16.09.2002Alice DCS workshop S.Popescu 1 123 ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.

Slides:



Advertisements
Similar presentations
S.PopescuAlice DCS workshop, Colmar, OPCs latest news Iseg OPC server Wiener OPC server.
Advertisements

JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
Sezione di Bari September 16, 2002D. Elia - DCS workshop / ALICE week 1 SPD PS system and Controls Domenico Elia, INFN-Bari.
P.C. Burkimsher Alice DCS Workshop 18 March 2002 (Updated 27 March 2003) PVSS - How to get started Paul Burkimsher IT Division COntrols Group Support Services.
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
ALICE DCS Workshop - 15/3/2004 G. De Cataldo, A.Franco, A.Tauro - INFN Bari - 1 The SY1527 replay delay via the OPC and the ‘SY driver’ (By HMPID) The.
TPC-RO DCS set-up PVSS main(s) Iseg OPC server HV Iseg crates (3)LV Wiener crates (22) CAN bus Interface to FEE -temp.mon -I &V mon. Wiener OPC server.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
March 16, 2004Alice controls workshop, S.Popescu Low Voltage and High Voltage OPC status and plans.
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
Experiment Control Systems at the LHC An Overview of the System Architecture An Overview of the System Architecture JCOP Framework Overview JCOP Framework.
1 ALICE Detector Control System (DCS) TDR 28 January 2004 L.Jirdén On behalf of ALICE Controls Coordination (ACC): A.Augustinus, P.Chochula, G. De Cataldo,
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
HV for SM surface testing 2 nd Workshop on the Detector Control System for TRD University of Tsukuba Kengo Watanabe.
Uli Schäfer Discussions with H.B. after last meeting… All ATLAS standard racks and crates will be monitored. Helfrieds group will equip them with ELMBs.
The ALICE TRD - HVDistribution System A. Markouizos, P. Mantzaridis, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis, M. Vassiliou Athens University ALICE.
1 Integration of the HV Distribution System to the First TRD Super Module P. Mantzaridis, A. Markouizos, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis,
Marc R. StockmeierDCS, KIP ALICE WEEK FALL 2003 TRD DCS Status ● DCS-board status ● Poweresupply ●
Clara Gaspar, November 2012 Experiment Control System LS1 Plans…
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
Susanne Kersten, Wuppertal University November 21/22, 2013.
1 Status & Plans DCS WS L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM.
DCS planning for ITS/SDD Vojtech Petracek Jiri Kral CTU Prague DCS workshop CERN.
09/11/20061 Detector Control Systems A software implementation: Cern Framework + PVSS Niccolo’ Moggi and Stefano Zucchelli University and INFN Bologna.
MDT PS DCS for ATLAS Eleni Mountricha
Development and Performance of the High Voltage Distribution System for the ALICE TRD A. Markouizos, P. Mantzaridis, P. Mitseas, A. Petridis, S. Potirakis,
European Organization for Nuclear Research Geneva - Switzerland Ing. Robert van der Vlugt CERN/PH Alice Detector Control System PVSS2 General Purpose Interface.
S.Sergeev (JINR). Tracker consists of  4 chambers of 4 views each In total ~7200 drift tubes (~450 per view) To be controlled/monitored  HV system.
TPC DCS update. CR3 UX-A/C CR4-Z08 UX-A/C CR3 CR4-Z08 UX-A/C CR4-Y08 Chambers ISEG Chambers Wiener Ethernet RCU Chambers, detector ELMB
Update on Database Issues Peter Chochula DCS Workshop, June 21, 2004 Colmar.
1 Low Voltage Power Supply Specification DCS Workshop 8 Sept 03 L.Jirden.
The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team.
1 Responsibilities & Planning DCS WS L.Jirdén.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
TPC Prototype III TPC module anode HV edge LV module analog digital Cool sensor Gas sensor Shift Expert DCS Ch Skirt.
Wayne Salter, CERN The LHC Experiments’ Joint Controls Project Framework ALICE DCS Day 10 th September 2001.
André Augustinus OPC news, versions to use on behalf of Sorina Popescu.
European Organization for Nuclear Research Geneva - Switzerland Ing. Robert van der Vlugt CERN/PH Alice Detector Control System Serial Communication, simple,
André Augustinus 10 March 2003 DCS Workshop Detector Controls Layout Introduction.
André Augustinus 16 September 2002 PVSS & Framework How to get started.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
SA Ch High Voltage Module Main Features for each channel: V out = 12 kV I out = 1 mA R ipple = < 200 mVpp.
JCOP/DCS Plans for HW Upgrade A. Augustinus (ALICE), C
October 9th 2006ALICE WEEK - DCS WorkShop1 DEVICE USER SUPPORT OVERVIEW - Presentation - First Line Support - Reference System - Current Developpement.
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
André Augustinus 16 June 2003 DCS Workshop General Purpose Monitor.
19/05/10FV 1 HyTec crate – DCS integration issues.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
1 H C A L S.Sergueev, NEC2001, Varna, September 2001 CMS HCAL Slow Control System for the CMS Hadron calorimeter S.Sergueev, FNAL/JINR CMS HCAL.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
DCS overview - L.Jirdén1 ALICE ECS/DCS – project overview strategy and status L.Jirden u Organization u DCS system overview u Implementation.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
UF/PNPI POWER SUPPLY SOFTWARE By Magnus Hov Lieng
European Organization for Nuclear Research DCS remote control in NA62: Equipment & Control Integration. Mathias Dutour NA62 Collaboration 9th December.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
D. EliaALICE week / DCS workshop - Sept 20, SPD Power Supply System DCS status Domenico Elia INFN Bari.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
Joachim Schultes University of Wuppertal FIT Iseg DCS Training Session 2.2.
1 COSTING DCS WS L.Jirdén. 2 LAN WAN Storage Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Experimental equipment.
ALICE. 2 Experiment Size: 16 x 26 meters (some detectors >100m away from IP) Weight: 10,000 tons Detectors: 18 Magnets: 2 Dedicated to study of ultra.
Lar status Calorimeters cold and stable: The pressure in the C-side cryostat is not nominal because of a problem being fixed An electronic repair campaign.
The Maraton LV system Michela Lenzi INFN Firenze Thanks to V. Bocci, P. Ciambrone, A. Sciubba LV Power Supply RCM AC/DC converter.
HAPS Controls Glen White ATF2 Software Review Workshop, LAL, June 2008
TPC Detector Control System
Presentation transcript:

Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC server PCI Can Card Ethernet TCP/IP PVSS OPC Client 2 Integrating devices into Framework(JCOP) ISEG PS case

Alice DCS workshop S.Popescu 2 2. ) ISEG power supply integration into Framework ( write Alice PVSS application ) TPC RO High Voltage It is foreseen to use the ISEG EHQ F025p Supervision SCADA (PVSS) FSM,DB, web,etc. SCADA Framework Supervisory application PC (Windows 2000) Iseg OPC … Communication Iseg PS Device Iseg Driver Proc. Contr. Applic. Normal developer Hardware

Alice DCS workshop S.Popescu 3 Framework Selection of Iseg Crates

Alice DCS workshop S.Popescu 4 Framework Selection of Iseg Modules Type

Alice DCS workshop S.Popescu 5 Framework View of Iseg Crate + 2 modules

Alice DCS workshop S.Popescu 6 Framework Address for Iseg Channel Configuration

Alice DCS workshop S.Popescu 7 Framework Archive for Iseg Channel Configuration

Alice DCS workshop S.Popescu 8 Framework Alert for Iseg Channel Configuration

Alice DCS workshop S.Popescu 9 Framework PVSS ranges for Iseg Channel Configuration

Alice DCS workshop S.Popescu 10 Framework for single Iseg Channel Connection

Alice DCS workshop S.Popescu 11 Summary 1.) TPC RO cooling - prototype set-up is under tests - cooling regulation loop is connected and working properly - under study for improving the performances (stability, time response, loads, etc…) 2.) ISEG PS integration in Framework - first software written for ISEG PS, will be used by any Scada control application for CERN - final version will be release approx end of autumn - will be tested in a real experimental environment Feb. 2003