21-Jan-2009CSC - ESSC Jan'091 Report on CSC for ESSC Prepared for CSC by Fred Borcherding FNAL.

Slides:



Advertisements
Similar presentations
CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
Advertisements

CSC Muon Trigger September 16, 2003 CMS Annual Review 1 Current Status of CSC Trigger Elements – Quick Summary Jay Hauser, with many slides from Darin.
Commissioning of CSCs and Peripheral Crates Task L M. Ignatenko UCLA October
Jay Hauser, Emu meeting at Florida, 9 January CSC Trigger Meeting Summary Cast of many.
CSC Trigger Report: Results from June 25 ns beam test Production plans Software Darin Acosta University of Florida.
Printed by Topical Workshop on Electronics for Particle Physics TWEPP-08, Naxos, Greece / September 2008 MEZZANINE CARDS FOR.
CMS Emu Meeting, Dec. 6, Electronics Long Term Operations What we learned from Electronics Commissioning G. Rakness U.C.L.A. Dec 6, 2008.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Status of the CSC Track-Finder Darin Acosta University of Florida.
Alex Madorsky University of Florida/Physics Track Finder production readiness review, Rice, August 2004 Track Finder Crate, Backplane and Parts Alex Madorsky.
Problems with Muon System N. Bondar O.Maev
Wesley SmithAug. 18, 2010 Trigger Budget Review: Labor & M&S - 1 US CMS FY 2011 Budget Review Trigger Labor & M&S Wesley Smith Aug. 18, 2010 Outline Overview.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF Mikhail Matveev Rice University 17 August 2012.
Upgrade of the CSC Endcap Muon Port Card Mikhail Matveev Rice University 1 November 2011.
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
Status of NA62 straw electronics Webs Covers Services Readout.
T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Off-Chamber Electronics.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
CSC ME1/1 Patch Panel Interconnect Board (PPIB) Mikhail Matveev Rice University February 27, 2013.
US CMS DOE/NSF Review: April 11-13, Trig. - Estimate to Complete.
Electronics Review, May 2001Darin Acosta1 OPTICAL SP 1 Muon Sorter 3  / port card 3  / sector ME1 ME2-ME3 ME4 SR DT TF SP From CSC Port Cards MS MB1.
Upgrade of the CSC Endcap Muon Port Card with Spartan-6 FPGA Mikhail Matveev Rice University 30 April 2012.
Dick Loveless Upgrade report 12 Oct EMU Upgrade Report Dick Loveless University of Wisconsin 12 October 2012.
7-Nov-08ESSC Nov 2008 > CSC Early Upgrades by Fred B. 1 CSC Early Upgrades Current plans for "early upgrades" and maintenance during 2009 and 2010 Description:
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
1 Status of the CSC system M. Ignatenko (UCLA) CSC Operation and DPG meeting CERN January 18, 2012.
EMu Slice Test -- Status Frank Geurts FNAL/Rice
8-May-2010 LV Workshop1 Alignment LV: quick’n dirty HW review Alignment uses CAEN low voltage –No HV –Low power consumption electronics: under kW.
6-Dec-05PC Commissioning1 Peripheral Crate (PC) Commissioning Status Fred Borcherding, CSC/EMU Group.
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
CMS Week, 3-7 November CSC Trigger Test Beam Report Cast of many.
Update on CSC Endcap Muon Port Card
CSC EMU Muon Port Card (MPC)
T1 Electronic status Conclusions Electronics Cards:
EMU Slice Test Run Plan a working document.
CMS EMU TRIGGER ELECTRONICS
CSC - HV, LV - Present Status and Future Plans Toward Phase 2
University of California Los Angeles
University of California Los Angeles
Regional Cal. Trigger Milestone: Major Production Complete
Current Status of CSC Trigger Elements – Quick Summary
CSC Trigger Update Specific issues:
ALCT, TMB Status, Peripheral Crate Layout, CSC Event Display
Regional Cal. Trigger Milestone: Production & Testing Complete
CSC Trigger Muon Port Card & Sector Processor in production
New Calorimeter Trigger Receiver Card (U. Wisconsin)
University of California Los Angeles
Track Finder Crate, Backplane and Parts
B904 Status Report by Fred B.
CSC Trigger Meeting Summary
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
UXC55 ME Muon Endcap On Detector Layout
Fred’s Input to Rice Workshop
19-April-05 Peripheral Crate Testing, Installation, and Commissioning PC I&C Feb ’06 EMU Fred Borcherding 16-May-19 PC I&C Feb'06.
Equipment Management DB Rack Wizard USC55 Underground Counting Room
CSC Muon Sorter Status Tests Plans M.Matveev August 21, 2003.
Plans for the 2004 CSC Beam Test
Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves,
Prepared for CSC by Fred Borcherding FNAL
CSC Status Report Status reports;
19-April-05 CSC ME1/1 Meeting
Needed for Team A on -End
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
CSC Electronics Problem Report CSCE I&C
Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks
CSC Shift Training and Operation + B904 Status
Presentation transcript:

21-Jan-2009CSC - ESSC Jan'091 Report on CSC for ESSC Prepared for CSC by Fred Borcherding FNAL

21-Jan-2009CSC - ESSC Jan'092 CSC Electronics Status Conducted a Work Shop at Rice U in Houston January 8 th through 11 th –Description: –What problems were encountered during running? Of those, what have been fixed What the plans to fix the remaining problems What resources, (people, material, time) are needed to resolve the problems –What improvements should we make (as distinct from fixing problems) What are the plans? What resources are needed to make the improvement? –Maintenance Estimate For each module, how many do we have? How many spares do we have? Where are the spares? What level of engineering effort is needed to maintain the element? –Indico Link >

21-Jan-2009CSC - ESSC Jan'093 From CSC Q4’08 Report Short Term detailed Milestones and deliverables. Resolve issues with the operation and control of the Maraton power supplies Identify and fix outstanding Canbus issues Finalize optimal power-on and power-off sequences. Replace faulty resistors in HV system Investigate losses of communication between HV system and PVSS Reduce rate of CRC errors in DAQ system Develop a loopback test between the TMB and ALCT to allow the testing of the skew-clear cables between the chambers and peripheral crates. Further analyze the loss of programming of EPROMs Identify and correct problems with alignment system picomotor control

21-Jan-2009CSC - ESSC Jan'094 LV Resolve issues with the operation and control of the Maraton power supplies –OPFC Failure of ON/OFF switch –Quick disconnect in input power circuit fails –With CMS working with Wiener on a fix Failure upon power on – Soft Start Issues –Turning on too soon after power off greatly increases possibility of failure –Administrative controls have been put into place –Hardware change begun Lack of remote monitoring and control –With CMS working on modification to add remote Identify and fix outstanding CANBus issues –CANBus for Maraton system Expect new server from Wiener Work to analyze CANBus lines to find and fix any deficiencies Start now, intensify when LV back on, work until resolved –CANBus for PCMB system > remote ON/OFF at pcrates > uses ELMB’s Work to analyze CANBus lines to find and fix any deficiencies Work with ELMB experts to resolve further issues Start now and work until resolved

21-Jan-2009CSC - ESSC Jan'095 LV cont. Finalize optimal power-on and power-off sequences. –Observe several issues that have been reduced by a more complex power-on sequence –To proceed further we need to combine slow control of CANBus devices and VME devices –Work will start with availability of cooling and CMS LV in cavern –Work will take about 1 month –Can operate with present power-on procedure while working on enhancements

21-Jan-2009CSC - ESSC Jan'096 HV Replace faulty resistors in HV system –Work started at ISR –Work will take ~2 technicians ~2 months –Working serially > most of CSC can have HV ON during work Investigate losses of communication between HV system and PVSS –HV computers located in S1A10 …

21-Jan-2009CSC - ESSC Jan'097 FE Reduce rate of CRC errors in DAQ system –Rare but disruptive of Global DAQ Develop a loopback test between the TMB and ALCT to allow the testing of the skew-clear cables between the chambers and peripheral crates. –Present methods are not effective in timing in a small percentage of chamber electronics –Developing a more rigorous testing procedure to bring the lost communication rate down Further analyze the loss of programming of EPROMs in on-chamber electronics boards –Believed to be partially caused by power-on sequence > see previous slide –Have isolated problem boards for investigation on the bench –Have instituted work around to automatically identify problem situations and rapidly respond with operator intervention

21-Jan-2009CSC - ESSC Jan'098 CSC Electronics Inventory Following slides list status of electronics inventory for the CSC –For the record …

