The SQL Applications Documentation Tool for Dublin City Council.

Slides:



Advertisements
Similar presentations
ManageEngine IT360 Product Overview
Advertisements

Project Management.
Process and Product Quality Assurance (PPQA)
Chapter 2 The Analyst As Project Manager In Managing Information Systems 2.3.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
The CERIF-2000 Implementation. Andrei S. Lopatenko CERIF Implementation Guidelines Andrei Lopatenko Vienna University of Technology
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Project Management.
Page 1 More information at; gaddsoftware.comgaddsoftware.com.
© 2004 Visible Systems Corporation. All rights reserved. 1 (800) 6VISIBLE Holistic View of the Enterprise Business Development Operations.
Chapter 3 Database Management
What is a project? Project Management Institute definition
Supplement 02CASE Tools1 Supplement 02 - Case Tools And Franchise Colleges By MANSHA NAWAZ.
DATABASE DEVELOPMENT STRATEGIES TOP DOWNTOP DOWN –Large scale application driven by strategic objectives –General  Specific –Organization-wide (“data.
ONLINE TECHNICAL REPORT SYSTEM Team Crash Course Ryan Ashe, Eileen Balci, James Kirk, Taylor Paschal.
Project Management Solutions Using SharePoint April 14, 2010.
About Waterloo website Project report June Outline Overview of process Project deliverables Lessons learned.
1 SHAREPOINT FOR PROJECT MANAGEMENT COLLABORATION Gerry Brimacombe Sector Learning Solutions Inc.
Welcome to the Minnesota SharePoint User Group. Introductions / Overview Project Tracking / Management / Collaboration via SharePoint Multiple Audiences.
Overview of Change Management ClearQuest Overview for CORUG January, 2008.
MAHI Research Database Project Status Report August 9, 2001.
TEAM FOUNDATION SERVER (TFS) By Sunny Niranjana Devi. M.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
Computer System Analysis
Systems Analysis and Design in a Changing World, 6th Edition
Project Management Process Overview
S/W Project Management
System design technique  System Development Life Cycle  Prototyping  Rapid Application Development.
INFORMATION SYSTEM APPLICATIONS System Development Life Cycle.
Managing Projects using Oracle Project Management (PJT) & SPREADSHEETS Neeraj Garg Vice President, Client Services.
Is it really needed for research projects ? Project Management.
Page 1 MODEL TEST in the small GENERALIZE PROGRAM PROCESS allocated maintenance changes management documents initial requirement project infrastructure.
Chapter Intranet Agents. Chapter Background Intranet: an internal corporate network based on Internet technology. Typically, an intranet can.
Reporting to Management Using Microsoft Project and EPM Derek Loar, Pcubed.
Agenda Principal Consultant, SharePoint Development Team Lead John Ramminger Linked In:
1 ISA&D7‏/8‏/ ISA&D7‏/8‏/2013 Systems Development Life Cycle Phases and Activities in the SDLC Variations of the SDLC models.
User Manager Pro Suite Taking Control of Your Systems Joe Vachon Sales Engineer November 8, 2007.
SD&D Project Repository (TSPR) OI PM staff meeting 6/19-22/01.
State Records Office of Western Australia.NET Proof of Concept Project Slideshow: Prototype Online Disposal Authority/Recordkeeping Plan System Project.
Eric Holtel.  Introduction  Project Description  Demonstration  Deliverables  Conclusion.
Systems Development AIMS 2710 R. Nakatsu. Overview Why do IT projects succeed and fail? Two philosophies of systems development –Systems Development Life.
Service Transition & Planning Service Validation & Testing
Copyright 2006 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Third Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Systems Development MBAA 609 R. Nakatsu. Overview of Today’s Lecture Why do IT projects succeed and fail? Two philosophies of systems development –Systems.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
The Development of the Ceramics and Glass website Mia Ridge Museum Systems Team Museum of London.
Developing software and hardware in parallel Vladimir Rubanov ISP RAS.
“Success consists of going from failure to failure without loss of enthusiasm” “A lie gets halfway around the world before the truth has a chance to get.
Database Administration
Copyright 2003 Lynn Frock & Company. All Rights Reserved. 1 Five Ways to Build a Microsoft Project Schedule Lynn Frock, PMP Phone
Page 1 JUSTIFY define and validate REQUIRE- MENTS define initial management DOCUMENTS define INFRA- STRUCTURE allocated maintenance changes management.
Begin Class with More Studio. Introduction to Prototyping.
CASE (Computer-Aided Software Engineering) Tools Software that is used to support software process activities. Provides software process support by:- –
Information Systems System Analysis 421 Chapter 3 Managing the Information Systems Project.
1  [company] Inc. [year] Girl Scouts of the USA Secure Site Project Kickoff [date]
Systems Development AIMS 2710 R. Nakatsu. Overview Two philosophies of systems development –Systems Development Life Cycle (SDLC) –Prototyping Alternative.
An organizational structure is a mostly hierarchical concept of subordination of entities that collaborate and contribute to serve one common aim... Organizational.
Project Management.
Copyright 2001 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Chapter 2 Managing the Information Systems Project 2.1.
Team-Based Development ISYS321 Managing the Information Systems Project.
6/13/2015 Visit the Sponsor tables to enter their end of day raffles. Turn in your completed Event Evaluation form at the end of the day in the Registration.
DBS Monitor and DAN CD Projects Report July 9, 2003.
Development Project Management Jim Kowalkowski. Outline Planning and managing software development – Definitions – Organizing schedule and work (overall.
TM Vienna v2.0. TM An Overview of Vienna v2.0 Vienna 2.0 was designed to address issues that exist with test management and execution software available.
Dagmar Schmalzbauer ATMOS - Austrian Monitoring System.
Enterprise Program Management Office
Dana Kaufman SQL Server Appliance Engineering
Service Blueprint - We started our Service Blueprint for SQLDOT as a post-it based exercise and quickly became aware of multiple processes for SQLDOT.
Chapter 3 Managing the Information Systems Project
Presentation transcript:

