LTE Measurement Monitor and Trace (MMT) Application.

Slides:



Advertisements
Similar presentations
DATA ANALYTICS. NORMS Cell Phones on Vibrate Respect all opinions.
Advertisements

AIMSweb Progress Monitor Online User Training
AP PRMT Confidential Proprietary 1 2 Main Characteristics & Benefits.
LTE-A Carrier Aggregation
1 Project Planning with MS Project Kishore October 2002 Notes available in the presentation: To view notes download the presentation and select View->
Using iRubric Software August 26, 2:00 pm. Overview How to Access iRubric Build a rubric Attach a rubric Grade with a rubric We will also discuss Reporting.
MyFloridaMarketPlace Analysis 2.0 Functional Overview December 18 - December 19, 2007.
Chapter 11 - Monitoring Server Performance1 Ch. 11 – Monitoring Server Performance MIS 431 – created Spring 2006.
Macros Tutorial Week 20. Objectives By the end of this tutorial you should understand how to: Create macros Assign macros to events Associate macros with.
MCITP Guide to Microsoft Windows Server 2008 Server Administration (Exam #70-646) Chapter 14 Server and Network Monitoring.
March 28, 2012 Deborah Barksdale OSI Contractor Training.
Document Number ETH West Diamond Avenue - Third Floor, Gaithersburg, MD Phone: (301) Fax: (301)
LATTICE TECHNOLOGY, INC. For Version 10.0 and later XVL Web Master Advanced Tutorial For Version 10.0 and later.
FixViewer Making FIX Support Manageable FixViewer.
70-290: MCSE Guide to Managing a Microsoft Windows Server 2003 Environment, Enhanced Chapter 11: Monitoring Server Performance.
Using Advanced Formatting and Analysis Tools. 2 Working with Grouped Worksheets: Grouping Worksheets  Data is entered simultaneously on all worksheets.
Office 2003 Post-Advanced Concepts and Techniques M i c r o s o f t Excel Project 8 Formula Auditing, Data Validation, and Complex Problem Solving.
QUALCOMM PROPRIETARY QUALCOMM Corporate R & D1 Performance of VoIP Services over 3GPP WCDMA Networks Ozcan Ozturk Qualcomm.
1 Contents Design on BCH Document Number: IEEE C802.16m-09/0327r1 Date Submitted: Source: Doo-hyun Sung Heejeong Cho.
National Levee Database Interactive Reports Instructions NLD Point of Contact 1 US Army Corps of Engineers.
1 Hybrid ARQ Operation for IEEE m IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16m-08/454 Date Submitted:
 SpS Auditing updated to record name rather than reference Staff ID  Staff accounts can be deleted even if SpS activity  Deleting Staff updated with.
The material contained in this document is proprietary to Triniti Corporation (Triniti). This material may not be disclosed, duplicated or otherwise revealed,
CFM S4 Cloud iQ Guide THE FUTURE OF CASH AUTOMATION.
HARQ Processing Time (AWD ) Document Number: IEEE C802.16m-09/1459 Date Submitted: Source: Aran
Excel part 5 Working with Excel Tables, PivotTables, and PivotCharts.
HARQ Architecture (Protocol and Timing) in IEEE m Document Number: IEEE S802.16m-08/411 Date Submitted: Source: Doo-hyun Sung, Hyungho.
6/ EN/LZU Rev A WCDMA Air Interface Part 6: 1 of 17 WCDMA Air Interface Training Part 6 WCDMA TDD Mode.
Day 3 RTD Tool Features and Concepts. Archives Archives are folder locations which are mapped into RTD RTD then can locate folders This has several benefits.
Important! Be sure to connect the communication cable to your computer before opening the Aqua4Plus Lite software. (Click to continue)
TDD frame structure for m with legacy support IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE S80216m-07/215r1 Date Submitted:
Project Planning Defining the project Software specification Development stages Software testing.
1 of 6 This document is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS OR IMPLIED, IN THIS DOCUMENT. © 2007 Microsoft Corporation.
MD8430A DEMO CONFIGURATION Demo Procedure 1 - Full stack data testing The demonstration scenario will show the following:  Full attach and default bearer.
Long Term Evolution Protocols
Text Proposal of PC-A-MAP IE Assignment in IEEE D4 (16.3.6) Document Number: IEEE C802.16m-10/xxxx+8 Date Submitted: Source: Yu-Hao Chang,
MyFloridaMarketPlace Analysis 2.0 Functional Overview.
Clarification of the scope of the study on latency reduction techniques for LTE 3GPP TSG RAN Meeting #71RP-16xxxx Göteborg, Sweden, March , 2016.
WF on MCOT limit Signaling and Modifying LBT type Ericsson, … 3GPP TSG RAN WG1 #85 R1-16xxxx Nanjing, China 23 rd – 27 th May 2016 Agenda item:
LTE Introduction Tzu-chin Liu 15th March 2012.
[A-MAP relevance and HARQ timing for long TTI transmission (Section )] IEEE Presentation Submission Template (Rev. 9) Document Number:
© 2015 Ex Libris | Confidential & Proprietary Yoel Kortick | Senior Librarian Primo Analytics.
Offline Discussion on remaining details about RACH Procedure
Single Tx switched UL DRAFT 3GPP RAN #77 September , 2017
Product Training Program
Summary of proposals on CBG-based retransmission
Proposal for Downlink HARQ Scheme
WF on single Tx switched UL
WF on Beam Indication for Beam Management
WF on NB-IoT Radio Link Monitoring Performance Test Procedure
R : SRS Enhancements for LTE-A
How to Convert VOB to MP4 with VOB to MP4 Converter
Summary on CA Aspects Samsung 3GPP TSG RAN WG1#91
Introduction to Key LTE TDD Features: Beamforming
Summary on CA Aspects Samsung 3GPP TSG RAN WG1#91
Intra LTE Handover.
EXECUTIVE SUMMARY CA combinations are divided into intra-band (contiguous and non-contiguous) and inter-band. Aggregated carriers can be adjacent or non-adjacent.
Analysis and Evaluation of a New MAC Protocol
TESTNG TECHNIQUES FOR NB-IOT PHYSICAL LAYER
Managing Rosters Screener Training Module Module 5
WF on LTE-NR Coexistence
Hardware Hash Quality Assurance Tool V2
Hybrid ARQ Operation for IEEE m
HARQ Timing Document Number: IEEE C802.16m-09/0287
HARQ Feedback Channel for 2bit HARQ feedback
3GPP RAN1 status on NR-Unlicensed
Testers and analyzers in LTE
Status of NR-U - Wi-Fi coexistence
Radio Link Layer tuning in HSPA Evolution Laura Kneckt Supervisor : Professor Jyri Hämäläinen Instructor: M. Sc. Stefan Wager.
Jing Sun, Qualcomm Incorporated Rapporteur of Rel.16 NR-U Work Item
Presentation transcript:

