I3 EURONS Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005 Contract for the EURONS project has been signed (~14 M€) Project started on 1.1.2005.

Slides:



Advertisements
Similar presentations
The AGATA Project First 4pi -ray spectrometer built completely from Germanium detectors. Based on the novel technique of gamma-ray tracking. Measures radiation.
Advertisements

Alex C. MUELLER, NuPECC meeting, Athens, March EURONS 1st annual report: Generalities (I) With an EC contribution of 14,056,000 EURONS is.
Călin A. Ur* for the AGATA Collaboration INFN – Sezione di Padova
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Preparation of FAIR EU FP7 preparatory phase proposals J. Eschke, FAIR.
Advanced GAmma Tracking Array
1 Andreas Görgen EURISOL – EURONS Town Meeting, Helsinki,
N Network for Active Targets 12 institutions (France, Spain, UK, Germany, Poland) GANIL, France CENBG Bordeaux, France SPhN/DAPNIA/DSM Saclay, France IPN.
AGATA Introduction John Simpson Nuclear Physics Group.
Helsinki Sept 2007 S.Galés ERA-NET Supporting Cooperation for research infrastructures in all S&T fields 7 th FP Call Capacity Work Program: Infrastructures.
Purpose: Integration of AGATA detectors in triple modules Acceptation tests of triplets (energy resolution, crosstalk,…) Complementing the scanning table.
Coupling an array of Neutron detectors with AGATA The phases of AGATA The AGATA GTS and data acquisition.
The AGATA project concept of  - ray tracking design and development Witek Męczyński The Henryk Niewodniczański Institute of Nuclear Physics Polish Academy.
ACTAR - EURONS Collaboration meeting Project Coordinator: H. Savajols / P. Roussel-Chomaz Participating Institutions: 1.GANIL (AC) / DAPNIA (AC) / CENBG.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR EU Design Study 4th Annual Report meeting February 12, 2009 J. Eschke,
AGATA: Advanced Gamma Tracking Array
Characterisation & PSA Team Meeting Presentations –Liverpool Status, Andy Boston/Matt Dimmock (Liverpool) –Crosstalk properties of AGATA detectors, Bart.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Overview of EuCARD-2.
Large-Scale Integrating Project SEVENTH FRAMEWORK PROGRAMME THEME 1: HEALTH Optimization of Treatment and Management of Schizophrenia in Europe General.
Alex C. Mueller, MANETEURONS PCC-Meeting, Mainz (Germany), April 2006 EURONS 1st annual report: Generalities (I)  With an EC contribution of 14,056,000.
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
John Simpson Nuclear Physics Group Daresbury Laboratory The AGATA project NUSTAR ’05 University of Surrey January 2005.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
Coordinating EC Research Projects Paul Drath Singleimage Limited 3 Foundry Walk St Ives Cambs PE27 5FW phone fax
AGATA: Advanced Gamma Tracking Array
EURONS The EUROpean Integrated Infrastructure Initiative in Nuclear Structure within FP6 Present status and remarks to NuPECC Alex C. Mueller,
Reporting during the lifetime of the project Moldova – Research Horizon 30 January 2013 Kristin Kraav.
Ciemat Centro de Investigaciones Energéticas, Medioambientales y Tecnológicas Daniel Cano-Ott, Joint EURISOL/EURONS town meeting, Helsinki, September 16.
Monica Pantea, MANETGA and PCC meeting in Vienna :30Coffee & Welcome 10:00Opening (ACM) 10:15Overview Annual Report 2007 (ACM) 11:15coffee 11:30Scientific.
Project Reporting for the EuCARD Integrating Activity Project Based on: - Provisions of the Grant Agreement (GA) and its annexes - FP7 Guide on Project.
Wolfram KORTEN, JRA-02 AGATA Irfu AGATA week, Orsay (France), January 15-18, 2007 AGATA within EURONS Objectives: Development, construction, commissioning.
Wolfram KORTEN, JRA-02 AGATAEURONS PCC-Meeting, Mainz (Germany), April 2006 Status of the AGATA project Recent developments Milestones and deliverables.
