FourStar Status Eric Persson (OCIW) Presented By.

Slides:



Advertisements
Similar presentations
MMIRS 1 MMIRS MMT and Magellan Infrared Spectrograph Brian McLeod.
Advertisements

FourStar Image Motion Stephen Smee (410)
Astronomical Detectors
Upcoming Review of the Hall D Photon Beam and Tagger Richard Jones, University of Connecticut, for the GlueX collaboration GlueX Collaboration Meeting.
NGAO Instrumentation Overview September 2008 Updated Sean Adkins.
MICE Collaboration meeting at CERN March 28 – April 1, 2004 MICE Cooling Channel --- AFC Module work group report Wing Lau – Oxford.
Spectrometer Solenoid and RFCC Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Spectrometer Solenoids and Coupling Coils Primary Activities and Risks Going Forward Spectrometer Solenoids Completion of SS#2 magnetic mapping Completion,
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
Linac Marx Modulator Update Trevor Butler 10/29/2014.
Presentation EddiCam consortium, FF, Madrid 13/06/2002 Eddington programmatic status Fully approved by SPC as part of ESA’s science program as project.
Experimental Facilities DivisionOak Ridge SNS INSTRUMENTS OVERVIEW R. K. Crawford Instrument Systems Senior Team Leader September 10, 2004 HYSPEC IDT Meeting.
Juan Estrada July 25, Focal Plane Detectors WBS 1.2 this talk Breakout session L. Buckley-Geer J.E. T.Diehl H. Cease Multi CCD (part of WBS 1.5)
17/18 May 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 17/18 May 2003 Univ. of Michigan,
FNAL Meeting, July 2006 Basti, Bedeschi, Raffaelli, INFN-Pisa 1 ILC cryomodule mechanical work at INFN-Pisa  Ongoing work  Near term future  Manpower.
Characterization of a Large Format HgCdTe on Silicon Focal Plane Array
Telescope Integration and Tests Tuesday Afternoon.
Space Research Centre EDDICAM Interests in EDDINGTON Professor Alan Wells and Dr Matthew Burleigh Space Research Centre, University of Leicester.
STATUS OF THE MEG CRYOSTAT Construction status Schedule ____________________________________________________________ 04/Agust/06 F. Raffaelli, L. Delfrate.
Status of the MaPMT o Status quo o Ongoing work o Issues – mechanics – electronics – schedule o Conclusions LHCb meeting Milano Franz Muheim.
Abe Seiden December 2003 SCT Week S USA SCT Barrel Module Assembly SCT Week CERN December 2003 Presented by Abe Seiden U.C. Santa Cruz.
GBT Focal Plane Array Development Program Steven White Program Manager.
Status of Torino-Dubna Production Aluminum Plates production: Torino: steady production ongoing, 2715 plates cut, 194 chambers=48MB1.
Focal Plane Detectors and CCD Camera Roger Smith Steven Kahn DECam CD-1.
Target Mechanical R/D Magnetic Immersion Effects (Daresbury Experiment) Pass-Through/Seals (Vacuum, Water union)- leaks, survivability Thermal Loading.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
DBSP-R Upgrade Progress Review The DBSP-R Team DBSP-R Progress Review.
THE WEEKLY DETECTOR Taormina, Italia June, 2005 € 0.00 The Nerds are Back In Town !! This Week’s Forecast Clear Skies Seeing 0.4” Some Ash Warm.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
9/24/05MagE Update SAC meeting Developments with MagE Complete layout of Spectrograph structure and camera by B. Bigelow –Structure will be all anodized.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
Page 1HMI/AIA Science Meeting – February 13, 2006 HMI Instrument Status HM/AIA Science Meeting February 13, 2006 Barbara Fischer HMI Deputy Program Manager.
ATLAS Pixel Detector July 2003 SC Pixel Meeting N. Hartman LBNL 1 Pixel Support Tube WBS Santa Cruz Cost Workshop July 9, 2003.
Extended Detector Cutoff Considerations WFIRST Project Office May
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
Integration and Installation Status for Collaboration Meeting Ans Pardons, 29/9/2015.
MMIRS 1 Harvard-Smithsonian Center for Astrophysics Magellan SAC 9/05 MMIRS Status Upate Presented by A. Szentgyorgyi P.I. B. McLeod.
ATLAS LAr Forward Calorimeters C. Zeitnitz (Universität Wuppertal) for the ATLAS LAr Community.
K-Band Focal Plane Array Steven White Program Manager.
GBT Focal Plane Array K band 7 Pixel Steven White Program Manager.
February 4, 2007 Global Design Effort 1. February 4, 07 Global Design Effort IR&MDI: 2 Tuesday’s discussion EDR organization Work Package distribution.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
Single-Phase ProtoDUNE Construction Planning Jim Stewart LBNC January 11, 2016.
H. Weick, 8 th MAC meeting, GSI, Super-FRS Status Target Area H. Weick / M. Winkler 8th FAIR - Machine Advisory Committee Meeting
Update on the ESS monolith design Rikard Linander Monolith and Handling Group ESS Target Division TAC 10, Lund, Nov 5,
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
Focal Plane Arrays and Focal Plane Electronics for Large Scientific Telescopes The HAWAII-2RG (H2RG) is the leading IR focal plane array (FPA) in ground-
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
Laser Control Status A. Masi, T. Feniet, K. Szczurek Awake Technical Board November 12 th 2015 Thanks for inputs from: M. Donze`, V. Fedosseev, C. Hessler.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
Mandate Priorities Other tasks Membership Forthcoming reports to CTC
Jim Fast Pacific Northwest National Laboratory
WBS 1.03 Readout Systems Scope, Cost and Schedule
Francois and Lau EATM 17 July 2012
The European Contribution to eXTP
Far Detector Activities Late 2017 – Early 2018
2K CB FDR Overview:  Agenda, Charge, Review Process
Intra-pixel Sensitivity Testing Preliminary Design Review
LSST Camera Detector Status
FourStar 4K x 4K JHK imager
Welcome & Charge for the Meeting
Introduction and Overview
LCLS Undulator System Status and Schedule
Instrument Overview Larry Springer HMI Program Manager
Test Beamline System Requirements and Charge to PDR Committee
SNS-PPU upgrades the existing accelerator structure
Detector Proto-Technical board Sep 30, 2010
Presentation transcript:

FourStar Status Eric Persson (OCIW) Presented By

May 20, 2007FourStar Status2 Instrument Overview Vacuum Vessel Electronics Rack Dewars Focal Plane Mechanisms Camera Module Window 200K Radiation Shield Conical Adapter 77K Radiation Shield

May 20, 2007FourStar Status3 CDR & Post CDR Response Many useful recommendations from the CDR panel. –Load ring modifications –Camera module support –Gear materials and coatings –Heaters for warmup –Cold clamps All CDR action items have been addressed at this time. CDR recommendations have resulted in a multitude of design simplifications and modifications.

May 20, 2007FourStar Status4 Recent Milestones 1.Contract signed for construction of vacuum vessel 2.Detectors finished and ready for delivery

May 20, 2007FourStar Status5 Detectors Had the choice of the best 4 out of 5. Done. The 4 Science-grade detectors are now in hand. –Best specs: QE: J 0.79 H 0.90 Ks 0.97 stddev(QE): J H Ks 0.01 readnoise: 18 e- rms (CDS) dark: e-/sec full “well”: 150,000 e- crosstalk: 6.1% (total) in 8 surrounding pixels bad & hot pixel count: 0.01% (mostly dead) –Testing caveats: 1.QE at K cannot be real 2.readnoise of other devices not as low

May 20, 2007FourStar Status6 Ongoing Work at Carnegie 1.Lifetime testing of mechanisms at 77K, 2.Developing array test dewar for testing ASICs and engineering grade array when electronics arrive, and 3.Building focal plane mechanisms.

May 20, 2007FourStar Status7 Ongoing Work at IDG/JHU Orders are being released for cart hardware. Parts are being fabricated for the electronics racks and the various chassis. Drawings sets for remaining thermal and opto- mechanical hardware being prepared for release.

May 20, 2007FourStar Status8 Schedule

May 20, 2007FourStar Status9 Narrow Band Filters They will work in the fast beam at the price of a 25% reduction in flux for a clean profile. There are 7 free positions. 1.We ask the SAC members to poll their institutions in order to propose filters and to find funding for them soon. They should be ordered by September 1, The relevant parameters are (only) central operating wavelength and bandwidth. 2.The team will work with the SAC to choose the set of <= 7 filters that can be accommodated in the 2 filter wheels. FourStar will not be paying for the filters.

May 20, 2007FourStar Status10 Narrow Band Filters (concl’d) 3.The team will design and specify the filters. There are several additional parameters that must be designed in, viz., substrate thickness for parfocality, blocking, and extra wavelength shift in the fast beam. 4. Carnegie will then order the filters and invoice the proposers’ institutions with an extra charge for design. Typical costs are likely to be ~ $10K per filter. 5. Once the instrument has been closed up in preparation for its commissioning run, it will not be reopened solely for the purpose of inserting a new or replacement filter (because of risk).