LTE Measurement Monitor and Trace (MMT) Application

Agenda To Do

Measurement, Monitor and Trace Application MMT provides:  Detailed low-level debug L1 and 2 statistics measurements, Phy, MAC HARQ, Throughput, CQI, RLC, PDCP etc Monitor of all power levels and timing errors Runtime, real time MSC logging of all data and primitives Runtime control of trace logging Post process of all L1 information including DL/UL DCIs, PUCCH SRs, CQI, PMI,RI etc.

Measurement window

Monitor Window

Trace Window

Trace post process tool Post process of binary log for detailed DL and UL analysis Analysis contains very detailed information on a TTI-TTI basis

How to get the elementary information from MMT trace

1. How to get the elementary information Using the LTE-PHY-DATA-REQ-OPT Window to get the almost elementary information.LTE-PHY-DATA-REQ-OPT Window Refer to the “Control Software Operation Guide” to get the detailed explanation.Control Software Operation Guide “ MD8430A Easy-to-understand Signalling Tester (Control Software Operation Guide)” – Appendix A Option Information section Using the PRIM_HEAD Window to get the activation time of primitive.PRIM_HEAD Window confidential MCB-1QST11067

LTE-PHY-DATA-REQ-OPT Window MCB-1QST11067 confidential Parameters

LTE-PHY-DATA-REQ-OPT Parameter The elementary information of low lay MCB-1QST11067 confidential Back

Appendix A Option Information section of Control Software Operation Guide Appendix A Option Information section confidential MCB-1QST11067 Back MD8430A_Control_Software_Operation_Guide_e_23.pdf

PRIM_HEAD Window MCB-1QST11067 confidential Set “-”

Part 2 How to get the advanced information from MMT trace

2.1 Enable/display the advanced information Set “Capture Filter Switch” and “Display Filter Switch” to OFF as below for enabling/displaying the advanced information. The above setting should be applied after staring scenario, because of the setting will be neglected, if set it before starting scenario. confidential MCB-1QST11067

2.2 Use the Trace log conversion program to create the CSV file format. The Trace log conversion program converts the measurement result for the physical channel in the Trace log file saved in binary format to CSV files format as below. Drag and drop the saved trace log file onto the shortcut Trace Converter in C:\MX843010\Trace.. confidential MCB-1QST11067

