Presentation is loading. Please wait.

Presentation is loading. Please wait.

Distribution Planning Use of SMART Distribution Automation Control System (DACS) Presented by: Ed Briggs, P.E. Created by: Ed Briggs & Greg Wickliffe

Similar presentations


Presentation on theme: "Distribution Planning Use of SMART Distribution Automation Control System (DACS) Presented by: Ed Briggs, P.E. Created by: Ed Briggs & Greg Wickliffe"— Presentation transcript:

1 Distribution Planning Use of SMART Distribution Automation Control System (DACS) Presented by: Ed Briggs, P.E. Created by: Ed Briggs & Greg Wickliffe edwin.briggs@centerpointenergy.com

2 How did the Swine Flu get started?

3

4 Load growth is one of the main drivers that challenge electric distribution planners to determine the most reasonable method to accommodate the new loads.

5 To accommodate load growth, previous design criteria required adding another transformer to substation.

6 The use of SMART Distribution Automation Control System (DACS) is an alternative to installing new substation transformers. SMART DACS controls internal substation circuit switching and distribution circuit switching to prevent substation transformer overloading under a single transformer outage. Remote Control (RC) distribution switches will automatically transfer load to one or more adjacent substations.

7 Our SMART DACS system is designed to send out notification via pagers or e-mails when single contingency transformer loading gets to 85% and again at 90%. When single contingency transformer loading gets to 95% then the SMART DACS system is automatically armed and notification is sent via pagers and e-mail.

8

9

10 DACS switching moves 3 MW of load from Spencer circuits SP-03 to SP-11 and 6 MW of load from CA-01 to SP-03.

11 3 MW of switchable load 719 customers 6 MW of switchable load 974 customers

12 Antenna Lightning Arrestor Switch Motor Operator 12kV Bridges Remote Control Pole Top Switch # 4678 - Closed Position

13 Switch Control with RTU & PLC

14

15

16 DACS switching moves 13 MW of load from Lyondell circuit LY-44 to King circuit KG-42 and 12 MW of load from Lyondell Circuit LY-41 to Newport circuit NP-44.

17 13 MW of switchable load 883 customers 12 MW of switchable load 1100 customers

18 35kV Bridges Remote Control Pole Top Switch #13680 - Closed Position Antenna Lightning Arrestor Switch Control with RTU & PLC

19 Antenna Lightning Arrestor 35kV Bridges Remote Control Pole Top Switch #13680 - Closed Position Switch Motor Operator

20 DACS Fault Detection and Sectionalizing to avoid circuit lockout. A fault on distribution circuit occurs. Circuit breaker trips open and closes back. Fault still present, thus circuit breaker opens again. Circuit breaker stays open for 25 seconds. DACS algorithms analyze RC switch data to determine location of fault. RC switches are opened and closed to isolate fault. Circuit breaker closes and holds – No circuit lockout. Avoids third substation transformer through fault.

21 CenterPoint Energy utilizes other SMART Systems: SMART BLOCK SMART TAP SMART CASCADE