Donor Conference Ministry of Energy of Georgia. Current situation Technical problems –Power sector of Georgia – not build to operate independently Economic.

Slides:



Advertisements
Similar presentations
Grenada Sustainable Energy Plan Stakeholders Meeting April 5, 2002.
Advertisements

The Role of ESCO in Wholesale Trade of Electricity (Capacity) ( REVIEW OF WHOLESALE TRADE OF ELECTRICITY) KUTAISI September,
BI Marketing Analyst input into report marketing Report TitleElectricity in Malawi Report SubtitleCountry profile of power market trends and investment.
Baltic Energy Strategy Einari Kisel Director of Energy Department.
1 Power Sector in Tanzania Recent Developments, Current Crisis, Issues, Challenges and Solutions.
Sustainable Energy Development-Mongolian Energy Policy and Goals
Donors’ Conference on Sustainable Energy for Kosovo
Energy Regulators Regional Association - present and future - Maria Manicuta ERRA Bucharest APRIL 03-05, 2006 Black Sea Energy Conference.
Dr. Mahdi Al-Hafedh “Rebuilding Iraq with Iraqi hands” Conference Organized by IACCI July 2007 Prospect for Economic Growth in Iraq.
EStorage First Annual Workshop Arnhem, NL 30, Oct Olivier Teller.
Dr. Yüksel MALKOÇ TWEA Vice President. Turkey’s current financial outlook, Demand growth and supply development, Wind potential and capacity development,
3 November 2005 GIE Conference Gas Market Developments in SEE Balázs SÁNDOR Chairman GIE ECSEE Study Group Athens - 3 November 2005.
Ministry of Energy and Water Resources of the Republic of Tajikistan
Energy Tobias Cossen Ho Chi Minh, October 29 th 2012 On-Shore Wind Power Good Business for Everyone.
THE CURRENT STATE OF ENERGY SECTOR IN MONGOLIA, DEVELOPMENT TRENDS
Energy Renewable Energy in Germany Uta Zähringer - RENAC, Athens - September 15, 2009 placeholder partner logo Renewables Academy (RENAC) AG Schönhauser.
In-conduit Hydropower: Public Sector meets Private Inventions
1 Ongoing strategy of development and reconstruction of electricity sector of Tajikistan Rafika Musaeva Chairman of Association of Energy of Tajikistan.
Republic of Armenia Scaling Up Renewable Energy Program (SREP) Investment Plan June 2014.
1 Energy Efficiency and Conservation in Thailand Department of Alternative Energy Development and Efficiency (DEDE) Ministry of Energy 6 th January 2005.
LOGO Ho Chi Minh - November Developments in Energy Sector And Target I. Power Development Plan (Master Plan VII) approved by Vietnam.
WORKING DRAFT Last Modified 8/13/2010 4:05:09 PM Central Europe Standard Time Printed :22:48 Central Europe Standard Time Renewable Energy.
Lina Murauskaitė New Challenges in the European Area: Young Scientist’s 1st International Baku Forum May 20-25, 2013, Azerbaijan, Baku Integration of Renewable.
Presentation by Anatoly Chubais Chief Executive Officer RAO «UES of Russia» to the 18th World Energy Congress (round table) Buenos Aires.
Household energy, water vulnerability in Tajikistan and Kyrgyzstan: What have we learned? Ben Slay Senior economist UNDP Bureau for Europe and CIS Third.
4 April 2012, Sofia University "Sts. Cyril and Methodius“ Faculty of Electrical Engineering and Information Technology, Skopje REGIONAL ELECTRICITY MARKET.
Several problems in implementation of the investment programs in power industry Speaker: A.Y.Kopsov, Member of the “Nice Club”, Doctor of Technical Science,
Updates on the RFE Energy Sector and the RFE LEAP model, and Implications of a Regional Alternative Path for the Russian Far East Victor Kalashnikov Economic.
Main Issues of the Energy Sector of Georgia Nika Gilauri.
Ainārs Meņģelsons Public Utilities Commission Latvia 11th Baltic Energy Regional Initiative October 1, 2010 Jūrmala, Latvia ELECTRICITY REGIONAL INITIATIVE.
Ukraine In-Depth Energy Efficiency Review VI International Specialized Trade Fair “ENERGY EFFICIENCY RENEWABLE ENERGY – 2013”, Kiev, 8 November 2013 Steivan.
ENERGY AGENCY LITHUANIA Perspective for the EU Structural Assistance to the Energy Projects in Lithuania for the period Marijus Franckevičius.
Financing Heating Sector Improvement Project ADB’s Experience International Conference October 2005, Baku October 2005, Baku Ashok Bhargava.
