Hydrological forecasting: application, uncertainty, estimation, data assimilation and decision making EGU – Wien, 7th april 2011 The Po flood management.

Slides:



Advertisements
Similar presentations
Climate Prediction Applications Science Workshop
Advertisements

System Development Life Cycle (SDLC)
Modelling the rainfall-runoff process
LOGO Bangkok, May 2009 Water Resources Management in Ba River Basin under Future Development and Climate Scenarios Presented by: Nguyen Thi Thu Ha Examination.
Using Probalistic Quantitative Precipitation Forecasts PQPFs within a hydro-meteorological chain within a hydro-meteorological chain R. Marty, A. Djerboua,
Directions for this Template  Use the Slide Master to make universal changes to the presentation, including inserting your organization’s logo ‒ “View”
Importance of Land use management on the Flood Management in the Chi River Basin, Thailand Kittiwet Kuntiyawichai Bart Schultz Stefan Uhlenbrook F.X. Suryadi.
SIPR Dundee. © Crown copyright Scottish Flood Forecasting Service Pete Buchanan – Met Office Richard Maxey – SEPA SIPR, Dundee, 21 June 2011.
This presentation can be downloaded at – This work is carried out within the SWITCH-ON.
Project Cost Management Estimation Budget Cost Control
Extreme Value Analysis, August 15-19, Bayesian analysis of extremes in hydrology A powerful tool for knowledge integration and uncertainties assessment.
Colorado Basin River Forecast Center Water Supply Forecasting Method Michelle Stokes Hydrologist in Charge Colorado Basin River Forecast Center April 28,
Water Supply Forecast using the Ensemble Streamflow Prediction Model Kevin Berghoff, Senior Hydrologist Northwest River Forecast Center Portland, OR.
Local flood forecasting for local flood risk areas Keith Beven, David Leedal, Peter Young and Paul Smith Lancaster Environment Centre.
Implementation of the fully-distributed and physically-based FEST-WB model A. Amengual Grup de Meteorologia, Departament de Física, Universitat de les.
Data-assimilation in flood forecasting for the river Rhine between Andernach and Düsseldorf COR-JAN VERMEULEN.
History and Evolution of the PMP/PMF
Dr. R.P.Pandey Scientist F. NIH- Nodal Agency Misconception: A DSS takes decisions ---(No)
GEOSS Water Services Showcase Demos 2, 3, 4 AIP-6 Water SBA Team Proposals 17 May 2013.
Water availability assessment in data scarce catchments: Case Study of Northern Thailand Supattra Visessri 1st Year PhD Student, Environmental and Water.
1 Flood Hazard Analysis Session 1 Dr. Heiko Apel Risk Analysis Flood Hazard Assessment.
DRR workshop WMO Commission for Hydrology Geneva June 2013 Ann Calver 1.
EDS Inventory Management Tabletop Exercise [Exercise Location] [Exercise Date] [Insert Logo Here]
Rome, 15 May hrs 4th ODS3F Progress Meeting, 15 May 2014, Rome ODS3F project overview Giovanni Laneve DIAEE – Università di Roma ‘La.
INSTYTUT METEOROLOGII I GOSPODARKI WODNEJ INSTITUTE OF METEOROLOGY AND WATER MANAGEMENT TITLE : Report of Rapporteur on Extreme Potential Floods AUTHOR:
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 4 Project Integration Management.
MRC Water Utilisation Programme 20 May 2003 Knowledge Base & DSF Software Presenter: Dr Jon Wicks, Software Integration Specialist in association with.
ODOT 2015 Geo-Environmental Conference
Application of a rule-based system for flash flood forecasting taking into account climate change scenarios in the Llobregat basin EGU 2012, Vienna Session.
ROFFG Romania Flash Flood Guidance System. The Romania Flash Flood Guidance System is an adaptation of the HRC Flash Flood Guidance System used in various.
January 29, 2013 Lake Diefenbaker Reservoir Operation Proposed Operating Manual Development.
1. Session structure Definition Overview Actions Challenges Outputs Exercise Module 8 Prepare management procedures 2.
TECHNICAL GUIDE No.1 Estimation of Future Design Rainstorm under the Climate Change Scenario in Peninsular Malaysia Research Centre for Water Resources.