ESTELA Summer Workshop, 26 June 2013 The EU-SOLARIS project.
FINUPHY Instrumentation for radioactive nuclear beam facilities Rauno Julin FINUPHY Madeira, February 9, 2005.
F. Azaiez (IPN-Orsay) The European Collaboration for Stable Ion Beams – ECOS Pushing the limits with high intensity stable beams A typical bottom up initiative.
Astroparticle Physics for Europe ASPERA – 2 Workpackage 5 1. Workpackage 5 - European-wide common calls and other common actions Deborah Miller, STFC.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt CBM Collaboration meeting Status Interim MoU J. Eschke, GSI.
1 Status of the EU-FP7 funded Integrating Activity “European Nuclear Science and Applications Research” (ENSAR) Marek Lewitowicz (GANIL) on behalf of Muhsin.
AGATA and the Physics Programme Dino Bazzacco INFN Padova on behalf of the AGATA collaboration NuPECC Meeting with Funding Agencies November 29, 2004,
NCSR “Demokritos” University of Istanbul INRNE, Sofia University of Sofia VINCA, Belgrade PMF, Univ. of Novi Sad IRB, Zagreb NIPNE, Bucharest UPB, Bucharest.
EURONS The EUROpean Integrated Infrastructure Initiative in Nuclear Structure within FP6 Present status and remarks to FINUPHY Alex C. Mueller,
AGATA The Advanced Gamma Ray Tracking Array Ancillary Detector and Integration W.G. Status of the Working Group and Tasks A.Gadea.
CARBOOCEAN Annual meeting, December 2007 Finance and administration by Hege D. Høiland SIXTH FRAMEWORK PROGRAMME PRIORITY “Global Change.
“Reporting Procedure for I3” Seadatanet kick-off Heraklion, June 8-9, 2006 Lorenza Saracco, European Commission DG Research.
AGATA AGATA Advanced Gamma-Ray Tracking Array Next-generation spectrometer based on  -ray tracking Radioactive and stable beams, high recoil velocities.
AGATA Week Introduction John Simpson Nuclear Physics Group GSI, February 2005.
Synergy Group for Front-End Electronics and DAQ (SGFD)
“European Nuclear Science and Applications Research 2” (ENSAR2)
DATA PROCESSING Working Group Digitisation P. Medina Pre-processing hardware I. Lazarus Pre-processing algorithms W. Gast Global Trigger and SynchronisationM.
CERN, 15/03/05EURISOL - Beta Beam Task1 EURISOL and the Beta-Beam Task Status and Planning Michael Benedikt Mats Lindroos AB-Department, CERN.
Data Analysis Working Group AGATA Tasks of the WG Schedule Johan Nyberg, ADAWG meeting, June 12-13, 2003, NBI.
Alex C. Mueller for EURONSNuPECC Meeting, Venice (Italy), March 2005 I3 EURONS: a status report to NuPECC March 2005.
Thomas Gutberlet HZB User Coordination NMI3-II Neutron scattering and Muon spectroscopy Integrated Initiative WP5 Integrated User Access.
Daniel Bloor & The AGATA Collaboration IoP NPPD Conference, University of Glasgow, 05/04/11. Development of a simulation package for fragmentation reactions.
Budget & Finance. OUTLINESOUTLINES Part 1 : The Eden project in figures Part 2 : Financial relations within the 6th FP 2 1. Roles in the financial process.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
WP6 – Monitoring and Evaluation 17th November 2014 Rome.
Advanced Gamma Tracking Array Andy Boston The Advanced Gamma Tracking Array
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
AGATA; status, plans and opportunities
AMICI WP1 – Management, coordination and dissemination
AGATA MANAGEMENT BOARD AND TEAMS
Discussions on preparations for future (joint) research projects
1st PSeGe Workshop, IPNO & CSNSM Orsay 3rd -4th October 2016
for the EURISOL Steering Committee
Status of the AGATA installation at GANIL
European Nuclear Science and Applications Research (ENSAR)
European Nuclear Science and Applications Research (ENSAR)
From a project idea to the kick-off meeting
AMICI WP1 – Management, coordination and dissemination
Presentation transcript:

I3 EURONS Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005 Contract for the EURONS project has been signed (~14 M€) Project started on and ends on  Coordinator and management team : GSI  Scientific manager : A. Mueller (IN2P3)  Project coordination committee (PCC) comprises one representative from each activity 1 st PCC meeting held at Funchal (Madeira) on 7./  General assembly (GA) comprises one representative from each institution 1 st GA planned for September 2005 Status report of the AGATA joint research activity EURONS : Integrated Infrastructure Initiative (I3) for Nuclear Structure 45 contractors and 33 other institutions from 27 countries 27 activities: 8 Trans-National Access (TNA) to research infrastructures, 9 Joint Research Activities (JRAs), e.g. AGATA, 8 Networking activities

I3 EURONS Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005  Presentation of all activities  Activity information sheet (AIP)  reporting every 6 months Monitoring the progress of the project (milestones & deliverables) Preparation of the (annual) reports (management & activity)  Discussion of management organization, payments etc.  Executive board of the PCC was elected (3x2 members + manager)  Advance payment from GSI in early March : 2/3 of request for the first 18 months’ period Yearly payments after submission of each annual report Audit certificate needed from each contractor every 2 years  check with your local administration  Consortium agreement (CA) distributed to all institutions Comments by the end of February Signatures needed by March 31st, 2005 “Late comers” will accede to the contract Minutes of the first PCC meeting

I3 EURONS Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005 Objectives: Development, construction, commissioning and evaluation of the first modules for an advanced gamma ray tracking array (AGATA) including digital front-end electronics and a data acquisition system capable of handling the gamma-ray tracking procedure Description of work: Task T-J02-1: General Tasks Subtask T-J02-1.1: Conceptual design Subtask T-J02-1.2: Subsystem commissioning Subtask T-J02-1.3: Prototype commissioning Task T-J02-2: Detector module and infrastructure Subtask T-J02-2.1: Characterization Subtask T-J02-2.2: Assembly Subtask T-J02-2.3: Tests Task T-J02-3: Local Level Processing system Subtask T-J02-3.1: Electronics Subtask T-J02-3.2: Pulse-shape analysis Subtask T-J02-3.2: PSA evaluation Task-T_J02-4: Global Level Processing system Subtask T-J02-4.1: Trigger and system integration Subtask T-J02-4.2: Gamma-ray tracking Subtask T-J02-4.3: DAQ Task-T_J02-5: MC simulation and data analysis Subtask T-J02-5.1: Physics emulator Subtask T-J02-5.2: Data bases Subtask T-J02-5.3: Analysis routines AGATA JRA : Objectives and Tasks

I3 EURONS Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005 Task Nr Task nameGeneral TasksDetector module & Infrastructure Local Level Processing Global Level Processing MC Simulations & Data Analysis 1 st sub-taskConceptual design of the full AGATA array INFN Padua Characterisation of asymmetrically shaped 36- fold segmented Ge detectors Univ. Liverpool Prototype electronics for analogue and digital signal processing CCLRC Daresbury Global trigger, synchronisation and integration of ancillary detectors INFN Padua Conceptual array design and Monte- Carlo simulations incl. ancillary detectors INFN Legnaro 2 nd sub-taskCommissioning of all sub-systems Task leaders Cryostat and pre-amplifier developments, detector module assembly and acceptance test Univ. Köln Pulse-shape analy­sis (PSA) algorithms TU München Gamma-ray tracking (GRT) algorithms CSNSM Orsay Databases for event data storage IPN Lyon 3 rd sub-taskCommissioning of the full AGATA prototype system Project leader Test benches and infra­ structure for “in-beam” tests, incl. ancillary detectors IReS Strasbourg Simulation of detector signals and comparison with experimental data CEA Saclay Data acquisition, and storage, run control, graphical users interface IPN Orsay Generic data analysis routines Uppsala Univ. Tasks and Responsibilities

I3 EURONS Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005 Milestones : Short titleDate due Date accomp. Remarks/ lead participants M-J02-1.1Conceptual design of the full array finalised06/05INFN-Padua M-J02-1.2AGATA demonstrator sub-systems commissioned12/07Task leaders M-J02-1.3Final report delivered to managing institution12/08Project leader M-J02-2.1Asymmetric Ge detector prototype characterized06/06U-Liverpool M-J02-2.2AGATA prototype triple-cluster module assembled12/06U-Köln M-J02-2.3Infrastructure for in-beam tests commissioned12/07IN 2 P 3 -IReS M-J02-3.1Prototype local level processing electronics delivered12/05CCLRC M-J02-3.2Pulse-shape analysis algorithms optimised06/06TUM/IPNO M-J02-3.3Pulse-shape analysis performance evaluated06/07CEA-DSM M-J02-4.1Prototypes for data acquisition hardware delivered12/05INFN-Padua M-J02-4.2Gamma-ray tracking algorithms optimised06/06IN 2 P 3 -CSNSM M-J02-4.3Data acquisition system commissioned06/07IN 2 P 3 -IPNO M-J02-5.1Physics emulator integrated in MC simulations12/05INFN-Legnaro M-J02-5.2Event data base storage commissioned12/06IN 2 P 3 -IPNL M-J02-5.3Analysis routines for event data commissioned12/07U-Uppsala [i] [i] For every subtask there must be one milestone (there might be more than one if necessary) [ii] [ii] Month at the end of which the deliverable will be available. Month 1 = January All delivery dates are relative to this start of the project. Milestones

