –Slip Stacking –2.5MHz acceleration –NUMI multibatch Recycler Accesses –RGA scans to confirm locality of contamination –Replacement of contaminated vacuum gate valve –Removal of leaking stochastic cooling tank Recycler studies –Vacuum as function of beam intensity –RF manipulation and longitudinal emittance growth –General recovery from access work

f All Experimenters' Mtg - 2 Jun 03K. Gollwitzer - FNAL6 NUMI Multibatch 84 Booster Bunches 9 Beam Turns 6 Booster Batches Intensity > 2E13

f All Experimenters' Mtg - 2 Jun 03K. Gollwitzer - FNAL7 Antiproton Source Problems –2 Lithium Lens replacements Most pulses (20 months of service); transformer went bad Installation error led to early demise of lens –Lens water system problems (conductivity cell & valve) –Bad AP3 shunt caused bad transfers for 2 shots –Water pump broke  lost stack Broke a dipole and 2 quad shunts Studies –Tunes across Accumulator aperture –Measurement of the Accumulator momentum aperture –Quad BPM study –Extraction lattice measurements –Fast stacking

f All Experimenters' Mtg - 2 Jun 03K. Gollwitzer - FNAL9 Attempt at Fast Stacking Stack cycle from 2.4 to 2.0 sec Stack rate remains the same Pbar production decreases Goal is to increase stack rate by shortening cycle time and decreasing ARF1 bucket area. The tradeoff: leaving more pbars on injection orbit

f All Experimenters' Mtg - 2 Jun 03K. Gollwitzer - FNAL10 Proton Source & SY120 Proton Source –LRF Tubes One of BNL spares delivered to FNAL LRF5 Rested when possible; has been replaced today Back to no spares –Concern with hot areas of Booster SY120 –Three studies periods Extract beam on $21 but no evidence of proton beam in P3 line See beam spray on P3 multiwires Magnet polarities checked during access Steering/alignment is suspect

f All Experimenters' Mtg - 2 Jun 03K. Gollwitzer - FNAL11 Narrow in P1 and P2; wide beam in P3 P1 and P2 wires P3 wires

f All Experimenters' Mtg - 2 Jun 03K. Gollwitzer - FNAL12 Study week + shutdown week = average week ? Quench – Beginning of ramp Shutdown Studies Investigation of poor pbar efficiency

f All Experimenters' Mtg - 2 Jun 03K. Gollwitzer - FNAL14 Integrated Luminosity & Goals Goal curves were defined in Oct 02

f All Experimenters' Mtg - 2 Jun 03K. Gollwitzer - FNAL16 Brief Summary Two weeks –Short accesses –Study Shifts –Some running and a holiday weekend –Shutdown –Recovery Goal for this week –Stack and Store