MMIRS 1 Harvard-Smithsonian Center for Astrophysics Magellan SAC 9/05 MMIRS Status Upate Presented by A. Szentgyorgyi P.I. B. McLeod.

Similar presentations


Presentation on theme: "MMIRS 1 Harvard-Smithsonian Center for Astrophysics Magellan SAC 9/05 MMIRS Status Upate Presented by A. Szentgyorgyi P.I. B. McLeod."— Presentation transcript:

1 MMIRS 1 Harvard-Smithsonian Center for Astrophysics Magellan SAC 9/05 MMIRS Status Upate Presented by A. Szentgyorgyi P.I. B. McLeod

2 MMIRS 2 Harvard-Smithsonian Center for Astrophysics Magellan SAC 9/05 Basic Operational Modes Imaging 7 x 7 arcminute FOV 0.2 arcsecond pixels Y, J, H & K wavelength coverage Spectroscopy Multi-slit (4’x7’) or longslit (7’) –J, H, K @ R=3000 –J+H, H+K @ R=1400

3 MMIRS 3 Harvard-Smithsonian Center for Astrophysics Magellan SAC 9/05 MMIRS EXTERIOR TRUSS ELECTRONICS RACKS (2) GUIDER/ WFS MOS SECTION DETECTOR PRE-AMP’S CAMERA SECTION TELESCOPE TRUSS- WELDED ASSEMBLY WITH BOLT INTERFACES TO TELESCOPE & CRYOSTAT ELECTRONICS RACK TRUSS (2) MOS SECTION

4 MMIRS 4 Harvard-Smithsonian Center for Astrophysics Magellan SAC 9/05 Corrector Optics (warm) Guider/WFS (warm) Detector LN2 Tank/ Optical Bench Collimator Camera Slit Masks Dekker

5 MMIRS 5 Harvard-Smithsonian Center for Astrophysics Magellan SAC 9/05 Project Timeline TSIP Proposal Feb 2003 Start of Work Dec 2003 PDR July 2004 CDR May 2005 Optics orderedAugust 2005 Begin manufacture Oct 2005 Delivery to MMT early 2007 Delivery to Magellan July 2007

6 MMIRS 6 Harvard-Smithsonian Center for Astrophysics Magellan SAC 9/05 Current Status Optics: Contract has been awarded to Janos. Mechanical Design: Solid modeling 98% done. Vacuum vessel RFQ released. LN2 tank/optical bench RFQ finished next week. Electrical Design: Design and component selection are complete. Detailed drawings in progress. SWIRC pathfinder controller in operation reading 32 channel MMIRS engineering device at MMT. Software: Design complete. Many heritage components. Test dewar: In house. Servo controlled cooling tests about to begin. Detector testing to follow.

7 MMIRS 7 Harvard-Smithsonian Center for Astrophysics Magellan SAC 9/05 LCO Issues MMIRS instrument weight 3244 lb. – can be lifted by crane in dome. MMIRS weight at Cass (w/ adapter, &c) is 4471 lb. – also acceptable. SAO & LCO collaborating on ops plans for prepping, mounting, operating and (if necessary) repair MMIRS @ LCO – clean room essential component. Expect to refine ops plan during October 2005 engineering.