A.Montani; The COSMO-LEPS system. Recent developments and plans for the COSMO-LEPS system Andrea Montani, C. Marsigli, T. Paccagnella ARPA-SIMC HydroMeteoClimate.

Slides:



Advertisements
Similar presentations
1 The COSMO-LEPS ECMWF since June 2004 d-1 d d+5 d+1d+2 d+4d+3 middle EPS youngest EPS clustering period Cluster Analysis and RM identification.
Advertisements

Slide 1ECMWF forecast products users meeting – Reading, June 2005 Verification of weather parameters Anna Ghelli, ECMWF.
The COSMO-LEPS system at ECMWF
COSMO-SREPS COSMO Priority Project C. Marsigli, A. Montani and T. Paccagnella ARPA-SIM, Bologna, Italy.
© Crown copyright /0XXX Met Office and the Met Office logo are registered trademarks Met Office FitzRoy Road, Exeter, Devon, EX1 3PB United Kingdom.
Ensemble activities in COSMO C. Marsigli, A. Montani, T. Paccagnella ARPA-SIM - HydroMeteorological Service of Emilia-Romagna, Bologna, Italy.
WG7 summary and Science Plan Chiara Marsigli ARPA Emilia-Romagna, SIMC.
A.Montani; The COSMO-LEPS system. COSMO-LEPS: present status and developments Andrea Montani, D. Cesari, C. Marsigli, T. Paccagnella ARPA-SIMC HydroMeteoClimate.
COSMO GM2013.E.Astakhova,D.Alferov,A.Montani,etal The COSMO-based ensemble systems for the Sochi 2014 Winter Olympic Games: representation and use of EPS.
A.Montani; The COSMO-LEPS system. Present status and future plans of the COSMO-LEPS system Andrea Montani, D. Cesari, T. Diomede, C. Marsigli, T. Paccagnella.
WWOSC 2014, Aug 16 – 21, Montreal 1 Impact of initial ensemble perturbations provided by convective-scale ensemble data assimilation in the COSMO-DE model.
Implementation of KENDA at ARPA-SIMC and first experiences with an OSSE Chiara Marsigli Tiziana Paccagnella ARPA Emilia-Romagna, SIMC.
Summary of MAP D-PHASE Strategy and Requirements MAP D-PHASE / Olympics Project Meeting 6 February 2006 Prepared by: Ron McTaggart-Cowan.
How can LAMEPS * help you to make a better forecast for extreme weather Henrik Feddersen, DMI * LAMEPS =Limited-Area Model Ensemble Prediction.
A. Montani. - COSMO-LEPS for Sochi 2014 Development of a LAM-EPS system for Sochi Winter Olympics Andrea Montani C. Marsigli, T. Paccagnella ARPA-SIMC.
A.Montani; The COSMO-LEPS system: recent developments and plans 2nd Workshop on Short-Range EPS, Bologna, 7-8 April 2005 The COSMO-LEPS system: recent.
A.Montani; Eurorisk-Preview COSMO meeting, Zurich, September 2005 PREVIEW in some words (PREVention, Information and Early Warning) A project funded.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Data mining in the joint D- PHASE and COPS archive Mathias.
WORKSHOP ON SHORT-RANGE ENSEMBLE PREDICTION USING LIMITED-AREA MODELS Instituto National de Meteorologia, Madrid, 3-4 October 2002 Limited-Area Ensemble.
A.Montani; The COSMO-LEPS system: present status and outlook COSMO meeting, Offenbach, 7-11 September 2009 The COSMO-LEPS system: present status and outlook.
COSMO-SREPS Priority Project C. Marsigli ARPA-SIM - HydroMeteorological Service of Emilia-Romagna, Bologna, Italy.
A.Montani; The COSMO-LEPS system. COSMO-LEPS: present status and plans Andrea Montani, C. Marsigli, T. Paccagnella ARPA-SIMC HydroMeteoClimate Regional.
A. Montani. - COSMO-LEPS for Sochi 2014 Development of a LAM-EPS system for Sochi Winter Olympics Andrea Montani C. Marsigli, T. Paccagnella ARPA-SIMC.
COSMO WG4 Actvities Concentrated mainly on COSMO LEPS  presentation by Andrea Montani The rest of the activities have been absorbed into the advanced.
13th EMS Annual Meeting & 11th European Conference on Applications of Meteorology (ECAM) | 09 – 13 Sep.2013 | Reading, United Kingdom ASI – AS19 Interfacing.
Interoperability at INM Experience with the SREPS system J. A. García-Moya NWP – Spanish Met Service INM SRNWP Interoperability Workshop ECMWF –
Plans for Short-Range Ensemble Forecast at INM José A. García-Moya SMNT – INM Workshop on Short Range Ensemble Forecast Madrid, October,
A.Montani; The COSMO-LEPS system. COSMO-LEPS and COSMO-S14-EPS: what is old, what is new. Andrea Montani, C. Marsigli, T. Paccagnella ARPA-SIMC HydroMeteoClimate.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss WG 4 activities.
Development of a LAM ensemble for the 2014 Winter Olympic Games Andrea Montani, C. Marsigli, T. Paccagnella ARPA Emilia-Romagna Servizio IdroMeteoClima,
SREPS Priority Project COSMO General Meeting Cracov 2008 SREPS Priority Project: final report C. Marsigli, A. Montani, T. Paccagnella ARPA-SIM - HydroMeteorological.