THE LONG-TERM ENERGY SUPPLY AND DEMAND OUTLOOK IN TAIWAN ENERGY COMMISSION MINISTRY OF ECONOMIC AFFAIRS AUGUST 2001 MOEA -15-
LENENERGO GENERAL OUTLOOK Transmission lines by voltage less than 220 kV 97% 330 kV 1% 220 kV 2% The largest power company in the North-West Russia.
Secondary legislation on renewable today and tomorrow Nicolae Opris Vicepresident, ANRE ANRE ROMANIAN ENERGY REGULATORY AUTHORITY.
Giorgi Mukhigulishvili World Experience for Georgia
1 Belarus CEM Discussions Energy Sector Stable sector structure and governance over the past decade together with recent macro economic performance of.
Ambassador Sherali Jononov
1 Vienna Economic Forum –VEF- ERE AND THE REGULATORY FRAMEWORK FOR THE PRIVATISATION OF DSO Bujar Nepravishta Chairman of ERE Tirana-8 th and 9 th June.
Green Growth Investment in St.Vincent and the Grenadines Presented by: Ellsworth Dacon October 6 th 2011.
Perspectives of Nuclear Energy Further development in Armenia A. A. Gevorgyan Obninsk, RF 27 June – 2 July 2004.
BI Marketing Analyst input into report marketing Report TitleElectricity in Madagascar Report SubtitleCountry profile of power market trends and investment.
BI Marketing Analyst input into report marketing Report TitleElectricity in Namibia Report Subtitle Country profile of power sector, market trends and.
HIGH LEVEL FORUM “SECURITY OF ELECTRICITY SUPPLY IN KOSOVO” ENERGY POLICY FRAMEWORK IN KOSOVO LUAN MORINA, HEAD OF DEPARTMENT FOR ENERGY PRISHTINA, MARCH,01,2016.
Strategic Development of Power Generation in the Context of “Energy Strategy for the Year 2030” Chisinau - September 2010 Al. Gribincea PhD World economy,
Location The park is located between the major centers of consumption in Russia Industrial Park MSB-Udomlya is located in the Tver region. The developed.
Energy Sector of Turkey “General Overview and Policy Objectives” Sinem ÇAYNAK General Directorate for Energy Affairs IEA Turkey IDR Meeting December 8,
Kazakhstan Electric Association KEA Established in 1998 Unites 21 participants and 12 observers Among participants 9 distribution companies 3 vertically.
Renewables Readiness Assessment -Background Jensen Shuma IRENA - local consultant Dar es Salaam, 9 March 2016.
Electricity Basket Price & 2013 Power Policy Hammad Hashmi Advisor Technical (USAID) MWP.
INTERIM CG MEETING Copenhagen April 29, 2002 Strategy of World Bank for Supporting Power Sector Projects in Central Asia Presentation by Raghuveer Sharma.
Ojārs Kehris Economist Association 2010 President Energy market and security of supply in the Baltics – Latvia, Lithuania, Estonia Reforming Infrastructure.
Georgy TAVADZE Chairman Georgian National Energy Regulatory Commission (GNERC) Budapest, Hungary April 14, th Annual Meeting of the Energy Regulators.
“Electricity System Operator” EAD S tate and Prospects for Development of the Bulgarian Electrical Power System Ventsislav Zahov, Head of Electrical Regimes.
1 An Autonomous Energy Regulatory System to Enhance Economic Development Jean Constantinescu THIRD ANNUAL ENERGY REGULATORY CONFERENCE FOR CENTRAL/EASTERN.
Power Sector and Fiscal Issues: The Case of Kosovo Hajdar Korbi Ministry of Economy and Finance Kosova.
Anna FLESSA, Dipl.-Ing. Researcher of KEPA Aliki – Nefeli MAVRAKI, MSc. Researcher of Climate Change unit, KEPA National and Kapodistrian University of.
Republic of the Union of Myanmar Electricity Sector Financial and Regulatory Issues 18 May 2016 by Myanmar Energy Team The World Bank.
GEORGIAN ELECTRICITY MARKET OPERATOR
“Caucasus Power Transmission Network’’ (Armenia-Georgia overhead transmission line/substations) Loan Project.
Loan Project of Construction of Iran-Armenia 400kV third power transmission line (“ Noravan’’ 400/220/20 kV) and related substation.
CREATION OF ENERGY EFFICIENCY FUND
DCC Cluster/Working Group Energy MTDS (GoT) priorities for the sector
Overview on Renewable energy in Bulgaria
Energy Sector Overview
Energy Strategy Center of Scientific Research Institute of Energy
ELECTRICITY TRANSMISSION PROJECTS IN THE BSEC REGION
Energy transition in Uruguay
Solar Opportunities in Ontario
Presentation transcript:

Donor Conference Ministry of Energy of Georgia

Current situation Technical problems –Power sector of Georgia – not build to operate independently Economic problems Collection rate –Not metered –High Indebt ness –Not rehabilitated properly for 10 years Financial aid needed for transition period and basic rehabilitation

Objectives Self-Sustainability – profitability –Independently operational –Without additional subsidies from donors and / or government –Attractive for private investment Energy Security –Utilization of transit opportunities –Multiple sources for import –Differentiated markets for export Otherwise politically and economically dependent No prospect for economic development Social tension

Policy Collection rate –Main problem –40% collection rate –Investment in metering –Legislation against theft of electricity –Public awareness campaign Rehabilitation and construction of new grid and high voltage lines –Turkey, Azerbaijan, Russia, Armenia Rehabilitation of Existing Hydropower Plants –40-45 % of installed capacity –Spend less on imports

500KW Energy System of Georgia Ministry of Energy

Enguri HPP 1300MW – 700MW Vardnili HPP 210MW – 60MW Hydro Power Plants of Georgia Khrami I HPP 112MW – 60MW Khrami II HPP 110MW – 0MW Jinvali HPP 130MW – 90MW Shaori HPP 38MW – 18MW Dzevrula HPP 80MW – 54MW Vartsikhe Cascade HPP 184MW – 132MW Ministry of Energy Gumati I,II HPP 66MW – 39MW Rioni HPP 48MW – 45MW Lajanuri HPP 111MW – 30MW Planned: Hudon HPP 600MW

Current achievements Without additional investments Decreasing of electricity looses in high voltage grid –17% in Winter of 2003 – 9.6% in Winter of 2004 Relatively improved supply of electricity – up by 16% Installation of meters at borders with neighbor countries State budget investment - 2,5 mln USD per month –Enguri HPP rehabilitation project co-financing –Wholesale & commercial metering –Urgent maintenance Rehabilitation of the 1 st unit of Vardnili HPP (70 MW) Detailed business plan for Improved legislation for financial rehabilitation

Projects Metering –Improved collections –Decreased consumption –Rustavi example Rehabilitation of HPP – % of installed capacity –“Quick Hit” program Rehabilitation of Gardabani TPP –Electricity for base load –Problem – Funds for natural gas supply Rehabilitation of the network –Increased system stability Winter Heat Program –Improved supply and help vulnerable