OLD DOMINION ASV TEAM Co-Captain Chris Shertzer Co-Captain Benjamin McKinley Adam Stofko Richard Blanchette Brittany Garman Ganesh Balasubramanian Zach.

Slides:



Advertisements
Similar presentations
OLD DOMINION ASV TEAM Chris Shertzer, Co-Capt. Ben McKinley, Co-Capt. Adam Stofko Richard Blanchette Brittany Garman Ganesh Balasubramanian Zach Carpenter.
Advertisements

REPLACING EAST SIDE OF BRIDGE in WEST Section Sank in 1979 Storm REBUILT and Opened in 1982 EAST Section REBUILDING Shown here HOOD CANAL.
Team #1 PICA: Design Decisions and Current Status Report A. BallK. Wiersma N. JenA. Sterk.
Exercise (5).
Team Filthy Filters Mid-semester Design Review
Wearable Wireless Physiological Sensors Daniel Bishop Rosy Logioia Josh Handley Gouri Shintri Phillip Hay Clay Smith Christina Hernandez Adam Stevenson.
Members: Yamamoto, Jamie- Programming (Leader) Ganiban, Aurelio- Design/Construction Yatogo, Radd- Programming/Scribe Kohatsu, Troy- Design/Construction.
Phase V Presentation Group 7 Thomas Kudej Marko Sutovic Timothy Smith.
Team Organization Brittany Capalbo Co-Captain Team 75.
25 April Securing Wireless Sensor Networks Cheyenne Hollow Horn SFS Presentation 2005.
ODOS The Office of the Dean of Students. Projects Interactive Campus Map Global Positioning System - Device for the Visually Impaired Adjustable Table.
Custom Wordpress theme Thomas Smith, Chris Gorrod, Sam Paisley & Kathleen Jackson.
KTD Micromouse OverviewApproach Potential problems Personal Expectations Team Goals.
Wireless Controller wireless.controller.googlepages.com Spring 2007 Preliminary Design Review March 3, 2007 wireless.controller.googlepages.com.
Final Presentation.  Chris Johnson, Team Leader  Tim Hahn  Bradley Lesher  Michael LaPuma  Project Advisor: Gene Hou  Student Advisor: Stanton Coffey.
GROUP MEMBERS: JOHN MERRITT FRANCES OTHERSEN CHRIS DAVIS JAMES CHAPMAN JOSEPH FANNING Baja SAE ® Series 2015 Status Update.
OLD DOMINION ASV TEAM Capt. Chris Shertzer Capt. Chris Shertzer Adam Stofko Richard Blanchette Brittany Garman Ganesh Balasubramanian Zach Carpenter.
Nova Labs - RhinoHawk Introduction Meeting March 20 th, 2014.
OLD DOMINION ASV TEAM Chris Shertzer, Co-Capt. Ben McKinley, Co-Capt. Adam Stofko Richard Blanchette Brittany Garman Ganesh Balasubramanian Zach Carpenter.
Knee-Loading Device Group Members: Jonathan Coulter Liang Dong Chris Holmes Haroon Osmanzada Faculty Advisors: Dr. Sebastian Bawab Dr. Stacie Ringleb Naval.
ASV Senior Design Project Midterm Report Fall 2012 Team: Leader: Daniel Becker Treasurer: Andrew Hinojosa Manufacturing: Samantha Palmer Design/Assembly:
Project GabE ECE 135 – Spring 2005 Omar Al-Jadda Patrick Crosby Rahmin Sarabi Adam Durity.
R.O.M. System Team: RISC Takers Team Members: Paul Banks, Yorick Robinson, Evan Tu, & Hans Weggeman Louisiana State University – Senior Design October.
Section 20.1 Elements of Advertising Chapter 20 print advertisements Section 20.2 Advertising Layout.
Exercise (4). Exercise Assume the following jobs are executed with one processor, with the jobs arriving in the order listed in the table. – Suppose a.
EE/CS 480 Fall University of Portland School of Engineering Project Osprey RC-VTOL Team Aaron Duane Jesse Fledderjohann Hilary Henderson Chris Hope.
EE/CS 480 Fall University of Portland School of Engineering Project Osprey RC-VTOL Team Aaron Duane Jesse Fledderjohann Hilary Henderson Chris Hope.
Status Report 4 CAPS Cynthia Reyna David Rodriguez Cynthia Salas 9/22/08 Child Abuse Prevention System is a device that will monitor and log abusive hits.
ASV Senior Design Project Final Report Fall 2012 Team: Leader: Daniel Becker Treasurer: Andrew Hinojosa Manufacturing: Samantha Palmer Design/Assembly:
5/22/00 Models in I.E. Lecture 5 Project Management Network Models.
ASV Senior Design Project Midterm Report Fall 2012 Team: Leader: Daniel Becker Treasurer: Andrew Hinojosa Manufacturing: Samantha Palmer Design/Assembly:
26 th May  Antimicrobial Copper is the worlds most effective touch surface material, killing greater than 99.9% of bacteria within 2 hours of exposure.
Storyboarding The Why and the How…. A set of drawings that represent screen layout sequences First used by filmmakers to plan the sequences of movie scenes.