2.3 Get the advanced information from the created CSV files The following CSV files will be created by conversion program. The almost advanced information are included in the Downlink/ Uplink Report information file. Refer to the “Control Software Operation Guide” to get the detailed explanation.Control Software Operation Guide “ MD8430A Easy-to-understand Signalling Tester (Control Software Operation Guide)” - Offline Measurement Using Trace Log section confidential MCB-1QST11067

Offline Measurement Using Trace Log section of Control Software Operation Guide Offline Measurement Using Trace Log section confidential MCB-1QST11067 MD8430A_Control_Software_Operation_Guide_e_23.pdf

Part 3 Practice

3.Practice UE eNB DCI & DL Message SR UL grant HARQ-ACK UL Message HARQ-ACK How to get DCI ? How to get UL HARQ Feedback ? How to get SR? How to get UL grant ? How to get DL HARQ Feedback (HI)? Generally, We only can catch some limited information from MMT trace. However, that is not enough for us to debug or further confirm eNB/UE behavior, So, We should get more information like DCI, UCI and so on. That is not enough ! confidential MCB-1QST11067

3.1 How to get DCI Open the “ ” file and find DCI according [SFN, Subframe] and [Progress Time] as below. Get [SFN, Subframe] and [Progress Time] of target from trace. -Apply the excel filtering at the 1st row of data. -Set the “System Frame Number” column to “363”, “Sub Frame Number” column to “1”. -Determine the row by “24.1”, if multiple rows have been filtered. -Find the DCI information at “DCI ” column. UEeNB DCI & DL Message confidential MCB-1QST11067

3.2 How to get UL HARQ Feedback Get [SFN, Subframe] and [Progress Time] of target from trace. Calculate Timing of the UL HARQ Feedback by [SFN, Subframe] as below. -FDD [SFN, Subframe] + 4 subframe -TDD [SFN, Subframe] + x subframe, x is depend on TDD UL-DL configuration (Refer to TS ) -Apply the excel filtering at the 1st row of data. -Set the “System Frame Number of UCI ” column to “363” the “Sub Frame Number of UCI ” column to “1+4 = 5 ”. -Determine the row by “24.1”, if multiple rows have been filtered. -Find UL HARQ Feedback at the “HARQ-AN of Received value of DCI ” column. UEeNB DCI & DL Message ACK confidential MCB-1QST11067 Open the “ ” file and find DCI according calculated values and [Progress Time] as below.

Open the “ ” file and find DCI according [SFN] and [Progress Time] as below. 3.3 How to get SR Get [SFN] and [Progress Time] of target from trace. -Apply the excel filtering at the 1st row of data. - Set the “System Frame Number of UCI ” column to the value less than or equal to “366” -Determine the row by “24.1”, if multiple rows have been filtered. -Set “1” at “SR of Received value of DCI ” column. UEeNB DCI & DL Message ACK SR UL Message confidential MCB-1QST11067

How to calculate SR Timing SFN[0-1023]Slot index [0-19] TS rrcConnectionSetup →Scheduling RequestConfig + sr-ConfigurationIndex = confidential MCB-1QST11067

3.4 How to get UL grant Get [SFN, Subframe] and [Progress Time] of target from trace. Open the “ ” file and find DCI according calculated values and [Progress Time] as below. -Apply the excel filtering at the 1st row of data. -Determine the row by “24.1”, if multiple rows have been filtered. Calculate Timing of the UL grant by [SFN, Subframe] as below. -FDD [SFN, Subframe] - 4 subframe -TDD [SFN, Subframe] - x subframe, x is depend on TDD UL-DL configuration (Refer to Table 8-2 of TS36.213) UEeNB DCI & DL Message ACK SR UL Message UL grant -Set the “System Frame Number” column to “365”, the “Sub Frame Number” column to “9”. -Find the UL grant at “DCI ” column. -Set the “DCI Format” column to “DCI FORMAT_0” MCB-1QST11067

3.5 How to get DL HARQ Feedback (HI) Get [SFN, Subframe] and [Progress Time] of target from trace. -Apply the excel filtering at the 1st row of data. -Determine the row by “24.1”, if multiple rows have been filtered. Calculate Timing of the UL grant by [SFN, Subframe] as below. -FDD [SFN, Subframe] + 4 subframe -TDD [SFN, Subframe] + x subframe, x is depend on TDD UL-DL configuration (Refer to TS ) -Set the “System Frame Number” column to “366”, the “Sub Frame Number” column to “3+4=7”. -Find the DL HARQ Feedback at the “HARQ Indicator of HI” column. UEeNB DCI & DL Message ACK SR UL Message UL grant ACK(HI) confidential MCB-1QST11067 Open the “ ” file and find DCI according calculated values and [Progress Time] as below.

Add trace converter GUI