Activities related to Experiments during TS3 and YETS 15-16 5 th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.

Slides:



Advertisements
Similar presentations
CERN – March 10, 2006TAN Installation Workshop - The LHCf experimentOscar Adriani The LHCf experiment Measurement of Photons and Neutral Pions in the Very.
Advertisements

The LHCf experiment Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Letter Of Intent: May 2004 Technical report: September 2005.
Walls crates cables gas chambers electronics CERN adb.
Saverio MINUTOLITIG meeting, 10 February Report on T1 installation activities and achievements made during this shutdown.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.
P. 1Mario Deile – TOTEMino: Infrastructure Status and Schedule Mario Deile Zone 2.Gas system 3.Cabling 4.Cooling water 5.Counting-Room 6.Safety.
The LHCf experiment Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Letter Of Intent: May 2004 Technical report: September 2005.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire 1CERN - 4th November 2011 Experience from Construction.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC workshop – Working group: Two beam hardware.
Forward physics pertinent ECRs Mike Lamont, Samy Chemli.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Upgrades and Activities of 13kA EE systems during LS1 Bozhidar Panev TE-MPE-EE
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
Integration, Installation & Infrastructure Ans Pardons, with input from the WP4 members September 2014.
LS2 Other LHC Experiments Mike Lamont Thanks to: Michael Rijssenbeek (AFP) Joachim Baechler (TOTEM) Karl-Heinz Hiller (ALFA)
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
STATUS OF HO Sudhakar Katta TIFR, Mumbai India-CMS meeting, Delhi 27 th Sept 2007.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
ECRs and ES for the LHC Last presentation on the 26 th of August 2015 (LMC 232) S. Chemli for EN-MEF-DC LMC xxx.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
STATUS REPORT: ALIGNMENT OF COLLIMATORS P. BESTMANN /O. ABERLE Collimation Working Group 26/09/2011.
EN-CV interventions during YETS
LHCf: installation & commissioning Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
TS planning meeting 7 to 11 Nov Technical stop Wk 45: Monday 7 th to Friday 11 th November Ramp down magnets (SL): Mon 8:00 – 8:30 (latest) RP search.
R2E relocation & shielding activities Anne Laure Perrot EN/MEF- LE R2E project meeting, 23 rd October 2012.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
ALICE Arturo Tauro Werner Riegler.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
V. Bobillier1 Cable installation status.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
 Based on 2+2 Roman Pot Stations on each side of ATLAS at ~ 240 m from the Interaction Point  Aim in Run 2 at measuring the total cross section and.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Overview of the LHC Year End Technical Stop
Preamble Run 2 and Run 3 will see the continued exploitation of the forward physics potential of the LHC in the long straight sections (LSS) either side.
LHC forward detectors EN/MEF roles & responsibilities MEF group meeting, 24 th November 2010 A. L. Perrot- EN/MEF-LE.
Installation of the T600 at Fermilab CSN2, September 22,
R ADIATION P ROTECTION ASPECTS LSS1 - TAN REGION Cristina Adorisio (CERN - DGS/RP)
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
TE-CRG Activities D. Delikaris, TE-CRG.
Power, Cooling, Cables, Simulations of Heat Dissipation Short overview of ongoing work on these points Technical Coordination (Rolf Lindner et al.) Cooling.
Joint LHC Machine-Experiments Workshop on Very Forward Detectors - 25 January 2007 Beniamino Di Girolamo - CERN PH ATLAS Roman Pots status, commissioning.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE)
LHC schedule status K. Foraz EN-MEF 12/04/2013LSC - K. Foraz1.
Preparation & Commissioning of TOTEM for the Run-II of LHC S.Giani on behalf of the TOTEM Collaboration.
Integration of forward physics detectors into the LSS of the LHC D. Macina (TS/LEA) Technical Support 2004 Workshop.
ELENA installation progress F. Butin / ELENA collaboration.
The timing upgrade project of the TOTEM Roman Pot detectors
Status of the ATLAS Forward Proton Detectors Michael Rijssenbeek for the ATLAS AFP group 25FEB2016.
Francois and Lau EATM 17 July 2012
ELENA installation and commissioning status
BA6 – crab cavity activities in EYETS
Introduction Status before the 2009 run Results from the 2009 run
CMS Area Working Group Meeting
on behalf of the RF group
LHC Experimental Vacuum Systems Status October ‘07
LS2 LHC forward experiments
K. Foraz on behalf of OSS members
Status of CMS-PPS timing detectors
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments Technical Coordination

ECRs TREX 5th November, TS3 LHC-X8FC-EC-0002Temporary Installation of LHCb Scintillating Fibre Tracker Test-Beam Module in RB84 YETS LHC-LJ-EC-0044Change of Powering for Q4 in IR1 LHC-XAFP-EC-0002Installation of the ATLAS/AFP stations, Phase-1 LHC-XRP-EC-0012CT-PPS Timing& tracking detectors in horizontal Roman Pots(for standard optics) LHC-XRP-EC-xxxxTOTEM Timing detectors in vertical Roman Pots (for high beta*) Eng. Review on November the 10 th. Feasibility check with MEF (G. Canale) and EN-HE during TS3 Activities for TS3 given to MEF Coordination and agreed. ECR covering the TS3 and YETS (addendum to the existing Upgrade ECR) to come after TS3.