Automated Guided Vehicle Team E. AGV Description.
Greg Davis Scott Hambleton Jon Holton Chris Johnson Chris Monfredo 5/13/14Rochester Institute of Technology1 P14251 Underwater Acoustic Communication.
Washington Built Green Homes Measure Update May 13th,
By: Jennifer Liem.  Hardware ◦ Head : Philip Blackman  Danny  Tony  Mune  Software ◦ Head: Stephan Fabel  Xi Hang  Jennifer.
Aircraft Carrier Draft Measurement
Lesson Planning Mindstorms NXT. Points to consider before creating a lesson. Sturdy structures instructional builds  original builds Functions moving.
Aircraft Carrier Draft Measurement Ship Draft Team - Fall 2015.
Unit 15: SDLC I October 12, Systems Development.
ODU SAE FORMULA MAE 435. Team Members Advisors Dr. Bawab Prof. Luetke Team Leader Ryan Atkinson Element Analysis Davis Moore Punit Dave Attenuator Shauna.
Design Team # 4 Design of low cost flight computer for unmanned aerial vehicles Status Report # 5 Ryan Morlino Chris Landeros Sylvester Meighan Stephen.
CPU Algorithm Turnaround time :- Amount of time to execute a particular process. Waiting time – amount of time a process has been waiting in the ready.
PRODUCTION PLANNING. Process Planning Management Approval design production.
3.0 DESIGN PROCESS FOR THE PROPOSED PROJECT 3.1 TIME PLANNING Now, having understanding the Project Management in general and its strategy in the project.
ATF2 Magnets ATF2 Magnets KNU,Korea ATF2 mtgSpencer & Lam SLAC Lessons learned 1 Lessons learned from designing, fabricating & installing ATF2 magnets.
 AKA Carpenters Square  Used for measuring right angles  Most common use is for stairs and rafters.
Engineering Design Review Example
March 6, 2014 Client: Dr. Michael Hinchey Group Name: LifeSub Engineering Group Number:M14 Group Members:Ajanthan Asokan William Barkhouse Matthew Browne.
DD Progress Report 2. APPROX. % OF TOTAL PROJECT COMPLETE: –75% of the total project including documentation.
Introduction to Web Authoring Ellen Cushman Class mtg. #18.
L5 Computing Team Project Final Presentation Guidelines.
The 4th Annual Colorado Robot Challenge
Robofish Charging Station (RCS) P17250
Design and Development of an Autonomous Surface Watercraft
Introduction to Web Authoring Ellen Cushman cushmane
CSU Robot Challenge 2010 Team: Ben Gindl, Katie Mantell, Sean Throckmorton, Tim Schneider, Travis Histed Advisors: Dr. Azer Yalin, Dr. Mark Lindsay, Grant.
GANTT CHART Text Text Example
Team 1: 32 responses Team 2: 55 responses Team 3: 29 responses
Learn about Ellis Island and the Statue of Liberty
The arrival of our first Hummer.
Lesson 05: Iterations Today is FRIDAY! It's A Programming Day!
Lesson 04: Conditionals Team Seating Chart
Project GabE ECE 135 – Spring 2005
Changes made to the WA-LISTS in 2015
Progress Report (October 2 - 9, 2002)
use your multiplication chart for help:)
PREPARING FOR YOUR VISIT Visual Story.
Presentation transcript:

OLD DOMINION ASV TEAM Co-Captain Chris Shertzer Co-Captain Benjamin McKinley Adam Stofko Richard Blanchette Brittany Garman Ganesh Balasubramanian Zach Carpenter

HULL DEVELOPMENT Aluminum frame and demi-hull pontoon system Aluminum frame and demi-hull pontoon system Hydrostatic analysis completed. Hydrostatic analysis completed. Product drawings have been completed and submitted for fabrication. Product drawings have been completed and submitted for fabrication.

PROPULSION A Kort nozzle has been designed and tested using Solid Works A Kort nozzle has been designed and tested using Solid Works After approval has been given, 3D printing will begin After approval has been given, 3D printing will begin

OBSTACLE AVOIDANCE Code has been written Code has been written Waiting for test apparatus to begin debugging Waiting for test apparatus to begin debugging

AUTOMATED DOCKING Code is ready for testing Integration into the main code is being discussed Challenge Station layout

ACOUSTIC BEACON POSITIONING A device has been developed A device has been developed Testing is underway Testing is underway 3D Rhino model (McNeel North America, Seattle, WA)

UNDERWATER LIGHT IDENTIFICATION A test device has been built A test device has been built Awaiting light arrival Awaiting light arrival

GANTT CHART