Jesus A. Guerra, P.E. Distribution System Reliability CenterPoint Energy SWEDE 2011.

Slides:



Advertisements
Similar presentations
Use of Rubber Gloves & Protectors for Underground Cable Splicing
Advertisements

Summary of Second Draft of the NERC Standard PRC Disturbance Monitoring and Reporting JSIS Meeting August 10, 2010 Salt Lake City, UT.
A Path breaking Technology for Network Maintenance and Optimization
October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
Company LOGO Cleco Planning Process. Models Cleco uses SPP’s annual series of models to determine the NERC reliability violations. Cleco uses SPP or VST.
Transmission Transporting Electricity by Wire Darcy Neigum Montana-Dakota Utilities Co.
Stray Current Investigations A Method of Troubleshooting Stray Current on Underground Residential Distribution (URD) Loops Stacey Mighty Malcolm Distribution.
1 Pacific Gas & Electric Company MTS: Evolution of the Electric Distribution System Manho Yeung, Senior Director, System Planning and Reliability PG&E.
Energy Delivery Delivering energy safely, reliably, efficiently and affordably. Holland Bottom 500/161/115kV Substation.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
1 1 Substation Asset Strategy Kevin Dasso, Senior Director Engineering and Operations IEEE/PES Annual Substations Committee Meeting April 7, 2008.
BRAZOS ELECTRIC COOPERATIVE Dobbin 345 Project David Albers, P.E. Manager – System Planning.
IMPACTS OF LARGE DISTRIBUTED GENERATORS ON CENTERPOINT ENERGY’S DISTRIBUTION SYSTEM 1 Presented by Ed Briggs, P.E. Manager of Electric Distribution Planning.
RiversidePublicUtilities.com Arts & Innovation RiversidePublicUtilities.com Challenges and Solutions for Large-Scale PV Integration on RPU’s Distribution.
Disconnect Switches There are many purposes for disconnect switches in substations and power lines. They are used to isolate or deenergize equipment for.
1 Green River Utah Area Transmission and Distribution System – January 16, 2009.
THE ELECTRIC SUB STATION
AFCI Reaction to Utility Events. CenterPoint Energy 35 KV Distribution Capacitor Bank – Switched through an automated system.
APPA Engineering and Operations Technical Conference Atlanta, Georgia April 13-18, 2007 “Nailing the Basics” Earns Princeton, IL RP3 Diamond Award.
Section 3 TRANSMISSION & DISTRIBUTION US Bulk Power Transmission System Transmission & Distribution (T&D) Components New T& D Technologies This product.
Applying the Distribution System in Grid Restoration/NERC CIP-014 Risk Assessment Srijib Mukherjee, Ph.D., P.E. UC Synergetic.
SWEDE - April 26 th, Bastrop Tommy Nylec Austin Energy Fusing and Fault Indicator Applications.
1 The following are the planned transmission project at SCL for the next ten year. All the projects has no major impact to the bulk transmission system.
APPLIED ELECTRICITY SS3
Long Term Study Task Force Update Transmission Study Practices and Methodologies April 5th,2011 LTS.
Module 5, Unit A Vocabulary Review Game. 2 pt 3 pt 4 pt 5pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2pt 3 pt 4pt 5 pt 1pt 2pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4pt.
Lyndonville Electric Department Feasibility Analysis Review December 2,
Distribution Planning Use of SMART Distribution Automation Control System (DACS) Presented by: Ed Briggs, P.E. Created by: Ed Briggs & Greg Wickliffe
Lee County Electric Cooperative 2007 Hurricane Preparedness Activities.
POWER SYSTEM PLANNING CHARTER AND PROCESSES UPDATES Presentation to TAC Sept 9, 2004 Transmission Services Ken Donohoo, Manager of System Planning
Jones Creek Project Submitted to RPG on July 7, 2014 July 22, 2014 Regional Planning Group Meeting.
Utility Engineers, PC.  Generation  Transmission  Distribution.
Steady State Analysis Of A Microgrid Connected To A Power System
Electric Utility Infrastructure Commission Staff Workshop January 23, 2006.
EECE 887 Distribution System Engineering CHAPTER 1 Power Delivery Systems.
TAC02/01/2007 DW 1 TAC Briefing on: - Report on Constraints and Needs: Five Year Plan Development - Long Term System Assessment (LTSA) - Entergy Integration.
AEPSC Live Oak County Transmission Project – ERCOT Independent Review TAC September 24, 2015.
Submitted to: Submitted by:
Distribution Systems-General
Department of Electrical Engineering
A Training Presentation On 132 KV GSS JAIPUR Submitted in partial fulfillment For the award of the degree of BACHELOR OF TECHNOLOGY Submitted To:- Submitted.
© 2000 PACIFICORP | PAGE 1 SOUTHWEST UTAH AREA STUDY SEPTEMBER 2014 Nathan Wilson/Talmage Daley Need to review the LOADS before Friday.
A SEMINAR ON 400 KV GSS(RRVPNL) BIKANER.
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
Oncor Transmission Service Provider Kenneth A. Donohoo Director – System Planning, Distribution and Transmission Oncor Electric Delivery Co LLC
Dated: 17 February 2016 Instructor :Kashif Mehmood.
PG&E’s Distribution Resources Planning READ AND DELETE For best results with this template, use PowerPoint 2003 Planning the “Networked Grid“ Integrated.
Loop-Sectionalizing Automation Scheme Colin Hawthorne 4/26/2016.
SYNERGY INSTITUTE OF ENGINEERING AND TECHNOLOGY
URBAN DESIGN Non-standard (Alternative) and Aesthetic Liafis A Ogboye, P.E.
Austin Energy Elevated Requests for High Reliability Service South West Electric Distribution Exchange (SWEDE) May 8, 2015 David Tomczyszyn, P.E. – Distribution.
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
Resiliency and Reliability
Freeport Area Master Plan Project -
Sub Station.
SUB-STATIONS.
Electric Utility Master Plan Update
Advanced Fuse-Saving Techniques
35kV Assessment SWEDE 2007 May 10, 2007.
Basics of electrical engineering
Transmission and Sub-Transmission Network India – Present and Future Rajesh Suri GE (T&D) India Ltd 8 November 2018.
FAULT ANALYSIS - BALANCED FAULT
Pacific Power Seismic Preparedness Update
Distributed Generation (DG) Modeling Criteria
Irvine Smart Grid Demonstration Distribution Volt / Var Control
Ahmed Kulab Moh. Abed Foaad Al-Habeel
CIRCUIT BREAKERS E. Chikuni. Circuit Breakers Mechanical Switches capable of making and breaking currents under normal circuit conditions and for a specified.
Presentation transcript:

Jesus A. Guerra, P.E. Distribution System Reliability CenterPoint Energy SWEDE 2011

Agenda CNP T&D Facts Background of Kuykendahl Substation PTS Failure\New Switching Procedures Addition of Transmission Substation Conclusion Questions

T&D Facts CNP T&D serves a 5,000-square-mile area that includes Houston, the nation’s fourth largest city. CNP delivers electricity on behalf of 79 retail electric providers. 2+ Million Metered Delivery Customers 27,726 miles of Overhead Distribution Lines 3,729 miles of Overhead Transmission Lines 20,080 miles of Underground Distribution Lines 26 miles of Underground Transmission Lines 1521 Distribution circuits 230 Substations (Transmission and Distribution) 13 Service Centers

CNP Service Area Map

Background Kuykendahl (KDL) Substation CNP’s only 345/35 kV Sub Built in /80/100 MVA Transformers Initially serving four circuits (Currently 5 circuits) Constructed to serve increased load growth that would result in voltage design criteria violations. Built on existing CNP property

Location

Substation Site (Cow Pasture)

Substation Site

New Feeder Location

New Feeders

PTS Failures From 7/31/01 – 10/19/01 three PTS failed during attempts to separate a KDL Feeder from Feeders served by other substations (138/35 kV). Some failed PTS had successful switching operations. (Crews reported excessive arcing) Due to unique sub design failures resulted in an open transition switching only until further investigated.

PTS Failures Identified 3 possible causes for PTS failure: 1.Excessive currents PTS Rated for 600A and 900A, breaker setting was lower. 2.Transient Recovery Voltage (TRV) Difficult to measure in the field. TRV model was constructed using ATP (Alternative Transient Program). – (Model showed results were slightly higher than the ANSI standard TRV curve) 3.Switch (Mechanical) Failure Misalignment, contamination, broken insulators, operator error, etc

PTS Failures Only the last switch was saved for analysis –Arcing was present. –Manufacturer concluded that interrupters were not properly aligned. –Without the other switches it’s impossible to determine what effect switch failure played in these events.

New Switching Procedure Load Flow Model simulations revealed large flows of current at the breaker could cause it to trip during routine switching or service restoration. A new closed transition switching procedure was created. –KDL to KDL switching as 1 st option (tie bus at sub) –Other procedures required when rolling the circuit to a particular transformer or adding load to it and performing the operation. –Closed transition would not be possible if one TRF is out of service.

Addition of Transmission Sub New Transmission Substation 345/138 kV Sub Energized 1 st Qtr 2010 Increase capacity for 138 kV lines 2.5 miles from KDL Re-evaluation of Switching Procedures

New Transmission Sub

345 Ckt A 345 Ckt B 345/35 kV Sub New 345/138 kV Sub138 kV Ckts

Re-Evaluation of Switching Procedure Load Flow study conducted using PSS/E software –L-F studies help determine the steady-state operation on an electrical power system. 3 models were analyzed to evaluate voltage and current changes at various normally open PTS. 1.Prior to transmission sub installation 2.Post installation of transmission sub 3.Post installation including future load growth

Results 37 Open PTS studied Results showed no significant increase in voltage levels prior to and post new transmission sub installation. Current Changes –2/3 scenarios showed less than 5% change in current levels –1/3 scenarios showed larger than 5% change: 8 PTS showed decrease in current up to 33% 5 PTS showed increase in current (6 – 7%)

Conclusion The addition of the new transmission sub will allow CNP to continue with the current switching procedures. As the dynamics of the system changes CNP will have to revisit the switching procedures.

Questions