Point 1TS3 TREX 5th November,  ZDC activities: ZDC transfer to the LHC tunnel and installation Work in USA15 and check operation of HV, NIM modules, TDAQ partition Cabling 4 big PMTs in ZDC sector Connect HV, analog cables, NIM crate Connect laser Test connectivity Connect pixel HAD1 sector ZDC removed during YETS  W51

Point 1TS3 TREX 5th November,  AFP RP stations: Installation of secondary vacuum pumps and + crate, connection to mains (LHC UPS) in RR17 Compressed air infrastructure in the tunnel – VIC only Installation of short missing cable trays at both ATLAS arms cable tray on the floor between stations and patch panel ( m, vertical cable tray behind QRL) short cable tray at RR17/RR13 entry floor opening at RR17/13 (cable passage)  ? short cable tray in UJ17/UJ13 Mark beam line position and start and end points of stations on the tunnel floor (preparation of drilling)

Point 1 YETS TREX 5th November,  AFP RP stations: Install C6R1 during YETS The works involve: Cabling Trigger (1R, 1L) and control cables (1R ?) Cabling campaign for control  between W1 and W2  1wk allocated Common visit scheduled during TS3 Safety requirements: Method statement for the work to be carried out. Erection and verification of mobile tower scaffolding, and its proper use. Mobile elevated working platforms if they will be used Safety at CERN Electrical Awareness HO/BO Biocell training Masks and all other individual protection Personnel Dosimeter Drilling for the supports Vacuum chamber modification between Q5 and Q6 (1R) Equipment commissioning from surface

Point 1 YETS TREX 5th November,  New Water Cooled Cables for ALFA One extra DC water-cooled cable will be added for Q4.L1 and Q4.R1 (RR13, RR17)

Point 5 TS3 TREX 5th November,  ZDC activities: Removal of absorber bars from TANs and installation of ZDCs; Connection of HV and readout cables; Test of the functionality of the calorimeter. ZDC removed during YETS  W51 Crane in Operation in LSS5

Point 5 TS3 TREX 5th November,  TOTEM timing detector sector 45: 1.Exchange detector package for RP 220m near vertical top: stop cooling open cooling circuit stop vacuum pump - ventilate the RP 220m near vertical top remove present detector package from Roman Pot Measuring of thin window gap with LASER install new detector package with Diamond timing detector in Roman Pot reconnect vacuum -> leak test reconnect cooling -> cooling test 2.HV connectors and HV lines install HV connectors on HV cables in tunnel install (attach) two little racks to the RP unit 220m near install SAMPIC board and PC in this rack with timing electronic components

 TOTEM timing detector sector 45 & 56 (ECR under preparation): Installation of TOTEM clock distribution and timing detectors starting on TS3 and progressively on YETS & TSx  CMS TOTEM PPS timing & tracking sector 45 & 56 (ECR under preparation): Installation of coax cable for clock distribution  Open issue Installation of detector packages for both tracking and timing starting on YETS and progressively on TSx Main services existing, but new installation of small racks & patch panels  LHC beam line for TOTEM: Depending on pressure development the installation of a pump between Q5 and first Roman Pot unit 210 near might be necessary (sector 45 & 56) Point 5 YETS TREX 5th November, 20159

Point 8TS3 TREX 5th November,  Shower Counters: Calibration measurements on LHCb forward shower counter stations. Both sides RB84 and RB86 IT 8L & 8R will be empty from Tuesday to Thursday View of the shower counter stations B0 integrated in the LHC layout (courtesy of EN/MEF-INT).

Point 8 TS3 TREX 5th November,  Scintillating Fibre module: Installation of scintillating fibre module. RB84 side IT 8L will be empty from Tuesday to Thursday Placement of the fibre module on the ECAL table and the shielding wall of RB

Conclusions TREX 5th November, TS3 Requests from experiments are well integrated in the TS3 Schedule and there are no constraints. YETS -Activities related to ATLAS AFP and CMS TOTEM PPS need to be carefully planned due to potential co-activity issue with 5 th axis collimators restoring. -Not all activities concerning TOTEM timing detector and CMS TOTEM timing & tracking are announced, so the potential co- activities issues are not yet evaluated (drum passage, …)