A.Montani; Performance of the COSMO-LEPS system during DOP COSMO meeting - Cracow September 2008 Performance of the COSMO-LEPS system during D-PHASE.
A.Montani; COSMO-LEPS status, verification, … X COSMO meeting - Cracow September 2008 COSMO LEPS system: status, verification, applications Andrea.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss WG4 activities Пьер Экер MeteoSwiss, Geneva.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss A more reliable COSMO-LEPS F. Fundel, A. Walser, M. A.
SREPS Priority Project: final report C. Marsigli, A. Montani, T. Paccagnella ARPA-SIMC - HydroMeteorological Service of Emilia- Romagna, Bologna, Italy.
First experiments with KENDA for providing ICs to COSMO-It-EPS Chiara Marsigli Tiziana Paccagnella Andrea Montani ARPA Emilia-Romagna, SIMC.
Activities of the new WG7 Chiara Marsigli. WP Development of COSMO-LEPS Maintenance and updates of the operational suite at ECMWF (A. Montani) Study,
Langen, September 2003 COSMO-LEPS objective verification Chiara Marsigli, Francesco Boccanera, Andrea Montani, Fabrizio Nerozzi, Tiziana Paccagnella.
CONSENS Priority Project Status report COSMO year 2009/2010 Involved scientists: Chiara Marsigli, Andrea Montani, Tiziana Paccagnella, Tommaso Diomede.
General Meeting Moscow, 6-10 September 2010 High-Resolution verification for Temperature ( in northern Italy) Maria Stefania Tesini COSMO General Meeting.
Deutscher Wetterdienst Preliminary evaluation and verification of the pre-operational COSMO-DE Ensemble Prediction System Susanne Theis Christoph Gebhardt,
Performance of COSMO-LEPS over the Alpine region Chiara Marsigli, Andrea Montani, Fabrizio Nerozzi, Tiziana Paccagnella ARPA-SMR, Bologna, Italy ICAM/MAP.
PP CONSENS Merging COSMO-LEPS and COSMO- SREPS for the short-range Chiara Marsigli, Tiziana Paccagnella, Andrea Montani ARPA-SIMC, Bologna, Italy.
A study on the spread/error relationship of the COSMO-LEPS ensemble Purpose of the work  The spread-error spatial relationship is good, especially after.
Simulations of MAP IOPs with Lokal Modell: impact of nudging on forecast precipitation Francesco Boccanera, Andrea Montani ARPA – Servizio Idro-Meteorologico.
CONSENS Priority Project Status report COSMO year 2009/2010 Involved scientists: Chiara Marsigli, Andrea Montani, Tiziana Paccagnella, Tommaso Diomede.
A.Montani; Basin-oriented verification of COSMO-LEPS X COSMO meeting – Cracow – September 2008 Medium-range flood forecasting and warning X General.
Status of the NWP-System & based on COSMO managed by ARPA-SIM COSMO I77 kmBCs from IFSNudgingCINECA COSMO I22.8 kmBCs from COSMO I7 Interpolated from COSMO.
CONSENS Priority Project Status report COSMO year 2008/2009 Involved scientists: Chiara Marsigli, Andrea Montani, Tiziana Paccagnella, Tommaso Diomede.
A.Montani; The COSMO-LEPS system: 5-year milestone COSMO meeting, Athens, September 2007 The COSMO-LEPS system: getting close to the 5-year milestone.
WG4 Oct 2006 – Sep 2007 plans COSMO General Meeting, 21 September 2006 Pierre Eckert.
A.Montani; The COSMO-LEPS suite at ECMWF: present status and developments COSMO meeting, Zurich, September 2005 The COSMO-LEPS suite at ECMWF: present.
Eidgenössisches Departement des Innern EDI Bundesamt für Meteorologie und Klimatologie MeteoSchweiz Ensemble activites and plans at MeteoSwiss André Walser.
1Deutscher WetterdienstMärz 2005 April 2005: 19 NWS/ 21 forecast products (1) AustriaALADIN-LACE (9.6 km) ARPEGE (2) Czech Repub ALADIN-LACE (9 km) ARPEGE.
LEPS VERIFICATION ON MAP CASES
André Walser MeteoSwiss, Zurich
Arpae Hydro-Meteo-Climate Service, Bologna, Italy
A.Montani; The COSMO-LEPS system.
CIAO Priority Task Andrea Montani
COSMO-LEPS verification
COSMO-DE-EPS Susanne Theis, Christoph Gebhardt, Michael Buchhold,
Verification of COSMO-LEPS and coupling with a hydrologic model
Preliminary test for the development of a 2.8km ensemble over Italy
The COSMO-LEPS system: present status and outlook Andrea Montani, Chiara Marsigli and Tiziana Paccagnella ARPA-SIM Hydrometeorological service of Emilia-Romagna,
Christoph Gebhardt, Zied Ben Bouallègue, Michael Buchhold
SRNWP-PEPS COSMO General Meeting September 2005
MOGREPS developments and TIGGE
PREVIEW in some words (PREVention, Information and Early Warning)
Activities of WG7 Chiara Marsigli.
Presentation transcript:

A.Montani; The COSMO-LEPS system. Recent developments and plans for the COSMO-LEPS system Andrea Montani, C. Marsigli, T. Paccagnella ARPA-SIMC HydroMeteoClimate Regional Service of Emilia-Romagna, Bologna, Italy COSMO General meeting Lugano, September 2012

A.Montani; The COSMO-LEPS system. Outline Recent upgrades of COSMO-LEPS:  implementation of 00UTC COSMO-LEPS,  modifications in the set-up of members’ perturbations,  implementation of calibrated precipitation. Performance of the system:  time-series verification of COSMO-LEPS using SYNOP,  case study assessment (“nevone 2012”). Present/future work:  modifications to the clustering/selection technique,  first tests of COSMO-HYBrid-EPS. Summary and plans

A.Montani; The COSMO-LEPS system. Main changes during the COSMO year (1) 30 November 2011, COSMO-LEPS “doubles”: a new ECMWF time-critical application was prepared and sent to ECMWF as for the implementation of COSMO-LEPS also at 00UTC (cleps00); cleps00 and cleps12 have identical configurations (use of COSMO-EU analysis fields also for cleps00 since 18 January 2012); cleps00 is potentially more exposed to product delays because of ECMWF system sessions (never happened so far). 29 March 2012, no more random choice of the convection scheme: following requests of DWD, members 1-8 use Tiedtke convection scheme, members 9-16 use Kain-Fritsch. 3 July 2012, system upgrades: COSMO model upgraded to perturbation tuning; generation of calibrated 24-h TP over Germany, Switzerland, Emilia-Romagna; archive of ECMWF-EPS model level fields at 0.25x0.25 on a large domain to enable reruns (last 3 months).

A.Montani; The COSMO-LEPS system. COSMO-LEPS ECMWF: present status d-1 dd+5 d+1d+2 d+4d+3 older EPS younger EPS clustering period Cluster Analysis and RM identification 4 variables Z U V Q 3 levels hPa 2 time steps Cluster Analysis and RM identification European area Complete Linkage 16 Representative Members driving the 16 COSMO-model integrations (weighted according to the cluster populations) using either Tiedtke or Kain-Fritsch convection scheme (members 1-8 T, members 9-16 KF) + perturbations in turbulence scheme and in physical parameterisations COSMO- LEPS clustering area suite runs twice a day (00 and 12UTC) as a “time-critical application” managed by ARPA- SIMC; Δx ~ 7 km; 40 ML; fc+132h; COSM0 v4.21 since July 2012; computer time (30 million BUs for 2012) provided by the ECMWF member states in COSMO. COSMO- LEPS Integration Domain

A.Montani; The COSMO-LEPS system. Outline Performance of the system:  time-series verification of COSMO-LEPS using SYNOP ;  case study assessment (“nevone 2012”).