Gabriele Coccia (1)(2) and Ezio Todini (1)(2) (1) University of Bologna, Bologna, Italy (2) Idrologia e Ambiente s.r.l, Napoli, Italy Probabilistic flood.
Flash Floods in a changing context: Importance of the impacts induced by a changing environment.
13th EMS Annual Meeting & 11th European Conference on Applications of Meteorology (ECAM) | 09 – 13 Sep.2013 | Reading, United Kingdom ASI – AS19 Interfacing.
Flash flood forecasting in Slovakia Michal Hazlinger Slovak Hydrometeorological Institute Ljubljana
July 5-9, 2009, Univ. of Bologna, Italy HARP - A Software Tool for Fast Assessment of Radiation Accident Consequences and their Variability Petr Pecha.
WISKI Open Water and Ice Bernard Trevor, M.Eng. P.Eng. River Forecast Section Environment and Sustainable Resource Development WISKI ESRD Users Conference.
Advanced interpretation and verification of very high resolution models National Meteorological Administration Rodica Dumitrache, Aurelia LUPASCU,
EU Project: Trans-Boundary River Management Phase II for the Kura River basin – Armenia, Georgia, Azerbaijan
RFC Climate Requirements 2 nd NOAA Climate NWS Dialogue Meeting January 4, 2006 Kevin Werner.
Martin Rule Curve Study Ashley McVicar, APC Maurice James, Water Resources Consulting LLC.
International Workshop on Flash Flood Forecasting – Costa Rica March 2006 WORLD METEOROLOGICAL ORGANIZATION Weather, Climate and Water INTERNATIONAL WORKSHOP.
IMPACT 3-5th November 20044th IMPACT Project Workshop Zaragoza 1 Investigation of extreme flood Processes and uncertainty IMPACT Investigation of Extreme.
The uncertainty in the prediction of flash floods in the Northern Mediterranean environment; single site approach and multi-catchment system approach CIMA.
MRC-MDBC STRATEGIC LIAISON PROGRAM BASIN DEVELOPMENT PLANNING TRAINING MODULE 3 SCENARIO-BASED PLANNING for the MEKONG BASIN Napakuang, Lao PDR 8-11 December.
Regional Flood Awareness Workshop December 3, 2009 Jeff Graschel Service Coordination Hydrologist Lower Mississippi River Forecast Center.
VERIFICATION OF A DOWNSCALING SEQUENCE APPLIED TO MEDIUM RANGE METEOROLOGICAL PREDICTIONS FOR GLOBAL FLOOD PREDICTION Nathalie Voisin, Andy W. Wood and.
Pearl River Coordination Meeting October 7, 2009 Dave Reed Hydrologist in Charge Lower Mississippi River Forecast Center.
Probabilistic Forecasts - Baseline Products for the Advanced Hydrologic Prediction Services (AHPS) Dave Reed HIC – LMRFC 2006 NWA Annual Meeting October.
EVALUATION OF A GLOBAL PREDICTION SYSTEM: THE MISSISSIPPI RIVER BASIN AS A TEST CASE Nathalie Voisin, Andy W. Wood and Dennis P. Lettenmaier Civil and.
Models Platform for Danube Forecasting PROJECT DANUBE WATER INTEGRATED MANAGEMENT.
UNIT – III FLOODS Types of floods Following are the various types of floods: 1.Probable Maximum Flood (PMF):This is the flood resulting from the most sever.
CARPE DIEM 2 nd meeting Critical Assessment of available Radar Precipitation Estimation techniques and Development of Innovative approaches for Environmental.
WATER RESOURCES DEPARTMENT
AMPHORE - Interreg III B Medocc
LEPS VERIFICATION ON MAP CASES
Hydrologic Considerations in Global Precipitation Mission Planning
Change in Flood Risk across Canada under Changing Climate
Module 8 Prepare management procedures
Chapter 10 Verification and Validation of Simulation Models
Application of satellite-based rainfall and medium range meteorological forecast in real-time flood forecasting in the Upper Mahanadi River basin Trushnamayee.
Overview of WMO Strategic Planning Initiative
Forecasts and Warnings
Overview of Models & Modeling Concepts
What forecast users might expect: an issue of forecast performance
Real-time Sierra Nevada water monitoring system
M. Kezunovic (P.I.) S. S. Luo D. Ristanovic Texas A&M University
Altai flood’s 2014 and model precipitationg forecasts
Presentation transcript:

Hydrological forecasting: application, uncertainty, estimation, data assimilation and decision making EGU – Wien, 7th april 2011 The Po flood management in Italy: guidelines and methodologies G.Ricciardi[3], L.Casicci [1], L.Fortunato[1], S.Pecora[3], N.Rebora[2], M.Vergnani [1] [1] AIPO Interregional Agency for the Po river [2] CIMA Research Foundation, Italy [3] ARPA EMR Environmental Agency of Emilia Romagna Region

Hydrological forecasting: application, uncertainty, estimation, data assimilation and decision making EGU – Wien, 7th april 2011 Summary Introduction Scheme Example Actual development Further steps

Hydrological forecasting: application, uncertainty, estimation, data assimilation and decision making EGU – Wien, 7th april 2011 Introduction An operative forecasting and modeling system for hydrological cycle and extreme events is adopted on the Po river It is composed of three modelling chains simulating hy/hy behaviour feeded by observations and forecasting meteorological data A methodology for utilization of system output is needed expecially to compare system capabilities with resources and needs and finally choose the best operational procedures This methodologic scheme is here presented It is based on a State approach. State changes are defined according to observed and predicted values of hydrological parameters and traveling times of river sections Analysis of input/output data and of forecast performances are taken into account

Hydrological forecasting: application, uncertainty, estimation, data assimilation and decision making EGU – Wien, 7th april 2011 Scheme State changes Flow for each state Details Intersection reality - information

Hydrological forecasting: application, uncertainty, estimation, data assimilation and decision making EGU – Wien, 7th april 2011 Forecasted event on secondary reaches Guided by observation Guided by run on observation Forecasted event on the main reach State 1 (forecast) State 2 (surveillance ) State 3 (monitoring) Imminent event on the main reach End of event Not confirmed event State changes (information layer) Secondary reaches: Response time less than 12 h Guided by deterministic forecast

Hydrological forecasting: application, uncertainty, estimation, data assimilation and decision making EGU – Wien, 7th april Meteorological Forecast analysis 2.Deterministic Hydrological Forecast (on a reach list) 3.Probabilistic HF analysis (only if an event is forecasted) Go on with State 1: no Forecasted Events Go to State 2: FE on the main reach Go to State 3: FE on secondary reaches Step flow in State 1 (Forecast)

Hydrological forecasting: application, uncertainty, estimation, data assimilation and decision making EGU – Wien, 7th april Deterministic Hydrological forecast 2.Observed simulation HF ( if an event is forecasted) Go back to State 1: no event is forecasted in Step 1 Go back to Step 1: no event is forecasted in Step 2 Go to State 3: an event is forecasted in Step 2 Step flow in State 2 (Surveillance)

Hydrological forecasting: application, uncertainty, estimation, data assimilation and decision making EGU – Wien, 7th april Observed level analysis 2.Unbiased observed simulation Hydrologic Forecast (no Threshold Exceedings in Step 1) 3.Deterministic HF (no TE in Step 2) Continuous monitoring: TE in Step 1 Real Time notifications High frequency monitoring: TE in Step 2 and low frequency monitoring is on Low frequency monitoring: TE in Step 3 and monitoring on shortest response time reaches (e.g. 12h) is off Go back to State 1: no more TE in Step 3 (end of event) Step flow in State 3 (Monitoring)

Hydrological forecasting: application, uncertainty, estimation, data assimilation and decision making EGU – Wien, 7th april 2011 Saturation degree of sub basins (AMC) Forecasted and observed total rainfall on sub basins (LAM runs) (aggregation on RT) Localization of critical reaches (scenarios) Details: Meteorological forecast analysis

Hydrological forecasting: application, uncertainty, estimation, data assimilation and decision making EGU – Wien, 7th april 2011 oHF based on observed precipitation up to T0(now) + forecasted precipitation from T0 to LAM lead time (e.g. 72 hour) oHF based on observed precipitation up to T0 + null precipitation from T0 to hydrological lead time (Observed simulation HF) Details: Deterministic Hydrological forecast analysis

