REPLACING EAST SIDE OF BRIDGE in 2009. WEST Section Sank in 1979 Storm REBUILT and Opened in 1982 EAST Section REBUILDING Shown here 2004-2009 HOOD CANAL.

Similar presentations


Presentation on theme: "REPLACING EAST SIDE OF BRIDGE in 2009. WEST Section Sank in 1979 Storm REBUILT and Opened in 1982 EAST Section REBUILDING Shown here 2004-2009 HOOD CANAL."— Presentation transcript:

1 REPLACING EAST SIDE OF BRIDGE in 2009

2 WEST Section Sank in 1979 Storm REBUILT and Opened in 1982 EAST Section REBUILDING Shown here 2004-2009 HOOD CANAL BRIDGE Ferry Dock

3 1. Build New Section with new columns under existing section 2. Move old section over 3. Move new section over new colums 4. Remove old section and old colums New - Wider Approach COMPLETED

4 Starting NEW APPROACH Section

5 SETTING BRIDGE ANCHORS

6

7 TRANSITION Section - READY Photos by Jack and Gwen Duzenski

8 READY to lift

9 LIFTING

10

11 Transition section in on barge No Traffic here!

12 Breaking pontoons into two sections

13 Meanwhile persons who need to traverse the canal, turn the road into a parking lot.

14 Ferry Dock You can spot this area on slide #2

15 MOVING DAY

16 LOWER SECTION MOVING OUT

17 MOVING NORTH

18 OLD SECTIONS - OUT OF THE WAY

19 Good view of WEST DRAW SPAN CANAL IS BEING CLEARED

20 A NEW – WIDER PONTOON IS MOVED IN

21 And here comes the new TRANSITION Section

22 WAIT! Here comes a Sub.

23

24

25

26 Look, the Sub’s Conning Tower is as wide as the road way.

27 5-17-2009

28

29

30 New TRANSITION Section is squeezed into place

31 DRAW SPAN IS IN PLACE

32 ALL IS IN PLACE

33 BREAKING OLD COLUMN INTO SECTIONS > > >

34 REMOVE OLD SUPPORTS > > >

35

36

37 HERE COMES TRANSITION SECTION

38

39 PLACING EXPANSION JOINT

40 POURING CONCRETE IN HOLE USED TO REMOVE OLD BRIDGE SUPPORT

41 NEW SIGNS

42

43 CHECKING GATE

44 DRIVING ACROSS - TOWARDS PORT ANGELES

45

46 TURNED AROUND - HEADING BACK EAST

47

48 THE EAST END

49 THE LAST FOOT FERRY