The SQL Applications Documentation Tool for Dublin City Council

Problem: No one true source of information on applications with underlying SQL server database Solution: Centralised information with automatic notification, querying and monitoring of SQL Server applications Understanding the Stakeholders

Brainstorming We brainstormed as many ideas as possible of what a solution might look like and came up with three alternatives :- one in which all data collection was automated (High Automation); one in which all data collection was manual (Low Automation) and a combination approach (Medium Automation)

Users evaluated Prototypes Users interacted with paper and balsamiq prototypes (just like a real system) and gave us feedback

Landing Zone & Innovation Targets

Project Plan &Work Breakdown Structure Work Breakdown Structure: This is where we identified all the tasks and durations. Project Planning: We assigned tasks to team members and worked out a plan that would ensure all deliverables were met for our sponsor within the given timeframe

User Testing Test Plan SQLDoT Version 1

Training & Launch

The SQL Applications Documentation Tool for Dublin City Council

 Where’s your application?  Where’s your data?  Who you gonna call?

SQLDoT Application

System Architecture Diagram

Business Model Canvas

User View key SQL Application Information at a glance – quickly find out business information (lead business user; first line support; system criticality, data classification etc) and infrastructural information about an application (what components go to make up the SQL application and where they are located) Provide a link between SQL application information and related documents such as service description document, contracts page and projects page on Sharepoint Real-time monitoring and reporting of SQL databases – database growth over time; locks, long-running queries etc – quickly establish if problems exist and how to resolve them. View real-time status of application and database servers, quickly establish if any problems exist and how to resolve Schedule maintenance more efficiently by establishing what applications will be affected if a server needs to be brought down Improved capacity planning via database growth analysis View key SQL Application Information at a glance – quickly find out business information (lead business user; first line support; system criticality, data classification etc) and infrastructural information about an application (what components go to make up the SQL application and where they are located) Provide a link between SQL application information and related documents such as service description document, contracts page and projects page on Sharepoint Real-time monitoring and reporting of SQL databases – database growth over time; locks, long-running queries etc – quickly establish if problems exist and how to resolve them. View real-time status of application and database servers, quickly establish if any problems exist and how to resolve Schedule maintenance more efficiently by establishing what applications will be affected if a server needs to be brought down Improved capacity planning via database growth analysis Database Tables Application Tables Component Tables SQLDoT system – a central repository of information on SQL applications

SQLDoT, The Sequel Create Test Environment for SQLDoT Security Baseline analysis for SQL Servers Extend SQLDoT to include Oracle Applications Extend SQLDoT to include services such as MS Exchange Link to Infra Call Management System Link to Change Management system so that change is automatically reflected in SQLDoT Automatic generation of Service Description Document from SQLDoT Make SQLDot available to other Local Authorities