Hydrological forecasting: application, uncertainty, estimation, data assimilation and decision making EGU – Wien, 7th april 2011 Details: Deterministic Hydrological forecast analysis

Hydrological forecasting: application, uncertainty, estimation, data assimilation and decision making EGU – Wien, 7th april 2011 Details: Probabilistic Hydrological forecast analysis

Bollettino di previsione, vigilanza e monitoraggio per il bacino del fiume Po Parma, 15 luglio 2010 Servizio IdroMeteoClima 23 November 2002 Observed simulation forecast Deterministic forecast – COSMO I7 Probabilistic forecast – COSMO LEPS ForecastSurveillance State 1 Hydrologic hydraulic forecast analysis - PIACENZA Time (hour)

Bollettino di previsione, vigilanza e monitoraggio per il bacino del fiume Po Parma, 15 luglio 2010 Servizio IdroMeteoClima 24 November 2002 Hydrologic forecast analysis - PIACENZA Observed simulation forecast Deterministic forecast – COSMO I7 Probabilistic forecast – COSMO LEPS State 2 Time (hour) Surveillance

Bollettino di previsione, vigilanza e monitoraggio per il bacino del fiume Po Parma, 15 luglio 2010 Servizio IdroMeteoClima 26 November 2002 Hydrologic forecast analysis - PIACENZA Observed simulation forecast Deterministic forecast – COSMO I7 Probabilistic forecast – COSMO LEPS State 3 Time (hour) Monitoring

Hydrological forecasting: application, uncertainty, estimation, data assimilation and decision making EGU – Wien, 7th april 2011 Example -I

Hydrological forecasting: application, uncertainty, estimation, data assimilation and decision making EGU – Wien, 7th april 2011 Example - II Piacenza: sample analysis of maximum levels

Hydrological forecasting: application, uncertainty, estimation, data assimilation and decision making EGU – Wien, 7th april 2011 Example - III Observed Peak water level: 6.14 m Peak discharge: mc/s Date of peak: 18/03/2011 5:00 a.m. Time at L1 exceeding: 17/03/2011 4:00 a.m. (+100 hour) Time at L2 exceeding: 17/03/2011 9:00 p.m. (+117 hour) No L3 exceeding Duration of L1 exceeding: 40 h Duration of L2 exceeding: 12 h

Hydrological forecasting: application, uncertainty, estimation, data assimilation and decision making EGU – Wien, 7th april 2011 Actual development -I Methodology Layout of information scheme Analysis and computations Terminology/simbology End users Frequency Equipments, human resources, activities - User manual

Hydrological forecasting: application, uncertainty, estimation, data assimilation and decision making EGU – Wien, 7th april 2011 Actual development- II Information import Synoptic - Civil Protection - Regional Centres reports System status checking Updating the system Anomalies Analysis P/Q_WL(hydrologic state), system performances, post processing Briefing Condivision National Civil Protecion, Agency for Po river, Regional Centres Information diffusion Information storing

Hydrological forecasting: application, uncertainty, estimation, data assimilation and decision making EGU – Wien, 7th april 2011 Actual development- III Procedure, scheme, information and analysis, terminology and symbology, time of emission and the other elements are different for each state They are intended to supply both useful information, with agreed uncertainty, and the best perception of what is occurring, balancing execution times and lead times required by decision makers, reducing missed alarms and false alarms Knowledge and awareness can be increased across the different states giving more and more information and analysis, raising diffusion frequency and giving diffusion advance

Hydrological forecasting: application, uncertainty, estimation, data assimilation and decision making EGU – Wien, 7th april 2011 Further steps Applications and further developments of the proposed methodology are related to: additions of modeling components to the operative system next operational steps (operational procedures, prototype definition and testing, errors recording and corrective actions) In the second phase coordination and information exchange actions will be furthermore focused.

Hydrological forecasting: application, uncertainty, estimation, data assimilation and decision making EGU – Wien, 7th april 2011 Thank you for your attention!

Hydrological forecasting: application, uncertainty, estimation, data assimilation and decision making EGU – Wien, 7th april 2011 Observed levels (gards) Rating curve Hydraulic model Hydrological model Observed precipitation Forecast precipitation