A.Montani; The COSMO-LEPS system. –SYNOP on the GTS Time-series verification of COSMO-LEPS Main features: variable: 12h cumulated precip (18-06, UTC); period : from Dec 2002 to Jul 2012; PHASE region: 43-50N, 2-18E (MAP D-PHASE area); method: nearest grid point; no-weighted fcst; obs: synop reports (about 470 stations/day); fcst ranges: 6-18h, 18-30h, …, h, h; thresholds: 1, 5, 10, 15, 25, 50 mm/12h; system: COSMO-LEPS; scores: ROC area, BSS, RPSS, Outliers, … both monthly and seasonal scores were computed

A.Montani; The COSMO-LEPS system. Time series of ROC area  Area under the curve in the HIT rate vs FAR diagram; the higher, the better …  Valuable forecast systems have ROC area values > 0.6.  Highest scores in the second part of 2011 for all but the highest threshold.  fc 30-42h: ROC area is low for the highest threshold for last winter; then recovery.  fc 78-90h: in the last months, some recovery of the score for the 15mm threshold, after a “difficult” beginning of the year.  Limited loss of predictability with increasing forecast range.

A.Montani; The COSMO-LEPS system. Heavy snowfalls in Emilia-Romagna (31/1 – 5/2/2012)

A.Montani; The COSMO-LEPS system. COSMO-I7 of 30/01/ UTC (+36-60h) h Snow observed (cm) over  the 24-hour period ending at 00UTC of 2/2/2012 forecasts (mm of equivalent water!)

A.Montani; The COSMO-LEPS system. COSMO-LEPS of 30/01/ UTC (+36-60h) available at UTC

A.Montani; The COSMO-LEPS system. COSMO-LEPS of 30/01/ UTC (+36-60h) COSMO-LEPS forecasts give early indication of possible heavy snowfall over the plain. COSMO-LEPS signal remained more stable and consistent than COSMO-I7.

A.Montani; The COSMO-LEPS system. Outline Present/future work:  modifications to the clustering/selection technique,  first tests of COSMO-HYBEPS.

A.Montani; The COSMO-LEPS system. Test modifications of clustering methodology Consider distances between ECMWF EPS members according to “COSMO-LEPS metric” (Z, U, V, Q in the mid-lower troposphere over the clustering domain). Look at distances between pairs of ECMWF EPS members; to what extent do these distances grow with forecast range (in “COSMO- LEPS metric”)? Study a number of seasons.  Outcome: modifications to the number of clusters / number of global EPSs considered / clustering intervals.

A.Montani; The COSMO-LEPS system. COSMO-HYBrid Ensemble Prediction System From the results of CONSENS PP, come to a synthesis with the different ensemble systems / strategies, considering scientific, implementation, solidity aspects. Generate 20-member hybrid ensemble (COSMO-HYBrid-EPS), where: a) 16 members comes from COSMO-LEPS, b) 1 member is nested on IFS (with Tiedtke scheme), c) 1 member is nested on IFS (with Kain-Fritsch scheme), d) 1 member is nested on GME, e) 1 member is nested on GFS. already existing from CONSENS. All members have Δx ~ 7 km; 40 ML; fc+132h. Study performance of different members’ combinations with the same ensemble size. “20-members esuite” implemented on 7/9/2012; will be run up to the end of the year.

A.Montani; The COSMO-LEPS system. Main results Time-series verification: ECMWF EPS changed substantially in the last years (more and more weight to EDA- based perturbations) and it is hard to disentangle improvements related to COSMO- LEPS upgrades from those due to better boundaries; nevertheless: –highest values of BSS and ROC area for the probabilistic prediction of 12-h precipitation for autumn 2011; –poor performance in the first months of 2012, then recovery. Need to investigate what happened. Case-study verification: consistent signal of high-impact weather events for the snowfalls of February Other achievements: provision of ICs and BCs for convective-permitting ensembles; operational dissemination implemented for Romania; reorganisation of post-processing with Fieldextra.

A.Montani; The COSMO-LEPS system. Test modifications to the clustering methodology. Test COSMO-HYBrid-EPS. Increase vertical resolution? ensemble size?... tonight’s discussion. LAMEPS_BC project  consider possible modifications to COSMO-LEPS suite. COSMO-LEPS for TIGGE-LAM (GRIB2 encoding). COSMO-LEPS twice a day: generate probabilistic products from lagged ensembles. Future plans Support calibration and verification (  Versus?). Carry on collaboration within research project (HyMeX, EFAS, SAFEWIND, IMPRINTS, …).

A.Montani; The COSMO-LEPS system. Thank you !