I3 EURONS Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005 Deliverables:Short titleLead contractor Date due 5 Date deliver ed Type [ii] [ii] Disseminat ion level [iii] [iii] Remarks : D-J08-1.1Delivery of the full AGATA prototype system CCLRC12/07R/PUProject leader D-J08-1.2Final evaluation report on the full prototype system commissioning CEA-DSM12/08R/PUJRA coordinator D-J08-2.1Delivery of prototype triple-cluster module U-Köln12/06P/PU D-J08-2.2Report on the characterisation of the detector module U-Liverpool12/08R/PU D-J08-3.1Delivery of prototypes of digital signal processing electronics IN2P306/06P/PU D-J08-3.2Report on local level processing system and pulse shape analysis IN2P3/TUM12/08R/PU D-J08-4.1Delivery of prototypes of specific data acquisition hardware INFN06/06P/PU D-J08-4.2Report on global level processing system and gamma-ray tracking IN2P3/INFN12/08R/PU D-J08-5.1Report on MC simulations and data analysis routines U-Uppsala12/08R/PU Deliverables and lead contractors

I3 EURONS Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005 AGATA JRA participant (Nr. & short name) PersonnelNetworkingOverheadsTotal EU First 18 months 28. CEA Saclay GSI Darmstadt GANIL Caen Univ. Jyväskylä INFN Legnaro INFN Milano INFN Padova Univ. Sofia Univ. zu Köln TU München NBI Copenhagen CNRS/IN2P Istanbul University Univ. Warsaw NIPNE Bucharest KTH Stockholm Uppsala Univ CCLRC Daresbury Univ. Liverpool Univ. York Project Coordination (CEA-Saclay) TOTAL Finances and first payment

I3 EURONS Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005 Participant No. 28 (Coord.) Participant short name CEA/ DSM Saclay GSI GANIL JYU INFN U-Sofia U-Köln TUM UKBH Personnel/PM EUPIEUPIEUPIEUPI EUEU EUPIEUPIEUPIEUPI 48 months presently spent next 18 months Personnel / k€ 48 months presently spent next 18 months Other / k€ 48 months presently spent next 18 months Sum / k€ 48 months Presently spent next 18 months Activity information sheet

I3 EURONS Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005 Participant No Participant short name IN2P3 U-Istanbul U-Warsaw NIPNE KTH U-Uppsala CCLRC U- Liverpool U-York Personnel/PM EUPIEUPIEUPIEUPIEUPIEUPIEUPI EU PI EUPI 48 months presently spent next 18 months Personnel / k€ 48 months presently spent next 18 months Other / k€ 48 months presently spent next 18 months Sum / k€ 48 months presently spent next 18 months Activity information sheet (cont.)

I3 EURONS Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005 Proposed Lines of Action (major role for RI)  Continue and improve the current line of action on RI  Reinforce RI action adding new line for development of new ‘unique’ RI Vision. Roadmap for RI in Europe in the next years. The Roadmap can have periodic updates and revisions.  Criteria for priority projects in Roadmap : Pan-European interest; potential impact on ERA; Size (>50M€); maturity of the project and timeliness; Existence of multi-annual and long-term budgetary planning, Quality of management.  AGATA has good chances to become a priority RI project Research Infrastructures in FP7 (as seen by the EC)

I3 EURONS Wolfram KORTEN, JRA-02 AGATA AGATA week, GSI, 21. February 2005  Nuclear Physics community should submit one I3, instead of I3HP and I3EURONS; but NuPECC is open for suggestions.  A committee should be formed soon to look into the various issues and ‘new’ criteria connected with I3 applications in FP7.  New design studies and new construction projects should be inventorised. Current priorities for construction: FAIR and SPIRAL-2 Other installations such as a “High-intensity stable beam facility” and other initiatives will be discussed later (according to M. Harakeh)  The AGATA collaboration must start defending its interests Research Infrastructures in FP7 (as seen by NuPECC)