Federal Aviation Administration Data Comm 1 Federal Aviation Administration Key Site Timelines Hal Ludwig.

Slides:



Advertisements
Similar presentations
Federal Aviation Administration GOLD Amendment Program By:Tom Kraft Date:8 February 2012 Presented to:SOCM/2 Seminar.
Advertisements

Federal Aviation Administration International Civil Aviation Organization INFORMATION PAPER AERONAUTICAL COMMUNICATIONS PANEL (ACP) 20th MEETING OF WORKING.
Presented to: IFIS 2008 By: Dan Burdette, Airspace System Inspection Pilot Date: June 23-27, 2008 Federal Aviation Administration Electronic Coding/Packing.
Data Comm Proposed DCL Services Deployment Waterfall
Federal Aviation Administration S1P1/P2 Production System: DCL Route Rules DCIT#32 16 April 2014.
Federal Aviation Administration Data Communications Program DCIT Update MEM ATCT DCL Trials To:DCIT Plenary From: Matt Maki Date:
AOC/FOC Interface for Data Comm Production System
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #24 En Route Route Clearances Draft Use Case Introduction Boeing –
Federal Aviation Administration FAA Labs in a Distributed and Collaborative Environment to Support V&V William J. Hughes Technical Center October 10, 2012.
FAA Controller Pilot Data Link Communications Program ATN ‘99 London, England James H. Williams September 22, 1999.
Federal Aviation Administration Data Communications Implementation Team (DCIT) Departure Clearance Trials (DCL) Test Status DCIT Meeting # 22 Washington,
Federal Aviation Administration Data Communications Program Data Comm Trials and Production Requirements: High Level Impact Presented To: DCIT #23 Plenary.
ATN Subnetwork Implementation:
Federal Aviation Administration Data Communications Program DCL Trials DCIT Update MEM ATCT To:DCIT Plenary From: Matt Maki Date:
Federal Aviation Administration Data Communications Integration Team (DCIT) DCL Trials test activities Presented to:DCIT # 15 By:Peter Muraca FAA Date:May.
Harris.com Michael Earl Systems Engineering, Trials and OPR Trials Status and OPR Update.
Presented to: DCIT #12 Plenary By: Andy Fry, Thane Inc. Date: January 12, 2012 Federal Aviation Administration Data Communications DCIT Update Flight Deck.
Data Link Communications
Federal Aviation Administration NextGen Test Bed Capabilities and Future Plans Presented by: Vince Lasewicz Laboratory Services Group Date: 11/05/09 William.
Data Communications Implementation Team (DCIT)
CONNECT Roadmap Draft version as of February 4 th,
Document Tracking and the Related Process Andria Roney Rob Mead Andy Fry Andrew Onken.
11 SUPPORTING APPLICATIONS IN WINDOWS XP PROFESSIONAL Chapter 9.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #25 Agenda 07/17-07/18/2013 Harris Corp – Washington, D.C.
Federal Aviation Administration Data Comm 1 Federal Aviation Administration Key Site Timelines Hal Ludwig & Pete Muraca.
Presented to: DCIT FDWG Breakout Session By: Andy Fry, Thane Inc. Date: July 11, 2012 Federal Aviation Administration Data Communications DCIT #16 Flight.
Federal Aviation Administration Data Communications Program Operational Trials in Domestic Airspace Presented to:Data Comm Implementation Team (DCIT) By:Jerry.
Federal Aviation Administration Data Communications Program Departure Clearance (DCL) Trials DCIT17 To:DCIT Plenary From: Matt Maki, Trials Lead Date:
Federal Aviation Administration Data Comm 1 Federal Aviation Administration Key Site Timelines Hal Ludwig.
BOEING is a trademark of Boeing Management Company. Copyright © 2011 Boeing. All rights reserved. OMWG and All Working Groups DCIT-39 report out 11 March.
Federal Aviation Administration NextGen Integration & Evaluation Capability (NIEC) Presented by: Vince Lasewicz Laboratory Services Group Date: 01/07/10.