21-Jan-2009CSC - ESSC Jan'099 On-Chamber Boards CSC On-chamber Electronics Boards installed /total /spares CFE xxxxxCFEB one type, 5(4) per chamber 2268 /2532 /137 ALC xxxxxALCT288 ME1_1,ME1_3144 /?? /~10 ALC xxxxxALCT384 ME1_2, ME234_2216/?? /11 ALC xxxxxALCT672 ME2_1, ME3_1, ME4_1108 /130 /9 ALM xxxxxALCT_MEZ one type, 1 per chamber468 / /20 LVD xxxxxLVDB one type, 1 per chamber468 /?? /?? LVM xxxxxLVMB one type, 1 per chamber468 /?? /?? AFE xxxxxAFEB one type, many per chamber10,152 /11,616 /1054 NOTE: Have ~18 spare chambers, each with full complement of on-chamber boards

21-Jan-2009CSC - ESSC Jan'0910 LV & PCRATE CSC LV Power Supplies > Wiener Maraton System, Air Cooled installed /total /spares PFCB LVPS 72500xxxx OPFC Bin (Crate) 6 /8 /2 PFCM LVPS 71960xxxx OPFC Module 36 /40 /4 MARS LVPS 72920xxxx Maraton Supply 36 /40 /4 MARC LVPS 72960xxxx Maraton Crate 36 /38 /2 Peripheral Crate, pcrate, Components installed /total /spares EMUPC PC xxxx pcrate crate75 /60 /15 CBP PC xxxx pcrate back plane 70 /60 /10 CRB PC xxxx pcrate regulator brd88 /60 /28 PCM PC xxxx PCMB 79 /60 /19 ELM PC xxxx ELMB on PCMB 79 /60 /19 Pcrate boards installed /total /spares VCC PC xxxx Crate Controller 73 /60 /15 CCB PC xxxx Clock and Control84 /60 /24 DMB PC xxxx DAQ Mother Brd. 550 /468 /82 MPC TriggerPC xxxx Muon Port Card70 /60 /10 TMB TriggerPC xxxx Trig Mother Brd. 570 /468 /102 RAT TriggerPC xxxx RPC ALCT Trns. 690 /468 /222

21-Jan-2009CSC - ESSC Jan'0911 CSC HV HV ME1/1> CAEN System installed /total /spares CcHV13052##Crate2 /2 /0 CcHV13052##Board16 /18 /2 HV> UF Custom System installed /total /spares HVUF Custom Systeminstalled /total /spares HDS xxxxxDistribution /157 /31 HDL xxxxxDistribution /179 /36 HDC xxxxxDistrib Crate30 /34 /4 HDP xxxxxDistrib Patch8 /9 /1 HMB xxxxxMaster board40 /50 /10 HMC xxxxxMaster Crate8 /10 /2 HPS xxxxxPrimary HV src8 /10 /2 HCC xxxxxControl comp2 /3 /1 HLV xxxxxLV power supply2 /3 /1 HMP xxxxxMaster Patch2 /5 /3 HLP xxxxxLV patch panel2 /4 /2 HCP xxxxxControl patch2 /4 /2 HPC xxxxxPrimary HVPS ctr8 /8 /2 (spare parts)

21-Jan-2009CSC - ESSC Jan'0912 CSC Track Finder CSC TF installed /total /spares CCCTrigger TF U CAEN VME 1 /3 /1 0Trigger TF wiener crate ( trigger) 1 /2 /1 0Trigger TF TF backplane 1 /3 /2 DDUTrigger TF DDU 1 /2 /1 DDETrigger TF DDU extender 1 /3 /1 TSPTrigger TF SP 12/17 /2 CCBTrigger TF CCB 1 /3 /1 0 Trigger TF muon sorter 1 /5 /3 0TriggerTF CSC-DT transition board12/ 18/ 5 NOTE: Covered under Trigger as well

21-Jan-2009CSC - ESSC Jan'0913 CSC FED FED Crates> Wiener 9U VME installed /total /spares FED FED FED Crate 4 /4 /0 (1 sp PS) FED Boards> OSU Custom Brds installed /total /spares CVC FED CAEN 6U CC 4 /5 /1 –One sent to CAEN for repair, good spare is loan from pool DCC FED Clock and Control 4 /6 /2 –2 more to be shipped to CERN DDU FED Data Board 36 /?? /?? Pcrate Network > GBit installed /total /spares GNS GIG GBit Ethernet switch 8 /10 /2 (1 sp installed)