Pre-Construction Activities to include: - Provide effective overlap period and oversight of effort - Estimates during - CPM Schedule - Identify lead-time.

Slides:



Advertisements
Similar presentations
Managing the Health and Safety of Contractors
Advertisements

1.1Definition of Construction:. Is the process by which material, equipment, machinery are assembled into a permanent facility. Is the process by which.
Construction Project Coordination Presented by: Philip H
PROJECT MANAGEMENT PROJECT MANAGER ENGINEERING MANAGER PROCUREMENT MANAGER CONSTRUCTION MANAGER.
CARLIN LAW GROUP, APC Grounds for Additional Time and/or Compensation A.Express Changes B.Constructive Changes C.Differing Site Conditions D.Express Suspension.
Field Orders on Construction Contracts Guidance Document CLC-8 May 13, 2013.
ABC Change Orders College of Environmental Design
Construction Management. Players Owner – owns project upon completion of construction –Private – owner owns land and pays for construction of facility.
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
Contract and Project Management: A Field Perspective Moderator Michael Peek, PE CCE CFM Office of Engineering and Construction Management.
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
Oklahoma Department of Transportation Susan McClune Regulatory Services.
DOE OFFICE OF INDIAN ENERGY Step 4: Project Implementation 1.
Module 11 Session 11.2 Visual 1 Module 11 Executing and Controlling the Work Session 11. 2: Managing Contracts.
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
Construction Operations Ch 15. Opening a Project Before Contractor is allowed on site it must –Make sure contractor has all required insurance –Obtain.
David Saenz CM/GC April 8, 2005 CM/GC Overview CM/GC Plan & Status Systems Description Cost Estimate Construction Schedule.
1 Preconstruction Site investigation, Scheduling, Estimating, and design Preconstruction Site investigation, Scheduling, Estimating, and design Prepared.
Determination of Construction Contract Duration for Public Projects in Saudi Arabia By: Ahmed Saleh Al-Sultan, June 1989 Presented by Sameh Elish January.
Activities CTC-415. Activity Consumes Time Usually consumes resources (cure time for concrete) Definable start and finish Assignable – V. important –
Pre-Construction Phase 1 - Job Site Conditions Work Plan -2.
Construction Contract Administration (ENGC 6363) ( FIDIC Chapter 15) EMPLOYER BY TERMINATION Presented by: Mustafa Al tayeb.
ESTIMATING By Laith Jacob.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Richard Hislop FAC October Construction Safety Richard Hislop.
Chapter 1 Introduction. 1-1 THE CONSTRUCTION INDUSTRY construction contracting is a very competitive business with a high rate of bankruptcy. construction.
November 3, 2002CVEN349 - Maxwell1 Procurement and Materials Management Module 6.2 November 3, 2002.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Construction Contract Documents
Prof. Awad S. Hanna S TEPS IN THE D EVELOPMENT OF A D ETAILED E STIMATE.
CIVL202 Construction Engineering I Tutorial 2 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
David McGiven FAC: Construction April 2006 Facility Advisory Committee (FAC) Construction Procurement David.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Cindy L. Menches, Ph.D., P.E., The University of Texas at Austin Electri’ International Annual Meeting, July 2007 Characteristics+ Planning Achieving Performance.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
Detailed Quantity Estimating Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
Specification & Quantities Estimating
Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement David J. Paveglio Contracts Administrator Laboratory Office Buildings CFAC Review - November 9-10, 2009.
CON 4003 CVE 4073/5073 Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
David Saenz FAC Review CF Design, Cost and Schedule Oct 27, 2005 CF Overview & Status Design Status CMGC Status Latest.
CHAPTER#17 ENGINEERING MAINTENANCE MANAGEMENT Lecture No. 16Course: Engineering Management MED DEPARTMENT, U.E.T TAXILA COURSE INSTRUCTOR : PROF. DR. SHAHAB.
Agency Construction Management :CM NOT AT-RISK
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Introduction to Procurement for Public Housing Authorities Sealed Bids Unit 5.
1 Service Coordinator Orientation FN R. CollESH SectionX8518.
Solicitation VA69D-16-R-0583 Rehab Renovation Pre-Proposal Conference June 22, :00am CDT NCO 12 Great Lakes Acquisition Center.
USAID Afghanistan Engineering Support Program (ESP) Pre-Bid Meeting July 14, 2015.
Bi-Annual Pavement, Drainage & Dust Control Work at Industrial Park East Pre-Bid/Proposal Meeting Brenda C Trevino, PE, PMP October 18, 2016.
Pre-Bid/Proposal Meeting
Installation Procurement Package
CONTRACT ADMINISTRATION
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Pre-Construction Services
(Additional materials)
Flooding Walkdown Guidance
9/18/2018 Bids CONTRACTING Khamis…..
STEPS IN THE DEVELOPMENT OF A DETAILED ESTIMATE
Contract and tender form Phases of designing Phases of implementation
Conventional Facilities (WBS 1
Phase 1 Statement of Work Preconstruction “Plan The Work”
Chapter 2 – Review ‘construction management’
CEM 515 Done by: Abdulkarim Sulais
Directed Change Constructive Change
CMGC Overview SLAC Site Plan Systems Description Construction Schedule
Presentation transcript:

Pre-Construction Activities to include: - Provide effective overlap period and oversight of effort - Estimates during - CPM Schedule - Identify lead-time for critical items - Design coordination - Constructability reviews - Value Engineering reviews Site investigation

Prof. CM Effort A - Develop construction bid packages - Develop list and contact potential bidders - Develop prequalification criteria - Solicit bids - Recommend award to SLAC for approval of subcontractor - Award contract to subcontractors

B-Develop Project Management Plan (PMP) Construction Management Plan outlines project scope, organization, and specific approach project. Project Safety Plan to accomplish project specific identifying job hazards, safety performance and individuals responsible for project safety. Procurement Plan identifies systems, methods and procedures for solicitation to subcontractors. Quality Control and Assurance Plan method of controlling time, cost and quality of various management tasks specific to the project.

C- CM shall provide all materials, labor, and services required to construct the Project: All general conditions including: - Field personnel - Office staff - Temporary offices - Temporary construction - Safety implementation - Construction equipment - Coordination of all subs - Project administration - Construction waste management - Commissioning

SITE INVESTIGATION AND CONDITIONS AFFECTING The Contractor acknowledges that it has taken steps reasonably necessary to ascertain the nature and location of the work, and that it has investigated and satisfied itself as to the general and local conditions which can affect the work or its cost, including but not limited to: 1- Conditions bearing upon transportation, disposal, handling, and storage material. 2- The availability of labor,water,electric,power,and roads. 3- uncertainties of weather, river stages, tides, or similar physical conditions at the site)) 4- The conformation and conditions of the ground, and the character of equipment and facilities needed preliminary to and during. work performance

5-The Contractor also acknowledges that it has satisfied itself as to the character, quality, and quantity of surface and subsurface materials or obstacles to be encountered insofar as this information is reasonably ascertainable from an inspection of the site, including all exploratory work done by the Government, as well as from the drawings and specifications made a part of this contract. Any failure of the Contractor to take the actions described and acknowledged in this paragraph will not relieve the Contractor from responsibility for estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expense to the Government.

b) The Government assumes no responsibility for any conclusions or interpretations made by the Contractor based on the information made available by the Government Nor does the Government assume responsibility for any understanding reached or representation made concerning conditions which can affect the work by any of its officers or agents before the execution of this contract, unless that understanding or representation is expressly stated in this contract.