Federal Aviation Administration DCIT 39: S1P1 DCL E2E Summary DRAFT To: DCIT All WG From: Data Comm Production SE Date: DCIT 39, 11 March DRAFT.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #33 Agenda 6/4/2014 Harris – Washington, DC.
Page 1 FAA Future Air/Ground Communications System Architecture James Williams Integrated Product Team Lead Communications Systems ATN September.
Federal Aviation Administration Test Planning for AOC/FOC Interface for Data Comm Production System To: DCIT 29 From: Data Comm Production Sub-Team Date:
Presented to: By: Date: Federal Aviation Administration DCIT 41 Plenary Mark Patterson, FAA, AFS June 2015 Flight Standards Update.
Presented to: Demonstrations and Prototypes TIM By: Steve Hodges Date: 05/04/2011 Federal Aviation Administration Aircraft Access to SWIM (AAtS) FY11 planned.
Presented to: By: Date: Federal Aviation Administration DCIT 40 Plenary Mark Patterson, FAA, AFS April 2015 Flight Standards Update.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT Meeting 08/24/2011.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #23 Plenary 05/09/2013 To: DCIT By: Gregg Anderson.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT Update To:DCIT Plenary From: Matt Maki Date:
Presented to: By: Date: Federal Aviation Administration DCIT 44 Mark Patterson, FAA, AFS Nov 2015 Flight Standards Update.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials Status / Overview DCIT #27 Plenary From: Matt Maki / DCL Trials Lead.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT 37 Plenary Agenda December 10, 2014 Harris Corp Washington, DC.
GROUND-GROUND STRINGAIR-GROUND STRING AVIONICS CSP AOC DTAP NESG HADDS.
| 1 harris.com Matt Maki DCL Trials Lead DCL Trials Decommissioning Plan 29 Sep 2015.
Federal Aviation Administration AOC/FOC Interface for Data Comm Production System To: AOC WG From: Data Comm Production Sub-Team Date: 08/22/12.
Federal Aviation Administration TDLS-CSP IRD and SDB-CSP IRD Update To: DCIT #24 From: Bruce Notley Date: 6/13/13.
Federal Aviation Administration Data Communications Implementation Team (DCIT) Data Communications Implementation Team (DCIT) DCIT #31 PLENARY DCL Trials.
Federal Aviation Administration AOC/FOC Interface for Data Comm Production System To: DCIT AOC WG From: Data Comm Production Sub-Team Date: 2/1/13.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials Status Updates To:DCIT21 Plenary From: Matt Maki Date:
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCL Trials ”T e s t S t a t u s” Presented to:DCIT, Meeting #18 Presented.
Federal Aviation Administration System Wide Information Management SWIM Implementing Programs (SIPs) Status Presented to: Demonstrations and Prototypes.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #22 Plenary 03/14/2013 To: DCIT By: Gregg Anderson.
P. Muraca v0.2 Data Comm DCL Trials end to end system test.
Federal Aviation Administration Subscriber Database (SDB) and Web Access To: DCIT AOC WG From: Data Comm Production Sub-Team Date: 3/13/13.
Presented by: Roger Sultan, FAA, AFS-430 Date: October 11, 2011 Federal Aviation Administration FPAW 2011 AC Rewrite Plan.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #25 Agenda 07/17-07/18/2013 Harris Corp – Washington, D.C.
FAA NextGen Data Comm Tower Service: CPDLC DCL New Operator Introduction.
Federal Aviation Administration Test Planning for AOC/FOC Interface for Data Comm Production System To: DCIT 26 From: Data Comm Production Sub-Team Date:
Presented to: DCIT Flight Deck Working Group By: Andy Fry, Thane Inc. Date: October 12, 2011 Federal Aviation Administration Data Communications DCIT #10.
International Civil Aviation Organization
Ops Metrics.
Data Comm Departure Clearance End To End Summary: (DCIT #27 WG)
GOLD GOLD Amendment Program Presented to: SOCM/2 Seminar
ATN Subnetwork Implementation:
.
IT Updates Maryland Health Benefit Exchange Board Meeting
Presentation transcript:

Federal Aviation Administration Data Comm 1 Federal Aviation Administration Key Site Timelines Hal Ludwig

Federal Aviation Administration Data Comm 2 Key Site Timelines

Federal Aviation Administration Data Comm 3 KSLC – Carrier DFV Participation Lead-Up Timeline

Federal Aviation Administration Data Comm 4 KSLC Date Testing Window (Tentative) ERAM Dispatch (FPL Filing) Local Flight Deck Remote Flight Deck AOC System Testing w/ WJHTC 07/16 – 07/18 Th, F, Sa Mid-Shift Test mode Testing w/ Carrier 07/19– 07/20 Su, M Mid-Shift Test mode Testing w/ Carrier 07/21 – 07/26 Tu, W, Th, F, Sa, Su Tue-Fri: Mid-Shift or Day & Swing Shift (as Aircraft avail.) 10:45 – 13:00 15:00 – 16:15 17:00 – 18:30 Sat-Sun: Open Active and Back- Up mode Carrier File and Fly 7/27 – 8/07Normal Ops Active and Back- up mode IOC8/7 Note: Mid-Shift is or 0500 (Local)

Federal Aviation Administration Data Comm 5 KIAH – Carrier DFV Participation Lead-Up Timeline

Federal Aviation Administration Data Comm 6 KIAH Date Testing Window Tentative ERAM Dispatch (FPL Filing) Local Flight Deck Remote Flight Deck AOC System Testing w/ WJHTC 08/19 – 08/21 W, Th, F Mid-ShiftN/A Testing w/ Carrier 08/22 – 08/23 Sa, Su Mid-ShiftN/A Testing w/ Carrier 08/24 – 08/27 M, Tu, W, Th Mid-Shift or Day & Swing Shift (as Aircraft avail.) Active and Back-Up mode Carrier File and Fly 08/28 – 09/03 F, Sa, Su, M, Tu, W, Th Normal Ops Active and Back-up mode IOC9/3 Note: Mid-Shift is or 0500 (Local)

Federal Aviation Administration Data Comm 7 KHOU – Carrier DFV Participation Lead-Up Timeline

Federal Aviation Administration Data Comm 8 KHOU Date Testing Window Tentative ERAM Dispatch (FPL Filing) Local Flight Deck Remote Flight Deck AOC System Testing w/ WJHTC 08/24 – 08/26 M, Tu, W Mid-ShiftN/A Testing w/ Carrier 08/27 – 08/28 Th, F Mid-ShiftN/A Testing w/ Carrier 08/29 – 09/02 Sa, Su, M, Tu, W Mid-Shift or Day & Swing Shift (as Aircraft avail.) Active and Back-Up mode Carrier File and Fly 009/03 – 09/10 Th, F, Sa, Su, M, Tu, W, Th Normal Ops Active and Back-up mode IOC9/10 Note: Mid-Shift is or 0500 (Local)

Federal Aviation Administration Data Comm 9 AOC Interface Scorecard AOC Test Activity% CompleteIssuesNotes ARINC implementation of 6 SMHP Messages100% IFCET implementation of TDLS-CSP IRD / ICD0%726 Fix targeted for CPDLC Release (May) Verify TDLS to CSP Connectivity100% Verify TDLS to CSP to AOC Connectivity100% TDLS to UPS CCI/CCA exchange0%726 TDLS-CSP IRD & ICD compliance planned 5/15 TDLS to United AOC Production0% Tentatively planned for 5/27 TDLS to Southwest AOC Production0% Tentatively planned for 6/3 TDLS to UPS AOC Production Tentatively planned for 6/10 TDLS to FedEx AOC Production Tentatively planned for 6/17

Federal Aviation Administration Data Comm 10 Discussion Items TDLS Updated IRD Review SDB Inputs –Will provide notification when the SDB web portal gets turned on